BLD-Aging Inspection | 4/20/2018 | 4/20/2018 | 4/23/2018 | | DONE |
Jim Sly
|
|
|
EXP.
|
DOC - Permit Expired | 4/23/2018 | 4/23/2018 | 4/23/2018 | P | PASS |
Jim Sly
|
|
|
|
Plan assigned to (JAB) Josh | 6/1/2017 | 6/1/2017 | 6/5/2017 | | DONE |
Josh Bogle
|
|
|
|
1st review completed | | | 6/5/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/5/2017 | | 6/5/2017 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/5/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/5/2017 | | DONE |
Christina Prado
|
|
|
All requirements met for issuance
|
Issue PAID IN FULL permit | | | 6/5/2017 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 5/26/2017 | 5/26/2017 | 6/1/2017 | | DEFR |
Brian McGowan
|
|
|
solar panels ePlan
|
Application received | | | 5/26/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 26 2017 10:32AM
|
Plans ACCEPTED BY PLAN TECH | | | 5/26/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 5/26/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/26/2017 | | DONE |
Christina Prado
|
|
|
|
Routing - PLANNING | 5/26/2017 | | 5/26/2017 | | PASS |
Colleen T Carroll
|
|
|
|