BLD-Final | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | PASS |
Dave Hannah
|
|
|
Chad Phone #: ###-####
|
PubWorks Occupancy Approval | 8/14/2018 | 8/14/2018 | 8/14/2018 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 8/14/2018 | | DONE |
|
|
|
|
BLD-Other | 8/10/2018 | 8/13/2018 | 8/13/2018 | A | PEND |
Dave Hannah
|
|
|
Structural // Chad Phone #: ###-#### needs to drop one sink in bottom units
|
FIRE-Final Inspection | 8/10/2018 | 8/13/2018 | 8/13/2018 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection complete.
Chad Phone #: ###-####
|
FIRE-Final Inspection | 8/10/2018 | 8/10/2018 | 8/10/2018 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete.
|
FIRE-Final Inspection | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | FAIL |
Jim Page
|
|
|
Provide fire emrgency guide for each unit as stated in note number 14 of building permit fire review. Provide emergency lighting for exterior discharge landing as stated in note number 12 of fire review comments.
Chad Phone #: ###-####
|
Zoning Approval | 8/3/2018 | 8/3/2018 | 8/3/2018 | | DONE |
Susan Riggs
|
|
|
|
BLD-Aging Inspection | 7/27/2018 | 7/27/2018 | 7/30/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 7/26/2018 | 7/26/2018 | 7/30/2018 | | PEND |
Dave Hannah
|
|
|
|
Print Occupancy Form | | | 7/19/2018 | | DONE |
|
|
|
|
BLD-Conference | 7/5/2018 | 7/6/2018 | 7/6/2018 | A | PASS |
Dave Hannah
|
|
|
chad Phone #: ###-####
|
BLD-Conference | 7/3/2018 | 7/3/2018 | 7/3/2018 | P | PASS |
Dave Hannah
|
|
|
Chad Phone #: ###-#### talked about handrails
|
FIRE-Conference | 5/15/2018 | 5/16/2018 | 5/16/2018 | A | DONE |
Jim Page
|
|
|
Fire conference for fire extinguisher placement complete.
chad Phone #: ###-####
|
BLD-Energy code compliance | 3/13/2018 | 3/14/2018 | 3/14/2018 | A | PASS |
Dave Hannah
|
|
|
Chad Phone #: ###-####
|
BLD-Energy code compliance | 3/5/2018 | 3/6/2018 | 3/6/2018 | A | PART |
Dave Hannah
|
|
|
Chad Phone #: ###-#### ok to cover second floor
|
BLD-Framing/Rough-in | 2/9/2018 | 2/12/2018 | 2/13/2018 | A | PEND |
Dave Hannah
|
|
|
needs other trades to sign off rough ina framing is ok
|
BLD-Conference | 2/8/2018 | 2/9/2018 | 2/9/2018 | P | PASS |
Dave Hannah
|
|
|
Chad Phone #: ###-####
|
BLD-Wall Bracing | 1/24/2018 | 1/24/2018 | 1/25/2018 | P | PASS |
Dave Hannah
|
|
|
shear wall- Chad Phone #: ###-####
|
Plan Modification Accepted | | | 1/10/2018 | | DONE |
|
|
|
new manual j reports
|
Routing - MECHANICAL | 1/10/2018 | | 1/10/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j reports
|
BLD-Conference | 12/22/2017 | 12/22/2017 | 12/22/2017 | P | PART |
Dave Hannah
|
|
|
Call ahead to meet // Chad Phone #: ###-#### ok to cover 1hr fire walls behind tubs
|
BLD-Framing/Rough-in | 12/5/2017 | 12/5/2017 | 12/5/2017 | P | NR |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|
BLD-Foundation | 9/11/2017 | 9/12/2017 | 9/13/2017 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 9/5/2017 | 9/6/2017 | 9/7/2017 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
Plan Modification Accepted | | | 9/7/2017 | | DONE |
|
|
|
New manual j reports
|
Routing - MECHANICAL | 9/7/2017 | | 9/7/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j reports
|
OVERRIDE | | | 8/30/2017 | | |
|
|
|
|
Plan assigned to (JAR) | 5/19/2017 | 5/19/2017 | 8/30/2017 | | DONE |
Julie Romig
|
|
|
1st Review Comp - 2nd Review Comp - 502 PAPER Verroso Downtown Multi-family
|
Issue PAID IN FULL permit | | | 8/30/2017 | | DONE |
|
|
|
|
Routing - Design Review | 8/28/2017 | | 8/30/2017 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH17-00387
|
Routing Off Site - STRUCTURAL | 8/30/2017 | | 8/30/2017 | | PASS |
Julie Romig
|
|
|
5th Review. Applicant notified.
