BLD-Final | 8/27/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
DOC - Permit Finaled | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50-3.05
|
PubWorks Subgrade Approval | 4/19/2018 | 4/19/2018 | 4/19/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
PubWorks Occupancy Approval | 4/19/2018 | 4/19/2018 | 4/19/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 3/13/2018 | 3/14/2018 | 3/14/2018 | P | CANC |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Other | 2/9/2018 | 2/12/2018 | 2/12/2018 | A | PART |
Dave Hannah
|
|
|
sofit // Rolo Phone #: ###-#### work in progress looks ok
|
BLD-Energy code compliance | 11/16/2017 | 11/17/2017 | 11/17/2017 | A | PASS |
Jim Storey
|
|
|
Rollo Phone #: ###-#### framing c/n made ok insulation ok to cover
|
BLD-Framing/Rough-in | 11/15/2017 | 11/15/2017 | 11/15/2017 | P | PASS |
Brandon Shaw
|
|
|
Pending Engineer approval for A-2 truss splinting and nailing
OK to insulate
|
BLD-Wall Bracing | 10/18/2017 | 10/18/2017 | 10/18/2017 | P | PASS |
Brandon Shaw
|
|
|
Shear // Rolo Phone #: ###-####
|
BLD-Foundation | 9/5/2017 | 9/5/2017 | 9/5/2017 | P | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
Place hold on job | 8/31/2017 | | 9/1/2017 | | DONE |
Tisha Gallop
|
|
|
need signed building permit before any more inspection
|
BLD-Footing | 8/31/2017 | 8/31/2017 | 8/31/2017 | P | PASS |
Brandon Shaw
|
|
|
Early PM, Please - Dion Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/31/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/31/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 7/12/2017 | | |
|
|
|
|
Plan assigned to (JG) | 5/25/2017 | 5/25/2017 | 7/12/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 6/06 L2 SFD ePlan pend hillside
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/12/2017 | | DONE |
Christina Prado
|
|
|
All requirements met for issuance
|
Routing - PUBLIC WORKS GRADING | 7/10/2017 | | 7/10/2017 | | PASS |
Jim Wyllie
|
|
|
Plans revised in accordance with J. Taylor requirements. Okay to issue building permit.
Jim Wyllie / ###-####.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 7/6/2017 | | 7/6/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Grading-Hillside | 7/5/2017 | | 7/5/2017 | | FAIL |
Jason C. Taylor
|
|
|
Need grading plans revised to show side yard swales cross sections. JCT
|
Routing - PLAN CHECK | 6/28/2017 | | 6/28/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Grading-Hillside | 6/15/2017 | | 6/26/2017 | | FAIL |
Jason C. Taylor
|
|
|
See changemarks in ePlan. JCT
|
Routing - PLAN CHECK | 6/15/2017 | | 6/17/2017 | | PASS |
Javier Guzman
|
|
|
|
1st review completed | | | 6/9/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 5/24/2017 | | 6/9/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 5/24/2017 | 5/24/2017 | 5/30/2017 | | PASS |
Scott Arellano
|
|
|
All portions of this structure shall comply with the provisions of BMC 7-01-69 section 4920 for defensible space and are subject to Fire Department inspection.
|
Routing PW Grading-Hillside | 5/24/2017 | | 5/30/2017 | | FAIL |
Jason C. Taylor
|
|
|
See changemarks in ePlan. JCT
|
Routing - Erosion and Sediment | 5/24/2017 | | 5/26/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Valid RP and PD. Site preparation inspection required.
|
Route to Impact Fee Review | 5/24/2017 | 5/27/2017 | 5/25/2017 | | PASS |
Marissa Taylor
|
|
|
Initial residential review of new SFD permits requested for now.
|
Plan assigned to (BJM) | 5/24/2017 | 5/24/2017 | 5/25/2017 | | DEFR |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 5/24/2017 | | 5/25/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/24/2017 | | 5/25/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 5/24/2017 | | 5/25/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 5/24/2017 | | 5/24/2017 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 5/24/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/24/2017 | | DONE |
|
|
|
|
Application received | | | 5/23/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 23 2017 12:25PM
|