Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD17-01702
StatusFinaled
Name MJT CONSTRUCTION INC
Site Address 4700 N EAGLE RD
Project NameAlbertson's Eagle Road
Customer Number 
ePlanReviewYes
Description
(ALBERTSONS EAGLE RD) **(08/10/17 PLAN MODIFICATION TO ADD NEW ROOFTOP CONDENSER. JAR) **Permit for minor tenant improvements to an existing Albertsons. Work to include replacement of refrigerated equipment and hot display cases, relocating the Floral Department and Customer Service, relocation of existing sink, replacement of exterior overhead door with new window, new non-bearing interior partition walls, new doors, new electrical, and new interior finishes in compliance with Ch. 8 of the 2012 IBC. A certificate of completion is to be issued upon completion and approval of the project. This is a fully fire sprinklered building. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 5/20/20186/11/2018 DONE
mailed 6-12
First Notice5/1/20185/1/20185/10/2018 DONE
DetailsJim Sly
mailed 5-11-18
BLD-Final4/30/20185/1/20185/1/2018APASS
DetailsJim Sly
Hello Jim,

per our conversation let me know if you would like to meet out at the site to review.

thanks
Mike Teeter Phone #: ###-#### Inspection requested via web by Mike Teeter
DOC - Permit Finaled5/1/20185/1/20185/1/2018PPASS
DetailsJim Sly
FIRE-Final Inspection3/23/20183/26/20183/26/2018APASS
DetailsTroy Cobbley
life safety passed


Mike Phone #: ###-####
FIRE-Final Inspection2/14/20182/15/20182/15/2018AFAIL
DetailsTroy Cobbley
Life safety will be ok to pass when the fire alarm modifications have been made at the flower shop and the bakery

Mike Phone #: ###-####
BLD-Ceiling Grid Inspection9/22/20179/22/20179/22/2017PPASS
DetailsJim Sly
Tom Phone #: ###-####
BLD-Framing/Rough-in9/22/20179/22/20179/22/2017PPASS
DetailsJim Sly
Tom Phone #: ###-####
BLD-Framing/Rough-in9/18/20179/18/20179/18/2017PPASS
DetailsJim Sly
Deli framing// Tom Austin Phone #: ###-####
CHANGE STATUS TO (ISS)  9/18/2017 DONE
approved plan mod fees paid
Plan assigned to (JAR)7/21/20177/21/20178/11/2017 DONE
DetailsJulie Romig
**07/21 - 08/04 - PLAN MOD - Albertsons Eagle
Routing - PLAN CHECK7/25/2017 8/11/2017 PASS
DetailsJulie Romig
Permit Ready to Issue  8/11/2017 DONE
plan mod DO NOT REISSUE; all requirements met, fees due
Routing - PLUMBING8/10/2017 8/10/2017 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing - MECHANICAL7/25/2017 7/26/2017 PASS
DetailsTroy James
Route to Impact Fee Review7/21/20177/24/20177/21/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan Modification Accepted  7/21/2017 DONE
E Plan Plan Mod-add new roof top condenser per refreigeration plans-revised sheets G0.1, A1.1, A2.1, E0.1, E1.1 & E3.1-new sheets A8.2, R1.1, R2.1, R3.1, R4.1 & R5.1-assigned to JAR
Issue PAID IN FULL permit  7/12/2017 DONE
Inspection Record Card- Bld  7/12/2017 DONE
Plan assigned to (JAR)6/6/20176/6/20177/5/2017 DONE
DetailsJulie Romig
06/19 (07/05) - L2 Eagle Rd Albertsons Remodel
Routing - PLAN CHECK6/6/2017 7/5/2017 PASS
DetailsJulie Romig
1st review completed  7/5/2017 DONE
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  7/5/2017 DONE
Permit Ready to Issue  7/5/2017 DONE
ALL MET Need GC Form and Revised Cert of Value
Routing - FIRE6/6/20176/6/20176/7/2017 PASS
DetailsKatie Marron
Separate Fire Permits will be required. No comments attached. Work involves replacing coolers/display cases throughout, creating an online order processing space and a new floral departement area.
Routing PW Environmental6/6/2017 6/6/2017 PASS
DetailsRick Christenson
Routing - MECHANICAL6/6/2017 6/6/2017 PASS
DetailsTroy James
Routing - PLUMBING6/6/2017 6/6/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - Addressing6/6/2017 6/6/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS6/6/2017 6/6/2017 PASS
DetailsRachael Beierle
Intake Approval  6/6/2017 PASS
DetailsAdele J Schaffeld-Griffin
Julie approved pre screen, health department approval uploaded in documents
Intake Approval  6/2/2017 FAIL
DetailsJulie Romig
Need:
1. Rename A, G, and F sheets with number and brief description per City of Boise naming convention. Sheets have been deleted so they can be re-uploaded.
2. Provide U-factor and SHGC for the new exterior window.
Application received  6/1/2017 DONE
Application submitted via PDS Online on Jun 1 2017 9:38AM