BLD-Final | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Tony Young
|
|
|
Tony, Grading has been signed off. Please issue the building C of O. Let me know if you need anything further. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
DOC - Permit Finaled | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Tony Young
|
|
|
c of o issued
|
PubWorks Occupancy Approval | 8/21/2018 | 8/21/2018 | 8/21/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
A revised plan has been reviewed and approved by Public Works. Public Works Occupancy can now be granted.
|
CHANGE STATUS TO (ISS) | | | 8/16/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/15/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 8/10/2018 | 8/10/2018 | 8/15/2018 | | DONE |
Brian McGowan
|
|
|
08/25? Retaining Wall - Hillside L2 Paper
|
Telephone call | | | 8/15/2018 | | DONE |
|
|
|
left a message for steve hanson that the plan mod is ready to be picked up and the fee amount due
|
Routing - PLANNING | | | 8/15/2018 | | PASS |
Brian McGowan
|
|
|
Driveway width shall not exceed 33' in the front yard setback. Retaining Walls within the front yard setback shall not exceed 3'.
|
Routing - PLAN CHECK | 8/10/2018 | | 8/15/2018 | | PASS |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/15/2018 | | DONE |
|
|
|
PLAN MOD
|
Plan Reviewer's activity | | | 8/14/2018 | | |
Brian McGowan
|
|
|
Took prints to Planning for Approval.
|
Routing PW Grading-Hillside | 8/10/2018 | | 8/10/2018 | | PASS |
Melissa Jannusch
|
|
|
Plan mod for retaining walls. As-builts approved.
|
Routing - PUBLIC WORKS | 8/10/2018 | | 8/10/2018 | | PASS |
Rachael Beierle
|
|
|
|
Plan Modification Accepted | | | 8/10/2018 | | DONE |
|
|
|
Plan Mod accepted by Melissa J-received 3 sets of calcs, 2 sets of each sheet L1.0, S0.01, S5.11 & S6.01 and took to Brian McGowan
|
Plan Reviewer's activity | | | 8/10/2018 | | |
|
|
|
Took Plans to Morgan (PW)
|
BLD-Grading Inspection | 7/17/2018 | 7/18/2018 | 7/18/2018 | A | PEND |
Tony Young
|
|
|
Final Grading and Erosion control inspection. Please contact Steve to arrange meeting time. thanks, ###-####. steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Final | 7/2/2018 | 7/3/2018 | 7/3/2018 | A | PEND |
Tony Young
|
|
|
Hi! Looking to see if we can do a Temp-Certificate of Occupancy. Trying to finish up landscape this week to get ‘Final’ next week. Please call with any issues. Thx Kim Phone #: ###-#### Inspection requested via web by Steve Hanson,, all looks ok,, needs firecaulking,, handrail extensions to be flush,, hillside signoff from PW,,
|
BLD-Other | 5/23/2018 | 5/25/2018 | 5/25/2018 | A | PASS |
Tony Young
|
|
|
block walls are built and we are ready to fill with concrete. Please inspect for approval to pour. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Foundation | 5/22/2018 | 5/22/2018 | 5/22/2018 | P | PART |
Tony Young
|
|
|
Inspection for block walls for grading. Inspection prior to pour of concrete in blocks. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson,, work ion progress,, talked w/ masons helper
|
BLD-Other | 5/22/2018 | 5/22/2018 | 5/22/2018 | A | PART |
Tony Young
|
|
|
Inspection for block walls for grading. Inspection prior to pour of concrete in blocks. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson/// needs to finish rebar verticals and tie in to existing wall
|
BLD-Other | 5/2/2018 | 5/3/2018 | 5/3/2018 | A | PART |
Tony Young
|
|
|
Inspection for re bar and block placement for retaining walls near lower level garage. Wanted you to see the re bar prior to concrete pour. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson,, rebar ok,, need to clean excess mortar out of the cells prior to grouting,, work in progress,, ok
|
BLD-Other | 4/17/2018 | 4/18/2018 | 4/18/2018 | A | PART |
Dave Hannah
|
|
|
Inpection for rebar in wall block prior to pouring concrete. Also, inspection of sheetrock layer behind T;G in soffits. Please coordinate for inspection around 11am to noon if possible. siders will be starting tomorrow and will hang T;G right after the inspection. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson soffits ok cmu retanning wall first two courses ok
|
BLD-Other | 3/30/2018 | 4/3/2018 | 4/3/2018 | A | PART |
Tony Young
|
|
|
Inspection of T;G material to be installed on soffits to verify the ''HT'' Heat treated stamp on the product.
2 piles of material. The untreated is for interior of the home.
Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson,, work in progress on drywall soffit,, ok so far
|
BLD-Footing | 3/29/2018 | 3/30/2018 | 3/30/2018 | P | PEND |
Tony Young
|
|
|
Annie-prefers before 2pm Phone #: ###-####,, needs soils report for retaining wall
|
BLD-Footing | 3/28/2018 | 3/29/2018 | 3/30/2018 | P | PEND |
Tony Young
|
|
|
Annie-prefers before 2pm Phone #: ###-####,, need soils report
|
BLD-Foundation | 3/9/2018 | 3/14/2018 | 3/14/2018 | A | PART |
Tony Young
|
|
|
Annie Phone #: ###-####,, driveway retaining walls,, will need to have civil engineer resubmit to hillside dept. for approval prior to final if different from original approval
|
BLD-Foundation | 3/7/2018 | 3/9/2018 | 3/9/2018 | A | NR |
Tony Young
|
|
|
Annie Phone #: ###-####
|
BLD-Foundation | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | PART |
Tony Young
|
|
|
Annie Phone #: ###-####,, work in progress on the retaining walls,, paper plans not on site
|
BLD-Footing | 2/23/2018 | 2/23/2018 | 2/23/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
BLD-Footing | 2/20/2018 | 2/22/2018 | 2/22/2018 | A | NR |
Tony Young
|
|
|
late AM/Early pm? // pouring at 1 // Annie Phone #: ###-####
|
BLD-Energy code compliance | 1/30/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
Brandon Shaw
|
|
|
OK to cover
|
BLD-Framing/Rough-in | 1/25/2018 | 1/26/2018 | 1/26/2018 | P | PART |
Tony Young
|
|
|
Preliminary foam install of draft stop on lower garage area, requested by Dave Hannah during framing inspection. Thank you, steve 208.850.8424 Phone #: ###-#### Inspection requested via web by steve hanson,, The draft stop in garage area is OK.
|
BLD-Framing/Rough-in | 1/23/2018 | 1/25/2018 | 1/25/2018 | P | PASS |
Dave Hannah
|
|
|
Approved plan near fireplace. If you can, please call ###-#### with approximate inspection time and i will try to meet you there with the framer. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Wall Bracing | 1/23/2018 | 1/25/2018 | 1/25/2018 | P | PASS |
Dave Hannah
|
|
|
Approved plan near fireplace. If you can, please call ###-#### with approximate inspection time and i will try to meet you there with the framer. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Framing/Rough-in | 1/20/2018 | 1/24/2018 | 1/23/2018 | P | CANC |
Tony Young
|
|
|
Wall Bracing and Shear inspections both at the same time please. Plans near fireplace. steve Phone #: ###-#### >> Inspection requested via web by steve hanson Inspection cancelled from web by: steve hanson
|
BLD-Wall Bracing | 1/20/2018 | 1/24/2018 | 1/23/2018 | P | CANC |
Tony Young
|
|
|
Wall Bracing and Shear inspections both at the same time please. Plans near fireplace. steve Phone #: ###-#### >> Inspection requested via web by steve hanson Inspection cancelled from web by: steve hanson
|
BLD-Wall Bracing | 1/18/2018 | 1/22/2018 | 1/20/2018 | P | CANC |
Tony Young
|
|
|
Wall bracing and framing inspection both done today. Plans near fireplace. thank you, steve Phone #: ###-#### >> Inspection requested via web by steve hanson Inspection cancelled from web by: steve hanson
|
BLD-Framing/Rough-in | 1/18/2018 | 1/19/2018 | 1/19/2018 | P | FAIL |
Tony Young
|
|
|
Shear and framing inspection both requested for today. Plans on site near fireplace. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson// c/n posted
|
BLD-Wall Bracing | 1/17/2018 | 1/18/2018 | 1/19/2018 | P | PEND |
Dave Hannah
|
|
|
Shear inspection. will place another copy of Performance Engineering letter in with the approved plan for you. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Wall Bracing | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | FAIL |
Jim Storey
|
|
|
Shear inspection please. Plan on site near fireplace. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Wall Bracing | 1/13/2018 | 1/16/2018 | 1/16/2018 | A | NR |
Jim Storey
|
|
|
Shear inspection please. contact steve hanson with any questions or comments at 208.850.8424. thank you. Phone #: ###-#### Inspection requested via web by steve hanson
|
Plan Modification Accepted | | | 1/16/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 1/16/2018 | | 1/16/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Footing | 12/1/2017 | 12/4/2017 | 12/4/2017 | A | DONE |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 11/20/2017 | 11/21/2017 | 11/21/2017 | P | PART |
Tony Young
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo ,, garage area ok
|
BLD-Foundation | 10/10/2017 | 10/11/2017 | 10/11/2017 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 9/19/2017 | 9/20/2017 | 9/20/2017 | A | PASS |
Tony Young
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 9/18/2017 | 9/19/2017 | 9/19/2017 | P | FAIL |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo . No city approved plans or engineering on site. No inspection was conducted.
