BLD-Final | 7/10/2018 | 7/10/2018 | 7/10/2018 | P | PASS |
Jim Sly
|
|
|
call 30 mins ahead-Roy Phone #: ###-####
|
DOC - Permit Finaled | 7/10/2018 | 7/10/2018 | 7/10/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 11/20/2017 | 11/21/2017 | 11/24/2017 | P | PASS |
Jim Sly
|
|
|
Aaron-shop in back-call for access Phone #: ###-####
|
BLD-Footing | 8/4/2017 | 8/4/2017 | 8/4/2017 | P | PASS |
Jim Sly
|
|
|
Ryan Phone #: ###-####
|
Routing Walk-In (BLD) | 8/2/2017 | 8/2/2017 | 8/2/2017 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/2/2017 | | 8/2/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/2/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/2/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2017 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 8/2/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/2/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 7/18/2017 | 7/18/2017 | 7/18/2017 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/18/2017 | | 7/18/2017 | | FAIL |
Josh Bogle
|
|
|
engineering based on 20# snow load
|
Routing Walk-In (Zoning) | 6/1/2017 | 6/1/2017 | 6/1/2017 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 6/1/2017 | 6/1/2017 | 6/1/2017 | P | FAIL |
Brian McGowan
|
|
|
Proposing post and beam construction with 12' tall walls. Will need to provide foundation, floor plan, sections and stamped calculations/engineering for the structure.
|
1st review completed | | | 6/1/2017 | | FAIL |
Brian McGowan
|
|
|
Proposing post and beam construction with 12' tall walls. Will need to provide foundation, floor plan, sections and stamped calculations/engineering for the structure.
|
Routing - PLAN CHECK | 6/1/2017 | | 6/1/2017 | | FAIL |
Brian McGowan
|
|
|
Proposing post and beam construction with 12' tall walls. Will need to provide foundation, floor plan, sections and stamped calculations/engineering for the structure.
|
Application received | | 6/1/2017 | | | |
|
|
|
|