|
Case Summary (BLD) | | | 8/30/2017 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/30/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/30/2017 | | DONE |
|
|
|
All met
|
Plan Reviewer's activity | | | 8/28/2017 | | DONE |
Julie Romig
|
|
|
Emailed applicant structural review comments and let him know building plan review is approved pending structural approval.
|
Routing - PLAN CHECK | 8/28/2017 | | 8/28/2017 | | PASS |
Julie Romig
|
|
|
Building Plan Review approved pending approved structural
|
Routing Off Site - STRUCTURAL | 8/24/2017 | | 8/28/2017 | | FAIL |
Julie Romig
|
|
|
4th Structural Review - Plan Review Report emailed to applicant
|
Routing - PLAN CHECK | 8/25/2017 | | 8/25/2017 | | FAIL |
Julie Romig
|
|
|
3rd Review - Received all plans but mechanical on 8/24. Notified applicant that all submitted items were approved. Mechanical plans submitted 8/25 but missing information regarding bathroom/laundry exhaust fan in rated ceiling. Notified applicant to submit revised M0.01.
|
Routing - Design Review | 8/21/2017 | | 8/23/2017 | | FAIL |
Sarah Schafer
|
|
|
A Design Review modification application is needed for the changes. I will notifiy the applicant.
|
Routing - PLAN CHECK | 8/7/2017 | | 8/22/2017 | | FAIL |
Julie Romig
|
|
|
Plan review report emailed to applicant.
|
Routing Off Site - STRUCTURAL | 8/15/2017 | | 8/21/2017 | | PASS |
Julie Romig
|
|
|
3rd Review
|
Routing - PUBLIC WORKS | 8/16/2017 | | 8/16/2017 | | PASS |
Rachael Beierle
|
|
|
PASS PER KSR
|
Routing - MECHANICAL | 8/15/2017 | | 8/16/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 8/15/2017 | | 8/16/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing PW Sewer Design | 8/7/2017 | | 8/15/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Solid Waste | 8/7/2017 | | 8/15/2017 | | PASS |
Evan Carpenter
|
|
|
Approved for alley cart service.
|
Routing - PUBLIC WORKS | 8/7/2017 | | 8/15/2017 | | FAIL |
Rachael Beierle
|
|
|
FAIL. SEE SEWER DESIGN.
|
Routing PW Street Lights | 8/7/2017 | | 8/15/2017 | | PASS |
Tom Marshall
|
|
|
|
Plan resubmittals received | | | 8/15/2017 | | |
Christina Prado
|
|
|
Received three sets of revised sheets marked A-1, A-2, A-3, A-14, A-15, A-16, A-17 & A-18, as well as three revised calculations: Plans stamped and taken to JAR for review
|
Routing PW Sewer Design | 8/15/2017 | | 8/15/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Connecting to existing services.
|
Routing - FIRE | 8/7/2017 | 8/7/2017 | 8/11/2017 | | PASS |
Scott Arellano
|
|
|
No change to original plan review report.
|
Routing Off Site - STRUCTURAL | 8/7/2017 | | 8/11/2017 | | FAIL |
Julie Romig
|
|
|
Structural comments emailed to appplicant.
|
Routing PW Geothermal | 8/7/2017 | | 8/9/2017 | | PASS |
Jon R. Gunnerson
|
|
|
No geothermal commitment provided. If wishing to connect onto the geothermal system, contact Public Works ###-####.
|
Telephone call | | | 8/7/2017 | | DONE |
|
|
|
called courier for pick up to outside structural review
|
Plan resubmittals received | | | 8/7/2017 | | DONE |
|
|
|
received three copies of response, structural calcs, plan sheets T1, A1 through A19, E1 through E11, P1 through P9, M0.01, M1.01, M2.01, M3.01; taken to Julie Romig.
