Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD17-01710
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 2707 S SATURN WAY
Project NameXylem
Customer Number 
ePlanReviewYes
Description
(XYLEM) Permit is to remodel an existing 4,750 sq. ft. business space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select plumbing fixtures, relocate utility sink, reverse accessible restroom door swing, new accessible restroom grab bars, a new accessible van parking space, plumbing work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/17/201711/14/2017 DONE
Mailed 11-15-17
Second Notice 9/29/201710/12/2017 DONE
Mailed 10-13-17
First Notice 9/7/20179/19/2017 DONE
Permanent Occupancy  8/28/2017 DONE
BLD-Conference8/25/20178/25/20178/25/2017PCANC
DetailsMike Jordan
BLD-Final8/24/20178/25/20178/25/2017APASS
DetailsMike Jordan
call half hour before// Kevin Phone #: ###-####. Ok for perm occ.
BLD-Final8/23/20178/24/20178/24/2017ANR
DetailsMike Jordan
Call half hour before //
Kevin Phone #: ###-####. No access. Will reschedule.
FIRE-Final Inspection8/22/20178/23/20178/23/2017PPASS
DetailsTroy Cobbley
Life safety passed.

Kevin Phone #: ###-####
FIRE-Final Inspection8/8/20178/9/20178/9/2017PFAIL
DetailsTroy Cobbley
Need project related fire alrm permit finaled, provide sign for Riser Room and mount the third fire extinguisher as discussed.
FIRE-Final Inspection8/3/20178/4/20178/4/2017ACANC
DetailsTroy Cobbley
Please contact Kevin Staats for Access 30min Prior ###-#### Phone #: ###-#### Inspection requested via web by Brian McCoy
FIRE-Conference7/28/20177/28/20177/28/2017PDONE
DetailsJim Page
Fire conference is complete, exit discharge emergency lighting needs to be installed on the designated exterior exits on the west side exit in the warehouse and southeast exit (main entry into the office area). Current address on building reads 2701B, permit has the address as 2707, address needs to be verified and the correct numbering needs to be installed. There is an open FIR permit associated with this building permit, FIR17-00392 permt needs to be inspected and passed before life fire safety can be completed. The fire alarm system will be monitored when complete, the building currently does not have a knox box, a knox box needs to be installed before final life fire safety inspection.
FIRE-Final Inspection7/28/20177/28/20177/28/2017PCANC
DetailsJim Page
Inspection request is for a life fire safety conference, this inspection request is cancelled.
Print Occupancy Form  7/6/2017 DONE
Issue PAID IN FULL permit  7/6/2017 DONE
Route to Impact Fee Review6/27/20176/30/20177/3/2017 PASS
DetailsMarissa Taylor
Review requested for Commercial Permit
Routing - FIRE6/28/20176/28/20177/3/2017 PASS
DetailsKatie Marron
Revised report attached to case.
Plan assigned to (JG)6/7/20176/7/20177/3/2017 PASS
DetailsJavier Guzman
1st rev comp, 6/27 L3 Xylem T.I.ePlan
PLANS/APPL TAKEN TO FRONT DESK  7/3/2017 DONE
Permit Ready to Issue  7/3/2017 DONE
Need revised cert of value and GC form (waiting for impact fee sign off before batch stamp)
Routing - PLAN CHECK6/28/2017 7/1/2017 PASS
DetailsJavier Guzman
1st review completed  6/27/2017 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK6/7/2017 6/27/2017 FAIL
DetailsJavier Guzman
Routing - FIRE6/7/20176/7/20176/8/2017 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect.
Routing - Design Review6/7/2017 6/8/2017 PASS
DetailsSarah Schafer
Routing PW Environmental6/7/2017 6/7/2017 PASS
DetailsRick Christenson
Routing - Addressing6/7/2017 6/7/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS6/7/2017 6/7/2017 PASS
DetailsRachael Beierle
Intake Approval  6/7/2017 PASS
DetailsAdele J Schaffeld-Griffin
Carl W approved pre screen.
Plan Reviewer's activity  6/6/2017 PASS
Approved the plan intake review
Application received  6/1/2017 DONE
Application submitted via PDS Online on Jun 1 2017 10:56AM