|
PubWorks Subgrade Approval | 9/15/2017 | 9/15/2017 | 9/15/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Other | 8/31/2017 | 8/31/2017 | 9/1/2017 | P | PASS |
Dave Hannah
|
|
|
Erosion Control Inspection. Contact Mike Winkle with questions 208.573.9143. Phone #: ###-#### Inspection requested via web by steve hanson
|
OVERRIDE | | | 8/29/2017 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/29/2017 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 8/29/2017 | | |
Christina Prado
|
|
|
Called Steve to advise permit is ready pending RP and gave fees due
|
Issue PAID IN FULL permit | | | 8/29/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/29/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/29/2017 | | DONE |
|
|
|
need RP
|
Plan assigned to (BJM) | | 5/24/2017 | 8/28/2017 | | DONE |
Brian McGowan
|
|
|
1st review complete - FAIL - 6/12 sfd level 2 paper
|
Case Summary (BLD) | | | 8/28/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/28/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 7/27/2017 | | 8/28/2017 | | PASS |
Brian McGowan
|
|
|
|
Routing PW Grading-Hillside | 7/27/2017 | | 7/27/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 7/27/2017 | | 7/27/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Grading-Hillside | 7/20/2017 | | 7/25/2017 | | |
Jason C. Taylor
|
|
|
|
Plan resubmittals received | | | 7/17/2017 | | DONE |
|
|
|
Two copies of page Apoc (ap300 non fibered asphalt emulsion), two copies of page Products Specification, two copies of sheets L1.0, S0.01,S5.11 and S6.01. Taken to Brian Mc- Took to Racheal for routing (BJM)
|
Routing PW Grading-Hillside | 7/7/2017 | | 7/7/2017 | | FAIL |
Jason C. Taylor
|
|
|
See email dated 7/7/2017. JCT
|
Plan resubmittals received | | | 7/3/2017 | | DONE |
|
|
|
Three copies of sheets S0.01, S5.11 and S6.01. Taken to Brian Mc
|
Routing PW Grading-Hillside | 6/28/2017 | | 6/28/2017 | | FAIL |
Jason C. Taylor
|
|
|
See email dateed June 28th. Revision needed. JCT
|
Plan resubmittals received | | | 6/27/2017 | | DONE |
|
|
|
Two copies of revision #1: structural calculations, three copies of structural calculations, one copie of statement of special inspections, three copies of sheets L1.0, S0.01, S5.11,S6.01 and three copies of full set of plans with all review notes. Taken to Brian Mc
|
Plan resubmittals received | | | 6/22/2017 | | DONE |
|
|
|
received two copies of structural calculations and plan sheets S0.01, S5.11, S6.01
|
1st review completed | | | 6/21/2017 | | FAIL |
Brian McGowan
|
|
|
Several issues, 12' basement wall calcs needed. Retaining wall calcs needed.
|
Routing - PLAN CHECK | | | 6/21/2017 | | FAIL |
Brian McGowan
|
|
|
Several issues, 12' basement wall calcs needed. Retaining wall calcs needed.
|
Plan resubmittals received | | | 6/8/2017 | | DONE |
|
|
|
resubmittal received 3 sheets of L1.0-took to Brian McGowan
|
Routing - FIRE | 6/5/2017 | | 6/6/2017 | | PASS |
Scott Arellano
|
|
|
Approved for FD vehicle access and water supply proximity. THis home is subject to FD inspection in regards to WUI defensible space.
|
Routing - Erosion and Sediment | 6/5/2017 | | 6/5/2017 | | PASS |
Andy J. Long
|
|
|
ESC site map with narrative and construction details provided. Site preparation inspection is required prior to consturction. Valid RP and PD designated.
|
Routing - MECHANICAL | | | 6/5/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 5/30/2017 | | 6/1/2017 | | PASS |
Nicolette Womack
|
|
|
CFH17-00017; Comply with Conditions of Approval, Driveway width shall not exceed 33' in the front yard setback.
|
Routing PW Grading-Hillside | 5/25/2017 | | 5/30/2017 | | FAIL |
Jason C. Taylor
|
|
|
Grading plans need revised as per CFH Approval. Jason Taylor ###-####.
|
Routing - PUBLIC WORKS | 5/30/2017 | | 5/30/2017 | | FAIL |
Morgan Webb
|
|
|
SEE JASON TAYLOR FOR FAIL
|
Route to Impact Fee Review | 5/24/2017 | 5/27/2017 | 5/25/2017 | | PASS |
Marissa Taylor
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Sewer Rating | 5/25/2017 | | 5/25/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 5/24/2017 | | 5/25/2017 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 5/24/2017 | | FAIL |
Christina Prado
|
|
|
Need ESC narrative & Structural Calcs
|
Plans ACCEPTED BY PLAN TECH | | | 5/24/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 5/24/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/24/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | 5/24/2017 | | | |
|
|
|
|
Routing - PUBLIC WORKS | 7/7/2017 | | | | FAIL |
Beverly Mountain
|
|
|
|