BLD-Final | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PASS |
Tony Young
|
|
|
|
Zoning Approval | 4/23/2019 | 4/23/2019 | 4/23/2019 | | PASS |
Josh Wilson
|
|
|
|
PubWorks Occupancy Approval | 4/23/2019 | 4/23/2019 | 4/23/2019 | | DONE |
Tiffany Lowery
|
|
|
Engineer letter received 04/22/19
|
Zoning Approval Temp | 4/23/2019 | 4/23/2019 | 4/23/2019 | | PASS |
Josh Wilson
|
|
|
30-day Temporary Occupancy for installation of street trees in ROW
|
Permanent Occupancy | | | 4/23/2019 | | DONE |
|
|
|
|
BLD-Final | 4/14/2019 | 4/15/2019 | 4/15/2019 | P | PART |
Tony Young
|
|
|
Need final life safety, landscaping, zoning, and building. Any questions please call Andy at ###-####. Phone #: ###-#### Inspection requested via web by Andy Eells,, ok pending others for a perm. c of o
|
FIRE-Final Inspection | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete.
Andy Phone #: ###-####
|
BLD-Energy code compliance | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | PASS |
Dave Hannah
|
|
|
Insulation inspection first floor approved plans are under stairs. If you have any questions please call Andy at ###-#### Phone #: ###-#### Inspection requested via web by Andy Eells
|
BLD-Energy code compliance | 1/16/2019 | 1/17/2019 | 1/17/2019 | A | PASS |
Dave Hannah
|
|
|
Insulation inspection first floor approved plans are under stairs. If you have any questions please call Andy at ###-#### Phone #: ###-#### Inspection requested via web by Andy Eells
|
BLD-Energy code compliance | 1/15/2019 | 1/15/2019 | 1/15/2019 | A | PASS |
Dave Hannah
|
|
|
3rd floor and 2nd floor ready possibly 1st depending on inspection time. Plans under stairs in mechanical room lock box code CORE. please call ahead so I can meet you there. Andy 2086317535 Phone #: ###-#### Inspection requested via web by Andy Eells
|
BLD-Framing/Rough-in | 1/8/2019 | 1/8/2019 | 1/9/2019 | P | PASS |
Dave Hannah
|
|
|
Andy Phone #: ###-####
|
Print Occupancy Form | | | 1/8/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/8/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/8/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/8/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/8/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 1/7/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 1/7/2019 | | DONE |
|
|
|
PLAN MOD
|
Plan assigned to (JAR) | 12/11/2018 | 12/11/2018 | 1/3/2019 | | DONE |
Julie Romig
|
|
|
*12/24 - IBC Rev Comp 12/27 - Plan Modification Jefferson Flats
|
Routing Off Site - STRUCTURAL | 12/18/2018 | | 1/2/2019 | | PASS |
Julie Romig
|
|
|
KPFF
|
Routing - Design Review | 12/18/2018 | | 12/28/2018 | | PASS |
Josh Wilson
|
|
|
Ok per revised drawings uploaded to DRH16-00176
|
Routing - PLAN CHECK | 12/18/2018 | | 12/27/2018 | | PASS |
Julie Romig
|
|
|
|
Plan Modification Accepted | | | 12/11/2018 | | DONE |
|
|
|
Revise exterior 1 hr rated wall construction detail, eliminate east awning due to rated construction requirements, revise structral framing and detailing in a few locations
|
BLD-Wall cover | 11/26/2018 | 11/26/2018 | 11/26/2018 | P | PASS |
Tony Young
|
|
|
Partial framing for soffit cover. Wanting to cover all exterior soffits and overhangs before full framing. Plans and engineering under stairs. Call Andy with any questions Phone #: ###-#### Inspection requested via web by Andy Eells
|
BLD-Wall cover | 11/9/2018 | 11/13/2018 | 11/13/2018 | A | PASS |
Tony Young
|
|
|
Remainder of exterior sheetrock. Jim looked at first level and second story walkway. Approved plans under stairs in garage. Phone #: ###-#### Inspection requested via web by Andy Eells
|
BLD-Wall cover | 11/8/2018 | 11/8/2018 | 11/8/2018 | P | PART |
Tony Young
|
|
|
Need partial exterior drywall nailing inspection. Please call with questions ###-#### Phone #: ###-#### Inspection requested via web by Andy Eells,, lower sections on exterior ok
|
BLD-Wall Bracing | 11/2/2018 | 11/5/2018 | 11/5/2018 | P | CANC |
Dave Hannah
|
|
|
MTI special inspection on shear scheduled at 2pm. the 5th. Phone #: ###-#### Inspection requested via web by Andy Eells hold downs and stapes ok
|
BLD-Conference | 9/5/2018 | 9/6/2018 | 9/6/2018 | A | PEND |
Dave Hannah
|
|
|
Give me a call to meet onsite to go over questions on fire rated wall detail. Thank You Andy Eells ###-#### Phone #: ###-#### Inspection requested via web by Andy Eells
|
BLD-Foundation | 8/1/2018 | 8/2/2018 | 8/2/2018 | A | PASS |
Dave Hannah
|
|
|
James Phone #: ###-####
|
BLD-Foundation | 7/24/2018 | 7/25/2018 | 7/25/2018 | A | PEND |
Dave Hannah
|
|
|
Ty Phone #: ###-#### this is a footing also mti will check rebar and test concrete setbacks and rebar ok
|
BLD-Foundation | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | CANC |
Tony Young
|
|
|
Please call ahead // Ty Phone #: ###-#### Inspection cancelled from web by: Keeley Wilson
|
Issue PAID IN FULL permit | | | 7/16/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/16/2018 | | DONE |
|
|
|
