Meeting | | | 1/16/2020 | | DONE |
|
|
|
Per contact with Renee New with Boise Airport, all value should have been claimed on BLD17-00386. Minimal work was done under BLD17-01549 to establish square footage for tenant space addition and remodel. Majority of value (minus minimum value) was moved to BLD17-00386 per final value submitted. Credit for fees erraneously paid on BLD17-01549 are credited to BLD17-00386.
|
BLD-Final | 1/8/2020 | 1/9/2020 | 1/9/2020 | P | DONE |
Jim Storey
|
|
|
Inspection requested via web by Ron Goff
|
DOC - Permit Finaled | 1/9/2020 | 1/9/2020 | 1/9/2020 | P | PASS |
Jim Storey
|
|
|
as dircted bt planreviewer
|
FIRE-Final Inspection | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Phone #: ###-#### Inspection requested via web by Ron Goff
|
FIRE-Sprinkler Rough-in | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | CANC |
Troy Cobbley
|
|
|
Permit BLD19-01885 finaled for FED EX. No inspection required. **JHB** Phone #: ###-#### >> Inspection requested via web by Ron Goff
|
FIRE-Alarm Testing | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | CANC |
Troy Cobbley
|
|
|
Permit BLD19-01885 finaled for FED EX. No inspection required. **JHB** Phone #: ###-#### >> Inspection requested via web by Ron Goff
|
FIRE-Final Inspection | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | FAIL |
Jim Page
|
|
|
Per project description, no occupancy under this permit, items/vehicles are parked/stored inside, a seperate permit for occupancy needs to be issued or items need to be removed from space as discussed.
Phone #: ###-#### Inspection requested via web by Ron Goff
|
BLD-Final | 1/7/2020 | 1/8/2020 | 1/8/2020 | P | CANC |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Ron Goff Inspection cancelled from web by: Ron Goff
|
FIRE-Sprinkler Rough-in | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | CANC |
Jim Page
|
|
|
Wrong inspection type requested, this request is cancelled.
Phone #: ###-#### Inspection requested via web by Ron Goff
|
FIRE-Alarm Testing | 1/7/2020 | 1/8/2020 | 1/8/2020 | A | CANC |
Jim Page
|
|
|
Wrong inspection type requested, this request is cancelled.
Phone #: ###-#### Inspection requested via web by Ron Goff
|
Telephone call | | | 1/6/2020 | | DONE |
|
|
|
spoke with Carl on the mechanical signature tab needed for this permit(BLD17-01549), Perkins Construction pulled BLD17-00386 & BLD19-01885, therefore these are the only ones that will need mechanical permits.
|
Change Expiration Date Only | | | 10/15/2019 | | DONE |
Jason Blais
|
|
|
A 180 day extension approved. First extension for an issued permit.
|
BLD-Ceiling Grid Inspection | 5/24/2019 | 5/24/2019 | 5/24/2019 | A | PASS |
Jim Storey
|
|
|
Call when at the gate Phone #: ###-#### Inspection requested via web by Harvey VanderVeen
|
BLD-Energy code compliance | 4/26/2019 | 4/26/2019 | 4/26/2019 | P | PART |
Brandon Shaw
|
|
|
Early afternoon, if possible. Call when at the gate. Thanks. Phone #: ###-#### Inspection requested via web by Harvey VanderVeen
|
BLD-Aging Inspection | 4/25/2019 | 4/25/2019 | 4/25/2019 | | PASS |
Jim Storey
|
|
|
|
FIRE-Conference | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | DONE |
Troy Cobbley
|
|
|
Renee and I discussed the location for the building address and agreed for it to be placed on the east side of the hose tower.
