BLD-Aging Inspection | 12/1/2017 | 12/1/2017 | 12/5/2017 | | PEND |
Tony Young
|
|
|
|
PubWorks Subgrade Approval | 7/28/2017 | 7/28/2017 | 7/28/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Final | 7/18/2017 | 7/19/2017 | 7/19/2017 | A | FAIL |
Brandon Shaw
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Footing poured and patio cover in place prior to approval.
|
BLD-Footing | 6/27/2017 | 6/28/2017 | 6/28/2017 | P | PEND |
Tony Young
|
|
|
Footing inspection can be done early in the PM tomorrow. Sub grade inspection is tomorrow AM. There was water in one of holes and it couldn''t be done this afternoon. Sorry. Marcus is the contact and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD-Footing | 6/26/2017 | 6/27/2017 | 6/27/2017 | P | PEND |
Tony Young
|
|
|
Footing inspection can be done early in the PM tomorrow. Sub grade inspection is tomorrow AM. There was water in one of holes and it couldn''t be done this afternoon. Sorry. Marcus is the contact and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD-Footing | 6/26/2017 | 6/26/2017 | 6/27/2017 | P | NR |
Dave Hannah
|
|
|
The subgrade inspection for this is happening at 2:00 P.M. on Monday, so if there is a way to come after that, that would be fantastic. Marcus will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch still no geo tech report
|
BLD-Footing | 6/23/2017 | 6/26/2017 | 6/26/2017 | A | NR |
Tony Young
|
|
|
The subgrade inspection for this is happening at 2:00 P.M. on Monday, so if there is a way to come after that, that would be fantastic. Marcus will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch,, needs soils 1st
|
BLD-Footing | 6/23/2017 | 6/23/2017 | 6/23/2017 | P | DEFR |
Jim Storey
|
|
|
The subgrade inspection for this is happening at 2:00 P.M. on Monday, so if there is a way to come after that, that would be fantastic. Marcus will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
Routing Walk-In (BLD) | 6/2/2017 | 6/2/2017 | 6/23/2017 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/6/2017 | | 6/23/2017 | | PASS |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 6/6/2017 | | 6/23/2017 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/23/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/23/2017 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/23/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/23/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/23/2017 | | DONE |
|
|
|
|
Telephone call | | | 6/23/2017 | | DONE |
|
|
|
called to let know permit is ready-she will let Rich know
|
Issue PAID IN FULL permit | | | 6/23/2017 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 6/6/2017 | | 6/6/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 6/2/2017 | 6/2/2017 | 6/2/2017 | P | DONE |
David Moser
|
|
|
|
Application received | | 6/2/2017 | | | |
|
|
|
|