Print Statement | | | 12/19/2017 | | DONE |
|
|
|
|
Third Notice | | 11/19/2017 | 12/12/2017 | | DONE |
|
|
|
Mailed 12-13-7
|
Second Notice | | 10/22/2017 | 11/14/2017 | | DONE |
|
|
|
Mailed 11-15-17
|
First Notice | | 9/28/2017 | 10/12/2017 | | DONE |
|
|
|
Mailed 10-13-17
|
Permanent Occupancy | | | 9/18/2017 | | DONE |
|
|
|
|
Temporary Occupancy | 8/28/2017 | 11/26/2017 | 8/28/2017 | | DONE |
Christina Prado
|
|
|
|
PubWorks Occupancy Approval | 8/28/2017 | 8/28/2017 | 8/28/2017 | | DONE |
Tiffany Lowery
|
|
|
|
Print Occupancy Form | | | 8/25/2017 | | DONE |
|
|
|
|
BLD-Final | 8/24/2017 | 8/24/2017 | 8/24/2017 | P | PASS |
Jim Storey
|
|
|
ELE Final Scheduled for 8-24-17 PM// Gabe Phone #: ###-#### ramp and stairs ok pending ele-9/18/17 as per Jim Storey ok for perm c of o
|
FIRE-Final Inspection | 8/24/2017 | 8/24/2017 | 8/24/2017 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, fire alarm inspection complete, fire extinguisjers are in place with current inspection tags (fire extinguisher inspection tags expire at the end of August) Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 8/21/2017 | 8/22/2017 | 8/22/2017 | P | CANC |
Jim Page
|
|
|
Project has an attached FIR permit in issued status, fire alarm inspection needs to be complete and passed before life fire safety inspection can be performed. This inspection request is cancelled.
|
PubWorks Temp Occupancy Appr | 8/22/2017 | 8/22/2017 | 8/22/2017 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 8/19/2017 | 8/21/2017 | 8/21/2017 | A | CANC |
Jim Page
|
|
|
Project hasan attached FIR permit in issued status, fire inspection needs to be complete and passed before life fire saety inspection can be performed. This inspection request is cancelled.
|
Zoning Approval | 8/18/2017 | 8/18/2017 | 8/18/2017 | | DONE |
Katelyn Menuge
|
|
|
No Zoning Inspection Required
|
BLD-Framing/Rough-in | 7/24/2017 | 7/24/2017 | 7/24/2017 | P | PASS |
Jim Storey
|
|
|
Gabe Phone #: ###-####
|
Print Occupancy Form | | | 7/24/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/10/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/10/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/22/2017 | | DONE |
|
|
|
customer brought in O & M and Append J-took to Brian Murphy
|
OVERRIDE | | | 6/19/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 6/17/2017 | 6/17/2017 | 6/19/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 6/17/2017 | | 6/19/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 6/17/2017 | | 6/19/2017 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Design Review | 6/17/2017 | | 6/19/2017 | | PASS |
Katelyn Menuge
|
|
|
Per CUP17-00025
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/19/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/19/2017 | | DONE |
|
|
|
ALL MET
|
OVERRIDE | | | 6/5/2017 | | |
|
|
|
|
Route to Impact Fee Review | 5/29/2017 | 6/1/2017 | 6/5/2017 | | PASS |
Marissa Taylor
|
|
|
Review requested for Commercial Permit
|
Permit Ready to Issue | | | 6/5/2017 | | DONE |
|
|
|
need GC and rev cert of val
|
Plan assigned to (CDM) | 5/19/2017 | 5/19/2017 | 5/30/2017 | | PASS |
Carl D Madsen
|
|
|
1st comp White Pine Elementary Modular
|
Routing - PLAN CHECK | 5/30/2017 | | 5/30/2017 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/30/2017 | | DONE |
|
|
|
|
1st review completed | | | 5/29/2017 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 5/19/2017 | | 5/29/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLANNING Land Div | 5/19/2017 | | 5/23/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 5/19/2017 | | 5/22/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PLANNING | 5/19/2017 | | 5/22/2017 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Erosion and Sediment | 5/19/2017 | | 5/22/2017 | | PASS |
Andy J. Long
|
|
|
Plan approved
|
Routing PW Drainage | 5/19/2017 | | 5/22/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 5/19/2017 | 5/19/2017 | 5/19/2017 | | PASS |
Katie Marron
|
|
|
Permit to relocate an existing portable classroom from one school to White Pine Elementary. Classroom fire alarm devices will be tied into main building alarm system. No comments attached.
|
Intake Approval | | | 5/19/2017 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/19/2017 | | 5/19/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 5/19/2017 | | 5/19/2017 | | PASS |
Sarah Schafer
|
|
|
Per CUP17-00025.
|
Intake Approval | | | 5/17/2017 | | FAIL |
|
|
|
Need:
1. Verification of Legal Lot or Parcel Form. Contact Todd Tucker at ###-####.
2. Sheet A2.12 needs Structural Engineer stamp and signature.
3. Rotate all landscape drawings.
|
Application received | | | 5/16/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 16 2017 9:46AM
|