Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD17-01607
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 5063 S TABOO PL
Project Name39-7 EV3 (Skyline 17B)
Customer Number 
ePlanReviewYes
Description
(Floodplain) WUI Zone B requirements. Permit for the construction of a new 2715 sq. ft., two story (first story 1259 sq. ft., second story 1456 sq. ft.) single family dwelling with 5 bedrooms, 3.5 bathrooms, approximately 236 sq. ft. of covered patio/porch and a 752 sq. ft. attached garage per the approved plans and any notations. R-1C/DA zoning and setbacks per planning. JG. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 608-7168.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/8/20188/10/20188/10/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled8/10/20188/10/20188/10/2018PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results8/8/20188/10/20188/10/2018ADONE
DetailsBrandon Shaw
ACH50- 4.6
PubWorks Occupancy Approval8/10/20188/10/20188/10/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
BLD-Energy code compliance5/29/20185/31/20185/31/2018APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in5/29/20185/29/20185/29/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in5/25/20185/29/20185/29/2018ACANC
DetailsBrandon Shaw
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
BLD-Wall Bracing5/8/20185/8/20185/8/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Aging Inspection12/26/201712/26/201712/26/2017 DONE
DetailsBrandon Shaw
Work in progress
BLD-Footing8/11/20178/11/20178/14/2017PPASS
DetailsBrandon Shaw
Pat Phone #: ###-####
PubWorks Subgrade Approval8/10/20178/10/20178/10/2017 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
OVERRIDE  6/20/2017  
Plan assigned to (JG)6/1/20176/1/20176/20/2017 PASS
DetailsJavier Guzman
1st rev comp, 6/16 L2 SFD ePlan pend flood
PLANS/APPL TAKEN TO FRONT DESK  6/20/2017 DONE
Permit Ready to Issue  6/20/2017 DONE
all met
Issue PAID IN FULL permit  6/20/2017 DONE
Inspection Record Card- Bld  6/20/2017 DONE
Routing PW Flood Plain6/15/2017 6/19/2017 PASS
DetailsJason C. Taylor
Approved LOMR on File. No floodplain review required. JCT
Routing - PLAN CHECK6/15/2017 6/17/2017 PASS
DetailsJavier Guzman
1st review completed  6/14/2017 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK6/1/2017 6/14/2017 PASS
DetailsJavier Guzman
Routing PW Grading-Hillside6/1/2017 6/9/2017 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing PW Flood Plain6/1/2017 6/7/2017 FAIL
DetailsJason C. Taylor
See Changemarks in ePlan. JCT
Route to Impact Fee Review6/1/20176/4/20176/5/2017 PASS
DetailsMarissa Taylor
Initial residential review of new SFD permits requested for now.
Routing - FIRE6/1/20176/1/20176/5/2017 PASS
DetailsKatie Marron
Plans were reviewed for FD Access, hydrant availability and defensible space.
Plan assigned to (BJM)6/1/20176/1/20176/1/2017 DEFR
DetailsBrian McGowan
Plans ACCEPTED BY PLAN TECH  6/1/2017 DONE
DetailsChristina Prado
Intake Approval  6/1/2017 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  6/1/2017 DONE
DetailsChristina Prado
Routing - MECHANICAL6/1/2017 6/1/2017 PASS
DetailsChad Schwendiman
Routing - PLANNING6/1/2017 6/1/2017 PASS
DetailsSue Cummings
Routing - Addressing6/1/2017 6/1/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS6/1/2017 6/1/2017 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment6/1/2017 6/1/2017 PASS
DetailsMelissa Jannusch
Special waiver approved.
Application received  5/24/2017 DONE
Application submitted via PDS Online on May 24 2017 9:46AM