|
Place hold on job | 3/22/2018 | | 7/16/2018 | | DONE |
Christina Prado
|
|
|
DO NOT ISSUE WITHOUT GRD17-00063
|
(F) Reprint permit | | | 7/10/2018 | | DONE |
|
|
|
|
Extend Review Timeline | | | 5/11/2018 | | |
|
|
|
Final 180 day extension per Adele. See documnets
|
Meeting | | | 5/4/2018 | | DONE |
|
|
|
request for an extension was sent in by email
|
Expiration Notice | 4/25/2018 | 5/16/2018 | 4/25/2018 | | DONE |
Brittany Hill
|
|
|
|
Extend Review Timeline | | | 11/17/2017 | | DONE |
|
|
|
1st Approved 180 day extension per Adele. See documents
|
Telephone call | | | 11/9/2017 | | DONE |
|
|
|
Left a messgae for Carherine informing her that this permit is going to expire in 10 days and if she would like she may send in a request for a 180 day extension. Left her the permit number and my phone number
|
Expiration Notice | 10/26/2017 | 11/17/2017 | 10/26/2017 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 10/17/2017 | | |
|
|
|
|
Plan assigned to (JAR) | 6/2/2017 | 6/2/2017 | 10/17/2017 | | DONE |
Julie Romig
|
|
|
**1st Rev Comp - 2nd Rev Comp - 3rd Rec'd 10/11 - 506 Jefferson Flats 6 units - emailed Catherine report
|
Routing - PLAN CHECK | 10/12/2017 | | 10/17/2017 | | PASS |
Julie Romig
|
|
|
Review #3
|
Routing Off Site - STRUCTURAL | 10/12/2017 | | 10/17/2017 | | PASS |
Julie Romig
|
|
|
Review #3
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/17/2017 | | DONE |
|
|
|
ALL MET
(please note-GRD, ESC & PWK have been issued)
Need:
GC Form-met
Revised Cert of Value-Met
ACHD
(NEED TO BREAK OUT VALUE BTWN BLD AND GRD AND PAY/ISSUE BOTH PERMITS) per TCH met
|
Routing - PLAN CHECK | 8/29/2017 | | 9/12/2017 | | FAIL |
Julie Romig
|
|
|
Review #2
|
Routing PW Drainage | 8/29/2017 | | 9/12/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing Off Site - STRUCTURAL | 8/29/2017 | | 9/7/2017 | | FAIL |
Julie Romig
|
|
|
Review #2 - corrections required per ePlanReview. Refer to report.
|
Routing - FIRE | 8/29/2017 | 8/29/2017 | 9/6/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing PW Sewer Design | 8/29/2017 | | 9/6/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Street Lights | 8/29/2017 | | 8/29/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing - PUBLIC WORKS | 8/29/2017 | | 8/29/2017 | | PASS |
Morgan Webb
|
|
|
Review #2
|
Route to Impact Fee Review | 8/8/2017 | 8/11/2017 | 8/9/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 6/2/2017 | | 8/9/2017 | | FAIL |
Julie Romig
|
|
|
See plan review attached. Emailed to architect.
|
1st review completed | | | 8/9/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing Off Site - STRUCTURAL | 6/2/2017 | | 6/16/2017 | | FAIL |
Julie Romig
|
|
|
Corrections required per ePlanReview
|
Routing PW Drainage | 6/2/2017 | | 6/9/2017 | | FAIL |
Brian Murphy
|
|
|
NEEDS DRAINAGE CORRECTIONS
|
Routing - PLANNING | 6/2/2017 | | 6/7/2017 | | PASS |
Susan Riggs
|
|
|
|
Routing PW Solid Waste | 6/2/2017 | | 6/7/2017 | | PASS |
Evan Carpenter
|
|
|
Solid waste is OK as planned.
|
Routing - FIRE | 6/2/2017 | 6/2/2017 | 6/6/2017 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing - Erosion and Sediment | 6/2/2017 | | 6/5/2017 | | PASS |
Melissa Jannusch
|
|
|
Plan approved.
|
Routing PW Sewer Design | 6/2/2017 | | 6/5/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
New sewer service required to be a type "D" connection per ISPWC SD-511A. Contractor shall contact Boise Public Works 48 hours prior to sewer connection to obtain tap permit and schedule inspection. Contractor shall sleeve sewer services through seepage beds such that no joints in the pipe sleeve occur within the seepage bed, and the sleeve extends a minimum of 5 feet outside of the seepage bed on either side. Sleeves shall be composed of SDR-35 PVC, equivalent or greater quality material. Spacers (or approved equivalent) and rubber end seals shall be required to support the service line and prevent leaking into the sleeve.
|
Routing - MECHANICAL | 6/2/2017 | | 6/5/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 6/2/2017 | | 6/5/2017 | | PASS |
Bill VanDegrift
|
|
|
1) use island sink venting where structural conditions prevent conventional venting.
|
Routing - Design Review | 6/2/2017 | | 6/2/2017 | | PASS |
Sarah Schafer
|
|
|
Approved per DRH16-0156
|
Routing - PLANNING Land Div | 6/2/2017 | | 6/2/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 6/2/2017 | | 6/2/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/2/2017 | | 6/2/2017 | | PASS |
Morgan Webb
|
|
|
|
Intake Approval | | | 6/1/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Javier completed pre screen
|
Intake Approval | | | 5/26/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following:
ā¢ Please provide stamped, signed and dated structural sheets (all the āSā sheets) by an Idaho licensed engineer.
|
Application received | | | 5/23/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 23 2017 9:09AM
|
First Notice | | 5/3/2019 | | | |
|
|
|
|