BLD-Final | 5/7/2018 | 5/8/2018 | 5/8/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 5/8/2018 | 5/8/2018 | 5/8/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 5/4/2018 | 5/7/2018 | 5/7/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
PubWorks Occupancy Approval | 5/7/2018 | 5/7/2018 | 5/7/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 5/5/2018 | 5/8/2018 | 5/5/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall Inspection cancelled from web by: Clint Wall
|
BLD-Energy code compliance | 2/26/2018 | 3/1/2018 | 3/1/2018 | A | PASS |
Brandon Shaw
|
|
|
Replace wet insulation at- 1/2 bath, 1st floor
|
BLD-Framing/Rough-in | 2/26/2018 | 2/27/2018 | 2/27/2018 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Other | 2/9/2018 | 2/9/2018 | 2/9/2018 | P | PASS |
Brandon Shaw
|
|
|
Luna-soffit inspection Phone #: ###-####
|
BLD-Wall Bracing | 2/9/2018 | 2/9/2018 | 2/9/2018 | P | PASS |
Brandon Shaw
|
|
|
Luna Phone #: ###-####
|
BLD-Foundation | 9/20/2017 | 9/22/2017 | 9/22/2017 | P | PASS |
Brandon Shaw
|
|
|
Matt Phone #: ###-####
|
BLD-Foundation | 9/18/2017 | 9/19/2017 | 9/19/2017 | P | PASS |
Brandon Shaw
|
|
|
Matt Phone #: ###-####
|
BLD-Footing | 9/14/2017 | 9/14/2017 | 9/14/2017 | P | NR |
Jim Storey
|
|
|
Matt Phone #: ###-#### pin conflick
|
PubWorks Subgrade Approval | 9/14/2017 | 9/14/2017 | 9/14/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 8/30/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 6/9/2017 | 6/9/2017 | 8/30/2017 | | DONE |
Brian McGowan
|
|
|
1st review complete - Wall bracing needs to be modified - 6/28 sfd Level 2 ePlan
|
Routing - PLAN CHECK | 8/30/2017 | | 8/30/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/30/2017 | | DONE |
|
|
|
met
|
Issue PAID IN FULL permit | | | 8/30/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/30/2017 | | DONE |
|
|
|
|
1st review completed | | | 7/24/2017 | | FAIL |
Brian McGowan
|
|
|
Wall bracing needs to be modified
|
Routing - PLAN CHECK | 6/9/2017 | | 7/24/2017 | | FAIL |
Brian McGowan
|
|
|
Wall bracing needs to be modified
|
Routing PW Grading-Hillside | 6/9/2017 | | 6/19/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing PW Flood Plain | 6/9/2017 | | 6/15/2017 | | PASS |
Jason C. Taylor
|
|
|
Approved LOMR on File. No floodplain review required. JCT
|
Route to Impact Fee Review | 6/9/2017 | 6/12/2017 | 6/12/2017 | | PASS |
Marissa Taylor
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 6/9/2017 | | 6/12/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - MECHANICAL | 6/9/2017 | | 6/12/2017 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 6/9/2017 | 6/9/2017 | 6/9/2017 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for FD access, hydrant availability and defensible space. A cross access agreement creates a 20' shared drive for access to this structure. The lot to the rear of the structure is to a common lot to be maintained by the HOA per the final plat.
|
Routing - PUBLIC WORKS | 6/9/2017 | | 6/9/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 6/9/2017 | | 6/9/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Valid RP
|
Routing - PLANNING | 6/9/2017 | | 6/9/2017 | | PASS |
Sue Cummings
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/9/2017 | | DONE |
|
|
|
|
Intake Approval | | | 6/9/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/9/2017 | | DONE |
|
|
|
|
Intake Approval | | | 6/2/2017 | | FAIL |
Christina Prado
|
|
|
Need Letter of Reliance from GeoTech Engineer, Structural Engineer, Mechanical Contractor (Manual J) and a new ResCheck for Blackrock Homes because everything still under Tahoe Homes
|
Application received | | | 6/1/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 1 2017 11:20AM
|