Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD17-01740
StatusFinaled
Name COVERTECH
Site Address 4490 W QUAIL RIDGE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for 390sq' of pre-engineered metal patio cover. All work per plans, engineering, manufacturer’s specs, & local code. **JAB** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 608-7168
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/18/20177/19/20177/19/2017APASS
DetailsJim Sly
This final can be done at anytime. I received the MTI report on Monday, so I am assuming you did too. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
DOC - Permit Finaled7/19/20177/19/20177/19/2017PPASS
DetailsJim Sly
BLD-Footing6/27/20176/28/20176/29/2017PPEND
DetailsJim Sly
The subgrade inspection is scheduled for 2 PM tomorrow. Should be ready after that. Jimmy will be the contact for this and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
BLD-Footing6/26/20176/27/20176/28/2017PPEND
DetailsTony Young
The subgrade inspection is scheduled for 2 PM tomorrow. Should be ready after that. Jimmy will be the contact for this and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch,, needs soils report
Routing Walk-In (BLD)6/2/20176/2/20176/23/2017PDONE
DetailsJosh Bogle
Routing - PLAN CHECK6/6/2017 6/23/2017 PASS
DetailsJosh Bogle
Plan assigned to (JAB) Josh6/6/2017 6/23/2017 PASS
DetailsJosh Bogle
1st review completed  6/23/2017 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  6/23/2017 DONE
DetailsJosh Bogle
Case Summary (BLD)  6/23/2017 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  6/23/2017 DONE
DetailsJosh Bogle
Permit Ready to Issue  6/23/2017 DONE
Telephone call  6/23/2017 DONE
called to let know permit is ready-she will let Rich know
Issue PAID IN FULL permit  6/23/2017 DONE
Routing PW Grading-Hillside6/6/2017 6/6/2017 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Routing Walk-In (Zoning)6/2/20176/2/20176/2/2017PDONE
DetailsDavid Moser
Application received 6/2/2017