BLD-Final | 6/15/2018 | 6/18/2018 | 6/18/2018 | A | PASS |
Tony Young
|
|
|
Please call Ren Nelson to meet you about 15 minutes before you come. Phone #: ###-#### Inspection requested via web by Jon King
|
DOC - Permit Finaled | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 6/15/2018 | 6/15/2018 | 6/15/2018 | P | PEND |
Tony Young
|
|
|
Please call Ren Nelson to meet you about 15 minutes before you come. Phone #: ###-#### Inspection requested via web by Jon King,, ok pending fireplace final
|
BLD-Final | 6/12/2018 | 6/15/2018 | 6/15/2018 | A | NR |
Dave Hannah
|
|
|
Please call Ren Nelson to meet you about 15 minutes before you come. Phone #: ###-#### Inspection requested via web by Jon King needs fireplace final and hill side final
|
PubWorks Occupancy Approval | 6/15/2018 | 6/15/2018 | 6/15/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Aging Inspection | 6/8/2018 | 6/8/2018 | 6/12/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 1/25/2018 | 1/25/2018 | 1/25/2018 | A | PASS |
Brandon Shaw
|
|
|
Fire blocking- sat
OK to cover
|
BLD-Wall cover | 1/24/2018 | 1/25/2018 | 1/25/2018 | A | CANC |
Brandon Shaw
|
|
|
Ren Phone #: ###-####
|
BLD-Framing/Rough-in | 12/27/2017 | 12/27/2017 | 12/27/2017 | P | PART |
Dave Hannah
|
|
|
Ren Phone #: ###-#### ok to insulate need to check fire blocking at energy
|
Plan Modification Accepted | | | 12/19/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 12/19/2017 | | 12/19/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 11/6/2017 | 11/7/2017 | 11/7/2017 | P | PASS |
Tony Young
|
|
|
Ren Phone #: ###-####
|
BLD-Foundation | 8/15/2017 | 8/16/2017 | 8/16/2017 | A | PART |
Tony Young
|
|
|
Eric-pour time 11:15 Phone #: ###-####,, work in progress
|
BLD-Footing | 8/14/2017 | 8/14/2017 | 8/14/2017 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Jon King
|
BLD-Footing | 8/12/2017 | 8/14/2017 | 8/14/2017 | A | PASS |
Tony Young
|
|
|
Eric Phone #: ###-####-would like as late AM as possible will have a 12:00 pour time
|
BLD-Foundation | 8/10/2017 | 8/14/2017 | 8/14/2017 | P | CANC |
Tony Young
|
|
|
Eric Phone #: ###-#### Inspection cancelled from web by: Jon King
|
PubWorks Subgrade Approval | 8/14/2017 | 8/14/2017 | 8/14/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Footing | 8/11/2017 | 8/11/2017 | 8/12/2017 | P | NR |
Tony Young
|
|
|
Eric Phone #: ###-####-would like as late AM as possible will have a 12:00 pour time
|
BLD-Footing | 8/8/2017 | 8/11/2017 | 8/11/2017 | A | NR |
Tony Young
|
|
|
Eric Phone #: ###-####-would like as late AM as possible will have a 12:00 pour time,, need soils report
|
OVERRIDE | | | 7/31/2017 | | |
|
|
|
|
Routing - FIRE | 7/27/2017 | 7/27/2017 | 7/31/2017 | | PASS |
Scott Arellano
|
|
|
Approved with conditions. See attached report in case.
|
Plan assigned to (BJM) | 6/7/2017 | 6/7/2017 | 7/31/2017 | | DONE |
Brian McGowan
|
|
|
1st review complete - Fail - 6/26 sfd level 2 ePlan
|
Routing - PLAN CHECK | 7/31/2017 | | 7/31/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/31/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/31/2017 | | DONE |
|
|
|
met
|
Inspection Record Card- Bld | | | 7/31/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/31/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/27/2017 | | 7/27/2017 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 7/13/2017 | | FAIL |
Brian McGowan
|
|
|
WUI requirements and form 310 needed.
|
Routing - PLAN CHECK | 6/7/2017 | | 7/13/2017 | | FAIL |
Brian McGowan
|
|
|
|
Routing PW Grading-Hillside | 6/7/2017 | | 6/15/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - MECHANICAL | 6/7/2017 | | 6/9/2017 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 6/7/2017 | | 6/9/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Valid RP and PD provided. Site preparation inspection required.
|
Route to Impact Fee Review | 6/7/2017 | 6/10/2017 | 6/8/2017 | | PASS |
Marissa Taylor
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 6/7/2017 | 6/7/2017 | 6/8/2017 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to applicant
|
Plans ACCEPTED BY PLAN TECH | | | 6/7/2017 | | DONE |
|
|
|
|
Intake Approval | | | 6/7/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/7/2017 | | DONE |
|
|
|
|
Routing - PLANNING | 6/7/2017 | | 6/7/2017 | | PASS |
Susan Riggs
|
|
|
|
Routing - Addressing | 6/7/2017 | | 6/7/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/7/2017 | | 6/7/2017 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 6/6/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 6 2017 8:49AM
|