BLD-Final | 6/27/2017 | 6/27/2017 | 6/27/2017 | P | PASS |
Dave Hannah
|
|
|
david Phone #: ###-####
|
DOC - Permit Finaled | 6/27/2017 | 6/27/2017 | 6/27/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 5/18/2017 | 5/18/2017 | 5/18/2017 | P | PASS |
Dave Hannah
|
|
|
David Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/17/2017 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 5/16/2017 | | |
|
|
|
|
Routing Walk-In (Zoning) | 5/16/2017 | 5/16/2017 | 5/16/2017 | P | DONE |
David Moser
|
|
|
|
Routing Walk-In (BLD) | 5/16/2017 | 5/16/2017 | 5/16/2017 | P | DONE |
Jason C. Taylor
|
|
|
|
Routing Walk-In (PW Hillside) | 5/16/2017 | 5/16/2017 | 5/16/2017 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
1st review completed | | | 5/16/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/16/2017 | | 5/16/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 5/16/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 5/16/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/16/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 5/16/2017 | | DONE |
Christina Prado
|
|
|
Need RP for issuance
|
Application received | | | 5/12/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 12 2017 1:16PM
|