Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD17-01609
StatusFinaled
Name SYRINGA CONSTRUCTION OF IDAHO LLC
Site Address 864 E NATURE VIEW CT
Project Name 
Customer Number 
ePlanReviewNo
Description
*** (8-14-18 - PLAN MODIFICATION FOR AN AS BUILT RETAINING WALL)*** HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 4668 sq. ft., two story (first story 1202 sq. ft., second story 3466 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 1573 sq. ft. of covered patio/porch and a 3295 sq. ft. attached garage per the approved plans and any notations. Prescriptive energy code is proposed. A-1 zoning and setbacks per planning. ***BJM*** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 608-7168.

Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/28/20188/28/20188/28/2018PPASS
DetailsTony Young
Tony, Grading has been signed off. Please issue the building C of O. Let me know if you need anything further. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
DOC - Permit Finaled8/28/20188/28/20188/28/2018PPASS
DetailsTony Young
c of o issued
PubWorks Occupancy Approval8/21/20188/21/20188/21/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.

A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
A revised plan has been reviewed and approved by Public Works. Public Works Occupancy can now be granted.
CHANGE STATUS TO (ISS)  8/16/2018 DONE
OVERRIDE  8/15/2018  
Plan assigned to (BJM)8/10/20188/10/20188/15/2018 DONE
DetailsBrian McGowan
08/25? Retaining Wall - Hillside L2 Paper
Telephone call  8/15/2018 DONE
left a message for steve hanson that the plan mod is ready to be picked up and the fee amount due
Routing - PLANNING  8/15/2018 PASS
DetailsBrian McGowan
Driveway width shall not exceed 33' in the front yard setback. Retaining Walls within the front yard setback shall not exceed 3'.
Routing - PLAN CHECK8/10/2018 8/15/2018 PASS
DetailsBrian McGowan
Permit Ready to Issue  8/15/2018 DONE
PLAN MOD
Plan Reviewer's activity  8/14/2018  
DetailsBrian McGowan
Took prints to Planning for Approval.
Routing PW Grading-Hillside8/10/2018 8/10/2018 PASS
DetailsMelissa Jannusch
Plan mod for retaining walls. As-builts approved.
Routing - PUBLIC WORKS8/10/2018 8/10/2018 PASS
DetailsRachael Beierle
Plan Modification Accepted  8/10/2018 DONE
Plan Mod accepted by Melissa J-received 3 sets of calcs, 2 sets of each sheet L1.0, S0.01, S5.11 & S6.01 and took to Brian McGowan
Plan Reviewer's activity  8/10/2018  
Took Plans to Morgan (PW)
BLD-Grading Inspection7/17/20187/18/20187/18/2018APEND
DetailsTony Young
Final Grading and Erosion control inspection. Please contact Steve to arrange meeting time. thanks, ###-####. steve Phone #: ###-#### Inspection requested via web by steve hanson
BLD-Final7/2/20187/3/20187/3/2018APEND
DetailsTony Young
Hi! Looking to see if we can do a Temp-Certificate of Occupancy. Trying to finish up landscape this week to get ‘Final’ next week.
Please call with any issues.
Thx Kim Phone #: ###-#### Inspection requested via web by Steve Hanson,, all looks ok,, needs firecaulking,, handrail extensions to be flush,, hillside signoff from PW,,
BLD-Other5/23/20185/25/20185/25/2018APASS
DetailsTony Young
block walls are built and we are ready to fill with concrete. Please inspect for approval to pour. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
BLD-Foundation5/22/20185/22/20185/22/2018PPART
DetailsTony Young
Inspection for block walls for grading. Inspection prior to pour of concrete in blocks. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson,, work ion progress,, talked w/ masons helper
BLD-Other5/22/20185/22/20185/22/2018APART
DetailsTony Young
Inspection for block walls for grading. Inspection prior to pour of concrete in blocks. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson/// needs to finish rebar verticals and tie in to existing wall
BLD-Other5/2/20185/3/20185/3/2018APART
DetailsTony Young
Inspection for re bar and block placement for retaining walls near lower level garage. Wanted you to see the re bar prior to concrete pour. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson,, rebar ok,, need to clean excess mortar out of the cells prior to grouting,, work in progress,, ok
BLD-Other4/17/20184/18/20184/18/2018APART
DetailsDave Hannah
Inpection for rebar in wall block prior to pouring concrete. Also, inspection of sheetrock layer behind T;G in soffits. Please coordinate for inspection around 11am to noon if possible. siders will be starting tomorrow and will hang T;G right after the inspection. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson soffits ok cmu retanning wall first two courses ok
BLD-Other3/30/20184/3/20184/3/2018APART
DetailsTony Young
Inspection of T;G material to be installed on soffits to verify the ''HT'' Heat treated stamp on the product.

2 piles of material. The untreated is for interior of the home.

Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson,, work in progress on drywall soffit,, ok so far
BLD-Footing3/29/20183/30/20183/30/2018PPEND
DetailsTony Young
Annie-prefers before 2pm Phone #: ###-####,, needs soils report for retaining wall
BLD-Footing3/28/20183/29/20183/30/2018PPEND
DetailsTony Young
Annie-prefers before 2pm Phone #: ###-####,, need soils report
BLD-Foundation3/9/20183/14/20183/14/2018APART
DetailsTony Young
Annie Phone #: ###-####,, driveway retaining walls,, will need to have civil engineer resubmit to hillside dept. for approval prior to final if different from original approval
BLD-Foundation3/7/20183/9/20183/9/2018ANR
DetailsTony Young
Annie Phone #: ###-####
BLD-Foundation3/7/20183/7/20183/7/2018PPART
DetailsTony Young
Annie Phone #: ###-####,, work in progress on the retaining walls,, paper plans not on site
BLD-Footing2/23/20182/23/20182/23/2018PPASS
DetailsBrandon Shaw
Work in progress

Frost protection required
BLD-Footing2/20/20182/22/20182/22/2018ANR
DetailsTony Young
late AM/Early pm? // pouring at 1 // Annie Phone #: ###-####
BLD-Energy code compliance1/30/20182/1/20182/1/2018PPASS
DetailsBrandon Shaw
OK to cover
BLD-Framing/Rough-in1/25/20181/26/20181/26/2018PPART
DetailsTony Young
Preliminary foam install of draft stop on lower garage area, requested by Dave Hannah during framing inspection. Thank you, steve 208.850.8424 Phone #: ###-#### Inspection requested via web by steve hanson,, The draft stop in garage area is OK.
BLD-Framing/Rough-in1/23/20181/25/20181/25/2018PPASS
DetailsDave Hannah
Approved plan near fireplace. If you can, please call ###-#### with approximate inspection time and i will try to meet you there with the framer. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
BLD-Wall Bracing1/23/20181/25/20181/25/2018PPASS
DetailsDave Hannah
Approved plan near fireplace. If you can, please call ###-#### with approximate inspection time and i will try to meet you there with the framer. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
BLD-Framing/Rough-in1/20/20181/24/20181/23/2018PCANC
DetailsTony Young
Wall Bracing and Shear inspections both at the same time please. Plans near fireplace. steve Phone #: ###-#### >> Inspection requested via web by steve hanson Inspection cancelled from web by: steve hanson
BLD-Wall Bracing1/20/20181/24/20181/23/2018PCANC
DetailsTony Young
Wall Bracing and Shear inspections both at the same time please. Plans near fireplace. steve Phone #: ###-#### >> Inspection requested via web by steve hanson Inspection cancelled from web by: steve hanson
BLD-Wall Bracing1/18/20181/22/20181/20/2018PCANC
DetailsTony Young
Wall bracing and framing inspection both done today. Plans near fireplace. thank you, steve Phone #: ###-#### >> Inspection requested via web by steve hanson Inspection cancelled from web by: steve hanson
BLD-Framing/Rough-in1/18/20181/19/20181/19/2018PFAIL
DetailsTony Young
Shear and framing inspection both requested for today. Plans on site near fireplace. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson// c/n posted
BLD-Wall Bracing1/17/20181/18/20181/19/2018PPEND
DetailsDave Hannah
Shear inspection. will place another copy of Performance Engineering letter in with the approved plan for you. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
BLD-Wall Bracing1/16/20181/17/20181/17/2018AFAIL
DetailsJim Storey
Shear inspection please. Plan on site near fireplace. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
BLD-Wall Bracing1/13/20181/16/20181/16/2018ANR
DetailsJim Storey
Shear inspection please. contact steve hanson with any questions or comments at 208.850.8424. thank you. Phone #: ###-#### Inspection requested via web by steve hanson
Plan Modification Accepted  1/16/2018 DONE
new manual j report
Routing - MECHANICAL1/16/2018 1/16/2018 PASS
DetailsTroy James
resubmitted manual j report
BLD-Footing12/1/201712/4/201712/4/2017ADONE
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing11/20/201711/21/201711/21/2017PPART
DetailsTony Young
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo ,, garage area ok
BLD-Foundation10/10/201710/11/201710/11/2017APASS
DetailsBrandon Shaw
Work in progress
BLD-Footing9/19/20179/20/20179/20/2017APASS
DetailsTony Young
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
BLD-Footing9/18/20179/19/20179/19/2017PFAIL
DetailsMike Jordan
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo . No city approved plans or engineering on site. No inspection was conducted.
PubWorks Subgrade Approval9/15/20179/15/20179/15/2017 DONE
DetailsMelissa Jannusch

