BLD-Final | 6/18/2017 | 6/19/2017 | 6/19/2017 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by David Dexter
|
DOC - Permit Finaled | 6/19/2017 | 6/19/2017 | 6/19/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 6/15/2017 | 6/16/2017 | 6/16/2017 | A | PASS |
Jim Sly
|
|
|
As early as possible please - Jenna Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/14/2017 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 6/5/2017 | 6/5/2017 | 6/9/2017 | | PASS |
Josh Bogle
|
|
|
patio cover
|
1st review completed | | | 6/9/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/9/2017 | | 6/9/2017 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/9/2017 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Plan assigned to (BJM) | 5/30/2017 | 5/30/2017 | 6/5/2017 | | DEFR |
Brian McGowan
|
|
|
patio cover
|
Routing - PLANNING | 5/30/2017 | | 5/30/2017 | | PASS |
Colleen T Carroll
|
|
|
|
Intake Approval | | | 5/30/2017 | | PASS |
|
|
|
|
Application received | | | 5/26/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 26 2017 11:32AM
|
Intake Approval | | | 5/26/2017 | | FAIL |
|
|
|
need drawings uploaded individually and they must be turned the correct way, also leave the bottom right corner blank for our stamp-called customer and emailed Pamela
|