Permit Information
Permit NumberBLD17-01728
StatusIssued
Name H20 POOLS & DESIGN LLC
Site Address 348 S 13TH ST
Project NameHilton Garden Inn Pool & Spa
Customer Number 
ePlanReviewNo
Description
(HILTON GARDEN INN POOL & SPA) Permit for the construction of the pool and spa in the Hilton Garden Inn. The occupant load and the means of egress from this area were evaluated under the main building permit and this permit is only for the pool installation per the approved plans. The building is fully fire sprinklered for R occupancy. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. The total occupant load of the pool, spa and deck area is 48 occupants. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/24/20189/24/20189/24/2018PPASS
DetailsDave Hannah
Lance Phone #: ###-####
BLD-Final7/13/20187/16/20187/16/2018APASS
DetailsDave Hannah
Lance Phone #: ###-####
BLD-Aging Inspection11/9/201711/9/201711/16/2017 PEND
DetailsDave Hannah
BLD-Foundation6/26/20176/27/20176/28/2017PDONE
DetailsDave Hannah
Rebar // Lance Phone #: ###-####
BLD-Concrete6/28/20176/28/20176/28/2017APASS
DetailsDave Hannah
Rebar // Lance Phone #: ###-####
Permit Ready to Issue  6/26/2017 DONE
need GC Form
Print Occupancy Form  6/26/2017 DONE
Telephone call  6/26/2017 DONE
Spoke with Lance informing him this permit is ready and that a GC Form is needed
Issue PAID IN FULL permit  6/26/2017 DONE
Plan assigned to (CDM)6/2/20176/2/20176/24/2017 PASS
DetailsCarl D Madsen
Hilton Pool
Routing - PLAN CHECK6/20/2017 6/24/2017 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  6/24/2017 DONE
Routing - FIRE6/19/20176/17/20176/20/2017 PASS
DetailsScott Arellano
PDS Fire Inspector to verify signage is provided at pool equipment room indentify the room as well as the type of chemical/hazard present. Additionally verify chemicals are stored properly contained to prevent spills and separated from incompatible materials.
1st review completed  6/20/2017 PASS
Case Summary (BLD)  6/17/2017 DONE
Routing - PLAN CHECK6/2/2017 6/17/2017 PASS
DetailsCarl D Madsen
Plans ACCEPTED BY PLAN TECH  6/2/2017 DONE
Intake Approval  6/2/2017 PASS
DetailsJavier Guzman
Recd Pcfee & Taken To Pln CK  6/2/2017 DONE
Pending Assignment by AJS6/2/2017 6/2/2017 DONE
DetailsAdele J Schaffeld-Griffin
Plan Reviewer's activity  6/2/2017 DONE
DetailsAdele J Schaffeld-Griffin
Per Bev PW does not need to review pool, included in initial review.
Application received 6/1/2017