BLD-Final | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | PASS |
Jim Sly
|
|
|
Please call 15 minutes before arrival so the foreman, Dusty Creps, can get there to open the house. Phone #: ###-#### Inspection requested via web by Jon King
|
DOC - Permit Finaled | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | PASS |
Jim Sly
|
|
|
|
PubWorks Occupancy Approval | 5/23/2018 | 5/23/2018 | 5/23/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Aging Inspection | 4/27/2018 | 4/27/2018 | 5/1/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 12/13/2017 | 12/14/2017 | 12/14/2017 | A | PASS |
Dave Hannah
|
|
|
Dusty Phone #: ###-####
|
BLD-Wall Bracing | 12/4/2017 | 12/4/2017 | 12/5/2017 | P | PART |
Dave Hannah
|
|
|
Shear // John Phone #: ###-#### ext ok to cover but need to check hold downs at framing
|
BLD-Foundation | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | PASS |
Dave Hannah
|
|
|
Greg Phone #: ###-####
|
BLD-Foundation | 9/15/2017 | 9/18/2017 | 9/18/2017 | A | PASS |
Dave Hannah
|
|
|
Wall // Greg Phone #: ###-####
|
BLD-Foundation | 9/1/2017 | 9/5/2017 | 9/5/2017 | A | PASS |
Dave Hannah
|
|
|
Jon Phone #: ###-####
|
BLD-Footing | 8/23/2017 | 8/23/2017 | 8/23/2017 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-#### lower end
|
BLD-Footing | 8/23/2017 | 8/23/2017 | 8/23/2017 | P | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Inspection Record Card- Bld | | | 8/3/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/3/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 8/2/2017 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 6/8/2017 | 6/8/2017 | 8/2/2017 | | PASS |
Josh Bogle
|
|
|
1st comp. - 7-10 applicant getting more info for Hillside
|
Routing PW Grading-Hillside | 8/2/2017 | | 8/2/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 8/2/2017 | | 8/2/2017 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Override - Parcel Holds | | | 8/2/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 8/2/2017 | | DONE |
|
|
|
Need RP
|
Routing - PLANNING | 7/12/2017 | | 7/12/2017 | | PASS |
Sue Cummings
|
|
|
Not to be used as an ADU without Planning approval. No installation of standard stove is permitted. As per Cody Riddle
|
Routing PW Grading-Hillside | 7/5/2017 | | 7/7/2017 | | FAIL |
Jason C. Taylor
|
|
|
see changemarks. JCT
|
Routing - MECHANICAL | 7/6/2017 | | 7/6/2017 | | PASS |
Troy James
|
|
|
No manaul j report. Ductless mini splits. Redlined plans to provide mechanical ventilation with bath fan or other approved method.
|
Routing - PLAN CHECK | 6/8/2017 | | 6/15/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing PW Grading-Hillside | 6/8/2017 | | 6/9/2017 | | FAIL |
Jason C. Taylor
|
|
|
Project will require a CAT II Hillside application prior to acceptance of the building permit application. Application #114 will need to be filled out and turned in to the Planning & Zoning counter at city hall with the application fee. Once the application has been approved by P&Z please upload the approval letter and then this building permit case can be routed for approval. Jason Taylor ###-####.
|
Routing - Erosion and Sediment | 6/8/2017 | | 6/9/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan with site map approved. Valid PD, RP to be determined by contractor. Site preparation inspection required, call ###-####
|
1st review completed | | | 6/8/2017 | | FAIL |
Josh Bogle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/8/2017 | | DONE |
|
|
|
|
Intake Approval | | | 6/8/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/8/2017 | | DONE |
|
|
|
|
Application received | | | 6/7/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 7 2017 11:45AM
|
Intake Approval | | | 6/7/2017 | | FAIL |
|
|
|
talked to customer, he needs to upload some docuemnts and needed me to fail the task so he could- i also askd him to rotate drawings so they faced the correct way
|
PubWorks Subgrade Approval | 8/23/2018 | 8/23/2018 | | | |
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####. I originally accidentally entered the subgrade inspection as a “footing inspection” I added this inspection to show the correct inspection type.
|
Routing - PLANNING | 6/8/2017 | | | | FAIL |
|
|
|
Needs readable site plan drawn to scale with dimensions. Additions appears to be in front setback. Addition contains an ADU with no prior approval.
|
Routing - PLAN CHECK | 7/5/2017 | | | | |
Josh Bogle
|
|
|
|