BLD-Blower Door Test Results | 7/17/2018 | 7/19/2018 | 7/19/2018 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Final | 7/17/2018 | 7/19/2018 | 7/19/2018 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 7/19/2018 | 7/19/2018 | 7/19/2018 | P | PASS |
Dave Hannah
|
|
|
|
PubWorks Occupancy Approval | 7/17/2018 | 7/17/2018 | 7/17/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Energy code compliance | 4/26/2018 | 4/30/2018 | 4/30/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 3/26/2018 | 3/26/2018 | 3/26/2018 | P | PASS |
Brandon Shaw
|
|
|
Duillermo Phone #: ###-####
|
BLD-Footing | 8/4/2017 | 8/4/2017 | 8/4/2017 | P | PASS |
Brandon Shaw
|
|
|
Pat Phone #: ###-####
|
PubWorks Subgrade Approval | 8/3/2017 | 8/3/2017 | 8/3/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 7/20/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 6/9/2017 | 6/9/2017 | 7/20/2017 | | DONE |
Brian McGowan
|
|
|
6/28 sfd Level 2 ePlan
|
Routing - PLAN CHECK | 6/9/2017 | | 7/20/2017 | | PASS |
Brian McGowan
|
|
|
|
Issue PAID IN FULL permit | | | 7/20/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/20/2017 | | |
|
|
|
|
1st review completed | | | 7/20/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/20/2017 | | DONE |
|
|
|
all met
|
Routing PW Grading-Hillside | 6/9/2017 | | 6/14/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Routing PW Flood Plain | 6/9/2017 | | 6/13/2017 | | PASS |
Jason C. Taylor
|
|
|
Approved LOMR on File. No floodplain requirements necessary. Jason Taylor ###-####
|
Route to Impact Fee Review | 6/9/2017 | 6/12/2017 | 6/12/2017 | | PASS |
Marissa Taylor
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 6/9/2017 | 6/9/2017 | 6/12/2017 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for FD access, hydrant availability and defensible space.
|
Routing - Addressing | 6/9/2017 | | 6/12/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - MECHANICAL | 6/9/2017 | | 6/12/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/9/2017 | | 6/9/2017 | | PASS |
Sue Cummings
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/9/2017 | | DONE |
|
|
|
|
Intake Approval | | | 6/9/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/9/2017 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 6/9/2017 | | 6/9/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 6/9/2017 | | 6/9/2017 | | PASS |
Andy J. Long
|
|
|
|
Intake Approval | | | 6/2/2017 | | FAIL |
Christina Prado
|
|
|
Need Letter of Reliance from GeoTech Engineer, Structural Engineer, Mechanical Contractor (Manual J) and a new ResCheck for Blackrock Homes because everything still under Tahoe Homes
|
Application received | | | 6/1/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 1 2017 10:15AM
|