|
BLD-Ceiling Grid Inspection | 4/17/2019 | 4/17/2019 | 4/17/2019 | A | PASS |
Jim Storey
|
|
|
Please call when at the gate Phone #: ###-#### Inspection requested via web by Harvey VanderVeen
|
BLD-Ceiling Grid Inspection | 2/6/2019 | 2/7/2019 | 2/7/2019 | A | PASS |
Jim Storey
|
|
|
Call when at the gate Phone #: ###-#### Inspection requested via web by Harvey VanderVeen
|
BLD-Framing/Rough-in | 12/12/2018 | 12/12/2018 | 12/12/2018 | P | PASS |
Dave Hannah
|
|
|
Early afternoon, if possible. Project is in secure area at Airport. Please call when you are at the Gate (Gate 30) Phone #: ###-#### Inspection requested via web by Harvey VanderVeen ph 3 ok to cover
|
Plan Reviewer's activity | | | 10/19/2018 | | DONE |
Daryl DeGrange
|
|
|
Up load document
|
BLD-Ceiling Grid Inspection | 9/13/2018 | 9/13/2018 | 9/13/2018 | A | PART |
Dave Hannah
|
|
|
Please call when at the gate Phone #: ###-#### Inspection requested via web by Harvey VanderVeen kitchen commanders room and bunk area ok to flood
|
BLD-Framing/Rough-in | 7/5/2018 | 7/6/2018 | 7/6/2018 | A | PASS |
Jim Storey
|
|
|
Call when at the gate. Phone #: ###-#### Inspection requested via web by Harvey VanderVeen phase 2 ok to cover pending trade aprovals// 11/2 insulation north/south walls to roof deck/
|
BLD-Energy code compliance | 6/6/2018 | 6/6/2018 | 6/6/2018 | A | PASS |
Jim Storey
|
|
|
Please call when at the gate. Phone #: ###-#### Inspection requested via web by Harvey VanderVeen vapor barrior ok in kitchen area under slab
|
BLD-Footing | 5/7/2018 | 5/7/2018 | 5/7/2018 | P | PASS |
Jim Storey
|
|
|
Concrete is scheduled for 2:00 pm. Please call when at the gate for admittance on to property. Thanks. Phone #: ###-#### Inspection requested via web by Harvey VanderVeen ft and wall ok for placement.
|
BLD-Energy code compliance | 2/8/2018 | 2/9/2018 | 2/9/2018 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Harvey VanderVeen vapor barrior in place for slab placment/ rebar ok
|
BLD-Foundation | 11/16/2017 | 11/16/2017 | 11/16/2017 | P | PASS |
Jim Storey
|
|
|
Around 2:30 PM, if possible. Call when at the gate. Thanks Phone #: ###-#### Inspection requested via web by Harvey VanderVeen
|
BLD-Foundation | 11/16/2017 | 11/16/2017 | 11/16/2017 | P | CANC |
Jim Storey
|
|
|
Right after lunch, if possible. They would like to pour around 2:00 PM Phone #: ###-#### >> Inspection requested via web by Harvey VanderVeen Inspection cancelled from web by: Harvey VanderVeen
|
BLD-Footing | 11/8/2017 | 11/9/2017 | 11/9/2017 | P | PASS |
Jim Storey
|
|
|
After lunch, if possible. Call when at the gate for admittance into secure Airport Property Phone #: ###-#### Inspection requested via web by Harvey VanderVeen mti pending
|
Issue PAID IN FULL permit | | | 9/13/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/13/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/18/2017 | | 5/19/2017 | | PASS |
Carl D Madsen
|
|
|
|
Permit Ready to Issue | | | 5/19/2017 | | DONE |
Christina Prado
|
|
|
Need GC Form - met 8-31-17
& Revised Certificate of Value for issuance - met 8-31-17
DO NOT ISSUE WITHOUT BLD17-00386
|
Plan assigned to (CDM) | 5/18/2017 | 5/18/2017 | 5/18/2017 | | PASS |
Carl D Madsen
|
|
|
|
Intake Approval | | | 5/18/2017 | | |
|
|
|
|
1st review completed | | | 5/18/2017 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2017 | | DONE |
|
|
|
|
Application received | | 5/18/2017 | | | |
|
|
|
|
Application received | | 5/18/2017 | | | |
|
|
|
|