Second Notice | | 8/20/2017 | 9/11/2017 | | DONE |
|
|
|
This permit finaled on the web by jacob johnson
|
First Notice | 7/27/2017 | 7/27/2017 | 8/10/2017 | | DONE |
Jim Sly
|
|
|
Mailed 8-11-17
|
BLD-Final | 7/26/2017 | 7/27/2017 | 7/27/2017 | P | PASS |
Jim Sly
|
|
|
Kipp-would like as early as possible Phone #: ###-#### OK for Perm Occ.
|
DOC - Permit Finaled | 7/27/2017 | 7/27/2017 | 7/27/2017 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 7/25/2017 | 7/26/2017 | 7/26/2017 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Zoning Approval | 7/26/2017 | 7/26/2017 | 7/26/2017 | | PASS |
Katelyn Menuge
|
|
|
Design Review-DRH17-00180
|
BLD-Final | 7/24/2017 | 7/25/2017 | 7/25/2017 | P | NR |
Jim Sly
|
|
|
Ben Phone #: ###-#### Went over Required inspection to obtain Cert of Occ.
|
FIRE-Final Inspection | 7/24/2017 | 7/25/2017 | 7/25/2017 | A | FAIL |
Troy Cobbley
|
|
|
Provide re-certification of both hood suppression systems, repair/install all exit signs/emergency lights/exit discharge lights and provide testing, provide tagged fire extinguishers per plans and discussion, provide occupant load sign, provide data sheet verifying the restroom doors meet ADA, blank keyed dead bolt to Play Land.
|
Inspection Record Card- Bld | | | 7/25/2017 | | DONE |
|
|
|
|
BLD-Ceiling Grid Inspection | 7/19/2017 | 7/20/2017 | 7/20/2017 | A | PASS |
Jim Sly
|
|
|
Ben Phone #: ###-####
|
BLD-Framing/Rough-in | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | PASS |
Jim Sly
|
|
|
Ben Phone #: ###-####
|
BLD-Framing/Rough-in | 7/11/2017 | 7/12/2017 | 7/12/2017 | A | PASS |
Jim Sly
|
|
|
Ben Phone #: ###-####
|
BLD-Framing/Rough-in | 7/10/2017 | 7/11/2017 | 7/11/2017 | A | PART |
Jim Sly
|
|
|
Ben Phone #: ###-#### Metal framed drop soffits.....OK.
|
BLD-Framing/Rough-in | 7/7/2017 | 7/10/2017 | 7/10/2017 | A | PART |
Jim Sly
|
|
|
Ben Phone #: ###-#### All framing OK except Rest Rooms.
|
OVERRIDE | | | 7/5/2017 | | |
|
|
|
|
Telephone call | | | 7/5/2017 | | DONE |
|
|
|
Spoke with Ke informing her that this permit is ready and that we need a 306, 302 and who the RP will be from the GC
|
Inspection Record Card- Bld | | | 7/5/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/5/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2017 | | DONE |
|
|
|
showing in REV still since a case summary was done after Julie had signed off on Plans taken to front desk
|
Permit Ready to Issue | | | 7/5/2017 | | DONE |
|
|
|
Need RP, GC Form and Revised Cert of Value
|
Route to Impact Fee Review | 6/29/2017 | 7/5/2017 | 7/4/2017 | | PASS |
Eric Bilimoria
|
|
|
|
Plan assigned to (JAR) | 5/23/2017 | 5/23/2017 | 6/30/2017 | | DONE |
Julie Romig
|
|
|
1st Review Comp - Resubmitted 06/29 - PAPER - Burger King TI.
|
Case Summary (BLD) | | | 6/30/2017 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/30/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/29/2017 | | 6/30/2017 | | PASS |
Julie Romig
|
|
|
|
1st review completed | | | 6/28/2017 | | FAIL |
Julie Romig
|
|
|
Emailed plan review report to applicant.
|
Routing - PLAN CHECK | 6/5/2017 | | 6/28/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing - FIRE | 6/23/2017 | | 6/23/2017 | | PASS |
Scott Arellano
|
|
|
Basic Life Safety. Minor work on kitchen finishes; no work/changes to equipment. Verify existing kitchen hood system is current with inspection tag.
|
Plan Reviewer's activity | | | 6/23/2017 | | |
|
|
|
Spoke with applicant regarding time frame. Call when review is complete at ###-####.
|
Routing - Design Review | 6/7/2017 | | 6/7/2017 | | PASS |
Katelyn Menuge
|
|
|
Idaho Power Approval Received. Design Review per DRH17-00180
|
Routing - PLUMBING | | | 6/5/2017 | | PASS |
Bill VanDegrift
|
|
|
restroom remodel. no work in the kitchen.
|
Routing - Erosion and Sediment | | | 5/31/2017 | | PASS |
Melissa Jannusch
|
|
|
Plan waiver approved. Need to designate RP.
|
Routing - Design Review | 5/25/2017 | | 5/26/2017 | | FAIL |
Katelyn Menuge
|
|
|
Drawings Okay-Need approval letter from Idaho Power
|
Routing PW Environmental | 5/23/2017 | | 5/25/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - PUBLIC WORKS | | | 5/25/2017 | | PASS |
Rachael Beierle
|
|
|
|
Telephone call | | | 5/23/2017 | | DONE |
|
|
|
called Bfrian to see if he was sending the struc calcs-he said he sent them with them with the plans but they weren't in there so he is emailing them to me and I'll take them to Julie
|
Intake Approval | | | 5/23/2017 | | PASS |
|
|
|
Received stamped finish drawings and structural calcs.
|
Routing - Addressing | 5/23/2017 | | 5/23/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing PW Sewer Rating | 5/23/2017 | | 5/23/2017 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/17/2017 | | DONE |
|
|
|
|
Intake Approval | | | 5/17/2017 | | FAIL |
|
|
|
Need stamped finish drawings and structural calcs. Julie held drawing set, waiting for architect to mail rest of drawings and calcs and will incorporate into sets already received.
|
Recd Pcfee & Taken To Pln CK | | | 5/17/2017 | | DONE |
|
|
|
|
Application received | | 5/17/2017 | | | |
|
|
|
|