First Notice | | 12/21/2017 | 12/11/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 12/11/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 12/11/2017 | | DONE |
|
|
|
|
Print Statement | | | 12/8/2017 | | DONE |
|
|
|
|
BLD-Final | 11/30/2017 | 12/1/2017 | 12/1/2017 | A | PASS |
Mike Jordan
|
|
|
Tim Phone #: ###-####. Ok for perm occ. Landing has been installed. No card to sign.
|
Zoning Approval | 11/30/2017 | 11/30/2017 | 11/30/2017 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Final | 11/15/2017 | 11/16/2017 | 11/16/2017 | A | FAIL |
Mike Jordan
|
|
|
tim Phone #: ###-####. Needs landing at bottom of stairs and zonin final.
|
FIRE-Final Inspection | 11/15/2017 | 11/15/2017 | 11/15/2017 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Jim Phone #: ###-####
|
BLD-Final | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | NR |
Mike Jordan
|
|
|
please call 20 mins ahead- Tim Phone #: ###-####. Needs fire/life/safety first.
|
BLD-Foundation | 10/12/2017 | 10/13/2017 | 10/13/2017 | A | PASS |
Mike Jordan
|
|
|
Inside building // Tim Phone #: ###-####
|
Place hold on job | 9/26/2017 | | 9/29/2017 | | DONE |
Tisha Gallop
|
|
|
need signed permit, see Tisha
|
Issue PAID IN FULL permit | | | 9/25/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/25/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 9/19/2017 | | |
|
|
|
|
Plan assigned to (JG) | 9/1/2017 | 9/1/2017 | 9/19/2017 | | PASS |
Javier Guzman
|
|
|
9/28 Idaho Power Modular ePlan
|
Routing - PLAN CHECK | 9/1/2017 | | 9/19/2017 | | PASS |
Javier Guzman
|
|
|
|
Print Occupancy Form | | | 9/19/2017 | | DONE |
|
|
|
|
1st review completed | | | 9/19/2017 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/19/2017 | | DONE |
|
|
|
MET
need
GC
Rev cert of val
*met 9-20-17* RP (one on file is expired)
|
Routing - FIRE | 9/1/2017 | 9/1/2017 | 9/15/2017 | | PASS |
Scott Arellano
|
|
|
Attached plan review to case
|
Routing - PLUMBING | 9/12/2017 | | 9/12/2017 | | PASS |
Bill VanDegrift
|
|
|
Suez water will not require individual service for this building.
|
Routing - Erosion and Sediment | 9/1/2017 | | 9/8/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Valid RP. Notify ESC division for start and completion.
|
Routing PW Drainage | 9/1/2017 | | 9/6/2017 | | PASS |
Melissa Jannusch
|
|
|
Engr letter recieved. No inspection required.
|
Routing - MECHANICAL | 9/1/2017 | | 9/5/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 9/1/2017 | | 9/5/2017 | | FAIL |
Bill VanDegrift
|
|
|
suez water will require a new meter and service
|
Routing - PLANNING Land Div | 9/1/2017 | | 9/5/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 9/1/2017 | | 9/1/2017 | | PASS |
Doug Chausow
|
|
|
New address: 11910 W Franklin Rd
|
Routing - PUBLIC WORKS | 9/1/2017 | | 9/1/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 9/1/2017 | | 9/1/2017 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 9/1/2017 | | PASS |
|
|
|
|
Intake Approval | | | 8/31/2017 | | FAIL |
Julie Romig
|
|
|
Upload LSP101, LSP102, LSP103 and LSP104 at minimum 18"x24" sheet size per City of Boise requirements.
|
Intake Approval | | | 8/30/2017 | | FAIL |
Julie Romig
|
|
|
1. Upload IDBS approved plan set as individual sheets with file names per City of Boise naming convention.
2. Structural calculations for foundation and attachment of modular building to foundation.
3. Construction details and dimensions for stair, ramp, landing, and guardrail/handrails into modular building. If using a prefabricated ramp/stair system, provide the manufacturer specs and all information to verify that stair, ramp, landing, handrails, and guardrails are code compliant.
|
Routing PW Drainage | 7/7/2017 | | 7/7/2017 | | PASS |
Brian Murphy
|
|
|
no inspection needed eng. letter
|
Intake Approval | | | 6/1/2017 | | FAIL |
Julie Romig
|
|
|
Need:
1. Letter from civil or architect stating that drainage from a 50 year storm event will stay on site and describing where it will drain to. Contact Brian Murphy at ###-#### for additional information regarding storm water requirements.
2. Structural plans/details for foundation attachment, including standard block and tie detail for modular building installation on CMU block foundation and structural calcs.
3. Exterior landing, stair details, and ramp details showing accessible route into modular building.
|
Application received | | | 5/30/2017 | | DONE |
|
|
|
Application submitted via PDS Online on May 30 2017 8:24AM
|