|
Route to Impact Fee Review | 7/28/2017 | 7/31/2017 | 8/1/2017 | | PASS |
Marissa Taylor
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 7/28/2017 | | FAIL |
|
|
|
Failed Structural, Plan Check, Public Works.
|
Routing - FIRE | 7/26/2017 | | 7/28/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing - PLAN CHECK | 6/5/2017 | | 7/25/2017 | | FAIL |
Julie Romig
|
|
|
Plan Review Report emailed to applicant.
|
Routing - PLANNING | 5/30/2017 | | 7/20/2017 | | PASS |
Susan Riggs
|
|
|
Approval is pending CUP17-00049, the modification for the demolition of the warehouse building. The appeal period ends August 4th. Do not issue permit unti 5:00 on the 4th.
|
Plan Reviewer's activity | | | 7/20/2017 | | DONE |
|
|
|
Plans originally passed by Planning on 05/30/17 and Design Review on 05/31/17. Changed to Fail by SAR on 07/20/17.
|
Routing PW Street Lights | 7/6/2017 | | 7/6/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing Off Site - STRUCTURAL | 5/18/2017 | | 6/6/2017 | | FAIL |
Julie Romig
|
|
|
Structural Plan Review report emailed to architect.
|
Routing - MECHANICAL | | | 6/5/2017 | | PASS |
|
|
|
|
Routing - PLUMBING | | | 6/5/2017 | | PASS |
|
|
|
1) all water branch sizing to be per ISPC
2) all vent connections to be above flood level rim
|
Routing - Design Review | 5/30/2017 | | 5/31/2017 | | PASS |
Sarah Schafer
|
|
|
Approval is pending CUP17-00049, the modification for the demolition of the warehouse building. The appeal period ends August 4th. Do not issue permit until 5:00 on the 4th.
|
Routing - Erosion and Sediment | 5/31/2017 | | 5/31/2017 | | PASS |
Melissa Jannusch
|
|
|
Plan approved. RP TBD need to be designated before construction begins
|
Routing PW Geothermal | 5/30/2017 | | 5/30/2017 | | FAIL |
Jon R. Gunnerson
|
|
|
No commitment to use geothermal. If desired, contact Public Works, Jon Gunnerson ###-####
|
Routing - PUBLIC WORKS | | | 5/30/2017 | | FAIL |
|
|
|
|
Routing PW Drainage | 5/26/2017 | | 5/26/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 5/25/2017 | | 5/26/2017 | | FAIL |
Tom Marshall
|
|
|
Street light plan failed because there was no plan.
|
Routing PW Sewer Design | 5/26/2017 | | 5/26/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Demo Plan: 2 sewer services exist for current building. Services to be permenantly abandoned shall be capped at the sewer main. Obtain plug permits from Boise Public Works 48 hours prior to sewer work in the alley.
New Plan: Indicate in civil sheets intention for new service to building. Use existing sewer service or show new type "D" tap from sewer main. Obtain tap permits from Boise Public Works 48 hours prior to adding a new sewer service in the alley.
|
Routing PW Solid Waste | 5/23/2017 | | 5/26/2017 | | FAIL |
Evan Carpenter
|
|
|
Access gate from alley does not allow enough room for the collection truck to make the 90 degree turn to access the garage entry area.
|
Routing PW Sewer Rating | 5/23/2017 | | 5/23/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 5/18/2017 | | 5/22/2017 | | PASS |
Laura Hunter
|
|
|
Changed address to 1424 W Front St with 8 apartments, Apt 101-103 and Apt 201-205
|
Plan assigned to (CDM) | 5/17/2017 | 5/17/2017 | 5/19/2017 | | DEFR |
Julie Romig
|
|
|
|
Routing - PLANNING Land Div | 5/18/2017 | | 5/18/2017 | | PASS |
Todd Tucker
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/17/2017 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/16/2017 | | DONE |
|
|
|
|
Intake Approval | | | 5/16/2017 | | PASS |
Carl D Madsen
|
|
|
per CDM
|
First Notice | | 8/24/2018 | | | |
|
|
|
|
Application received | | 5/16/2017 | | | |
|
|
|
|