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Other8/31/20178/31/20179/1/2017PPASS
DetailsDave Hannah
Erosion Control Inspection. Contact Mike Winkle with questions 208.573.9143. Phone #: ###-#### Inspection requested via web by steve hanson
OVERRIDE  8/29/2017  
Inspection Record Card- Bld  8/29/2017 DONE
DetailsChristina Prado
Telephone call  8/29/2017  
DetailsChristina Prado
Called Steve to advise permit is ready pending RP and gave fees due
Issue PAID IN FULL permit  8/29/2017 DONE
Print Occupancy Form  8/29/2017 DONE
Permit Ready to Issue  8/29/2017 DONE
need RP
Plan assigned to (BJM) 5/24/20178/28/2017 DONE
DetailsBrian McGowan
1st review complete - FAIL - 6/12 sfd level 2 paper
Case Summary (BLD)  8/28/2017 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  8/28/2017 DONE
DetailsBrian McGowan
Routing - PLAN CHECK7/27/2017 8/28/2017 PASS
DetailsBrian McGowan
Routing PW Grading-Hillside7/27/2017 7/27/2017 PASS
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.

Routing - PUBLIC WORKS7/27/2017 7/27/2017 PASS
DetailsRachael Beierle
Routing PW Grading-Hillside7/20/2017 7/25/2017  
DetailsJason C. Taylor
Plan resubmittals received  7/17/2017 DONE
Two copies of page Apoc (ap300 non fibered asphalt emulsion), two copies of page Products Specification, two copies of sheets L1.0, S0.01,S5.11 and S6.01. Taken to Brian Mc- Took to Racheal for routing (BJM)
Routing PW Grading-Hillside7/7/2017 7/7/2017 FAIL
DetailsJason C. Taylor
See email dated 7/7/2017. JCT
Plan resubmittals received  7/3/2017 DONE
Three copies of sheets S0.01, S5.11 and S6.01. Taken to Brian Mc
Routing PW Grading-Hillside6/28/2017 6/28/2017 FAIL
DetailsJason C. Taylor
See email dateed June 28th. Revision needed. JCT
Plan resubmittals received  6/27/2017 DONE
Two copies of revision #1: structural calculations, three copies of structural calculations, one copie of statement of special inspections, three copies of sheets L1.0, S0.01, S5.11,S6.01 and three copies of full set of plans with all review notes. Taken to Brian Mc
Plan resubmittals received  6/22/2017 DONE
received two copies of structural calculations and plan sheets S0.01, S5.11, S6.01
1st review completed  6/21/2017 FAIL
DetailsBrian McGowan
Several issues, 12' basement wall calcs needed. Retaining wall calcs needed.
Routing - PLAN CHECK  6/21/2017 FAIL
DetailsBrian McGowan
Several issues, 12' basement wall calcs needed. Retaining wall calcs needed.
Plan resubmittals received  6/8/2017 DONE
resubmittal received 3 sheets of L1.0-took to Brian McGowan
Routing - FIRE6/5/2017 6/6/2017 PASS
DetailsScott Arellano
Approved for FD vehicle access and water supply proximity. THis home is subject to FD inspection in regards to WUI defensible space.
Routing - Erosion and Sediment6/5/2017 6/5/2017 PASS
DetailsAndy J. Long
ESC site map with narrative and construction details provided. Site preparation inspection is required prior to consturction. Valid RP and PD designated.
Routing - MECHANICAL  6/5/2017 PASS
DetailsTroy James
Routing - PLANNING5/30/2017 6/1/2017 PASS
DetailsNicolette Womack
CFH17-00017; Comply with Conditions of Approval, Driveway width shall not exceed 33' in the front yard setback.
Routing PW Grading-Hillside5/25/2017 5/30/2017 FAIL
DetailsJason C. Taylor
Grading plans need revised as per CFH Approval. Jason Taylor ###-####.
Routing - PUBLIC WORKS5/30/2017 5/30/2017 FAIL
DetailsMorgan Webb
SEE JASON TAYLOR FOR FAIL
Route to Impact Fee Review5/24/20175/27/20175/25/2017 PASS
DetailsMarissa Taylor
Initial residential review of new SFD permits requested for now.
Routing PW Sewer Rating5/25/2017 5/25/2017 PASS
DetailsRachael Beierle
Routing - Addressing5/24/2017 5/25/2017 PASS
DetailsLaura Hunter
Intake Approval  5/24/2017 FAIL
DetailsChristina Prado
Need ESC narrative & Structural Calcs
Plans ACCEPTED BY PLAN TECH  5/24/2017 DONE
DetailsChristina Prado
Intake Approval  5/24/2017 PASS
DetailsChristina Prado
Recd Pcfee & Taken To Pln CK  5/24/2017 DONE
DetailsChristina Prado
Application received 5/24/2017   
Routing - PUBLIC WORKS7/7/2017   FAIL
DetailsBeverly Mountain