Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-01707
StatusFinaled
Name VAN AUKER CONSTRUCTION
Site Address 10259 W EMERALD ST Unit: STE 160
Project NameBaseline LLC - Suite #160
Customer Number 
ePlanReviewYes
Description
(BASELINE, LLC – SUITE #160) Permit is to remodel an existing 14,634 sq. ft. space by combining a 3,790 sq. ft. portion of the adjacent vacant space created under BLD11-02899 to create a total of 18,424 sq. ft. business/manufacturing tenant space. Approval contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames and select wall infill, new lights, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 8/12/20179/19/2017 DONE
sent in mail 9-20-17
Permanent Occupancy  8/2/2017 DONE
Permanent Occupancy  8/2/2017 DONE
BLD-Final7/31/20178/1/20178/1/2017APASS
DetailsMike Jordan
Mark Phone #: ###-####. Ok for perm occ. No mech. was reqiured.
FIRE-Final Inspection7/31/20177/31/20177/31/2017PPASS
DetailsJim Page
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
BLD-Framing/Rough-in7/14/20177/17/20177/17/2017APASS
DetailsMike Jordan
Mark Phone #: ###-####
Plan assigned to (JG)6/8/20176/8/20176/21/2017 PASS
DetailsJavier Guzman
6/21 L2 Baseline LLC ePlan
Routing - PLAN CHECK6/8/2017 6/21/2017 PASS
DetailsJavier Guzman
1st review completed  6/21/2017 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  6/21/2017 DONE
Permit Ready to Issue  6/21/2017 DONE
DetailsChristina Prado
All requirements met
Issue PAID IN FULL permit  6/21/2017 DONE
Print Occupancy Form  6/21/2017  
Routing - FIRE6/8/20176/8/20176/9/2017 PASS
DetailsKatie Marron
Modifications to the sprinkler system and fire alarm system are indicated. No comments required.
Intake Approval  6/8/2017 PASS
DetailsAdele J Schaffeld-Griffin
Julie approved pre screen
Routing - Addressing6/8/2017 6/8/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS6/8/2017 6/8/2017 PASS
DetailsRachael Beierle
Intake Approval  6/2/2017 FAIL
DetailsJulie Romig
Need: Lighting COMcheck, lighting plan and fixture schedule for new lighting or provide data showing that new lighting does not increase the installed interior lighting power in compliance with C101.4.3 Exception 7.
Application received  6/1/2017 DONE
Application submitted via PDS Online on Jun 1 2017 10:32AM