BLD-Final | 1/19/2018 | 1/22/2018 | 1/22/2018 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
DOC - Permit Finaled | 1/22/2018 | 1/22/2018 | 1/22/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 1/18/2018 | 1/19/2018 | 1/19/2018 | P | CANC |
Jim Storey
|
|
|
Call 30 minutes in advance please Phone #: ###-#### >> Inspection requested via web by bryan murdoch Inspection cancelled from web by: bryan murdoch
|
PubWorks Occupancy Approval | 1/18/2018 | 1/18/2018 | 1/18/2018 | | DONE |
Melissa Jannusch
|
|
|
BOND
|
BLD-Energy code compliance | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | PASS |
Jim Storey
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
Plan Modification Accepted | | | 10/26/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 10/26/2017 | | 10/26/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Framing/Rough-in | 10/24/2017 | 10/24/2017 | 10/24/2017 | P | PART |
Jim Storey
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch need header at pocket door west bath. ok to insulate
|
BLD-Wall Bracing | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | PASS |
Jim Storey
|
|
|
Thanks Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Foundation | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Footing | 7/12/2017 | 7/13/2017 | 7/13/2017 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
Routing - PUBLIC WORKS GRADING | 7/11/2017 | | 7/11/2017 | | PASS |
Jim Wyllie
|
|
|
Received letter from Site Consulting approving footing subgrade. Okay to schedule a footing inspection.
Jim Wyllie / ###-####
|
OVERRIDE | | | 7/7/2017 | | |
|
|
|
|
Plan assigned to (BJM) | | 6/2/2017 | 7/7/2017 | | DONE |
Brian McGowan
|
|
|
1st review complete- FAIL- 6/22 sfd Level 2 paper
|
Inspection Record Card- Bld | | | 7/7/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/7/2017 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 6/29/2017 | | 7/7/2017 | | PASS |
Jason C. Taylor
|
|
|
Approved resubmittals. JCT
|
Routing - PLAN CHECK | 7/7/2017 | | 7/7/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 7/7/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/7/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/7/2017 | | DONE |
|
|
|
All requirements are met
|
Plan resubmittals received | | | 6/29/2017 | | DONE |
|
|
|
received three copies of plan sheet C1 and two copies of plan sheets s101, s102, s105 and engineering calcs; taken to Brian McGowan
|
1st review completed | | | 6/27/2017 | | FAIL |
Brian McGowan
|
|
|
Need engineering for knee brace support, foundation plan revisions and possibly grading plan revisions.
|
Routing - PLAN CHECK | 6/16/2017 | | 6/27/2017 | | FAIL |
Brian McGowan
|
|
|
Need engineering for knee brace support, foundation plan revisions and possibly grading plan revisions.
|
Routing - PLANNING | 6/12/2017 | | 6/27/2017 | | PASS |
Sue Cummings
|
|
|
|
Routing - FIRE | 6/15/2017 | 6/2/2017 | 6/16/2017 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for FD Access, hydrant availability and defensible space.
|
Routing - Erosion and Sediment | 6/13/2017 | | 6/15/2017 | | PASS |
Andy J. Long
|
|
|
ESC site plan and narrative approved. Valid PD and RP. ESC site preparation inspection is required.
|
Routing - MECHANICAL | | | 6/13/2017 | | PASS |
Troy James
|
|
|
|
Routing PW Grading-Hillside | 6/12/2017 | | 6/12/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 6/12/2017 | | 6/12/2017 | | PASS |
Rachael Beierle
|
|
|
|
Plan resubmittals received | | | 6/6/2017 | | DONE |
|
|
|
resubmittal received 2 small site plans and 2 of sheet C1-called Brian M to see if i should take them to JCT-no answer so took to Brian McGowan
|
Routing PW Grading-Hillside | 6/2/2017 | | 6/6/2017 | | FAIL |
Jason C. Taylor
|
|
|
Need updated grading plans dropped off for review. Stamp date of 5-31-17 is needed. JCT
|
Routing - PUBLIC WORKS | 6/6/2017 | | 6/6/2017 | | FAIL |
Rachael Beierle
|
|
|
|
Route to Impact Fee Review | 6/2/2017 | 6/5/2017 | 6/5/2017 | | PASS |
Marissa Taylor
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 6/2/2017 | | 6/2/2017 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/2/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/2/2017 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/2/2017 | | DONE |
Christina Prado
|
|
|
|
Routing PW Sewer Rating | 6/2/2017 | | 6/2/2017 | | PASS |
Morgan Webb
|
|
|
|
Application received | | 6/2/2017 | | | |
|
|
|
|