BLD-Final | 4/1/2018 | 4/2/2018 | 4/2/2018 | P | PASS |
Tony Young
|
|
|
Elevation certificate complete- Jason Taylor to review All other inspections passed Phone #: ###-#### Inspection requested via web by Daniel Appel
|
DOC - Permit Finaled | 4/2/2018 | 4/2/2018 | 4/2/2018 | P | PASS |
Tony Young
|
|
|
c of o issued
|
PubWorks Occupancy Approval | 4/2/2018 | 4/2/2018 | 4/2/2018 | | DONE |
Jason C. Taylor
|
|
|
|
BLD-Wall cover | 1/25/2018 | 1/26/2018 | 1/26/2018 | P | PASS |
Tony Young
|
|
|
after 3 PM please Phone #: ###-#### Inspection requested via web by Daniel Appel
|
BLD-Energy code compliance | 1/25/2018 | 1/26/2018 | 1/26/2018 | P | PASS |
Tony Young
|
|
|
after 3 PM please Phone #: ###-#### Inspection requested via web by Daniel Appel,, work in progress
|
BLD-Framing/Rough-in | 1/25/2018 | 1/26/2018 | 1/26/2018 | P | PASS |
Tony Young
|
|
|
after 3 PM please Phone #: ###-#### Inspection requested via web by Daniel Appel
|
BLD-Other | 1/25/2018 | 1/25/2018 | 1/25/2018 | P | PASS |
Tony Young
|
|
|
Dan; Phone #: ###-####,, soffits
|
BLD-Framing/Rough-in | 1/24/2018 | 1/25/2018 | 1/25/2018 | A | PART |
Tony Young
|
|
|
Dan; Phone #: ###-####,, corrections,, ok to insulate
|
BLD-Framing/Rough-in | 1/23/2018 | 1/23/2018 | 1/23/2018 | P | NR |
Jim Sly
|
|
|
Dan Phone #: ###-#### Inspection requested via web by Daniel Appel Need Mech approval.
|
BLD-Wall Bracing | 1/5/2018 | 1/8/2018 | 1/8/2018 | A | PASS |
Jim Sly
|
|
|
Dan Phone #: ###-#### Exterior shear nailing only......OK.
|
Override - Condition Holds | 1/5/2018 | 1/1/1900 | 1/5/2018 | | |
|
|
|
Wall bracing inspection
|
Elevation Cert Rec'd-Midconst | | | 12/19/2017 | | DONE |
|
|
|
Recieved elevation certificate #2
|
BLD-Foundation | 11/21/2017 | 11/22/2017 | 11/22/2017 | P | PART |
Tony Young
|
|
|
dane Phone #: ###-####
|
BLD-Foundation | 11/21/2017 | 11/22/2017 | 11/22/2017 | A | PART |
Tony Young
|
|
|
Dane Phone #: ###-####,, most rebar is in place
|
BLD-Foundation | 11/20/2017 | 11/21/2017 | 11/21/2017 | P | NR |
Tony Young
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 11/17/2017 | 11/20/2017 | 11/20/2017 | P | PART |
Tony Young
|
|
|
dane Phone #: ###-####,, setbacks appear ok,, work in progress
|
BLD-Footing | 11/14/2017 | 11/15/2017 | 11/15/2017 | P | NR |
Brandon Shaw
|
|
|
Dane Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/31/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/31/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 8/15/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 6/8/2017 | 6/8/2017 | 8/15/2017 | | DONE |
Brian McGowan
|
|
|
Waiting for floodplain approval-1st Review complete - FAIL- 6/21 sfd L2 ePlan
|
Elevation Cert Rec'd-Prelim | | | 8/15/2017 | | DONE |
|
|
|
|
Routing PW Flood Plain | 8/15/2017 | | 8/15/2017 | | PASS |
Jason C. Taylor
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/15/2017 | | DONE |
|
|
|
met
|
Routing - PLAN CHECK | 8/7/2017 | | 8/7/2017 | | PASS |
Brian McGowan
|
|
|
|
Routing PW Flood Plain | 8/1/2017 | | 8/1/2017 | | FAIL |
Jason C. Taylor
|
|
|
see changemarks in ePlan JCT
|
Routing - PUBLIC WORKS | 6/8/2017 | | 7/6/2017 | | PASS |
Rachael Beierle
|
|
|
|
1st review completed | | | 6/28/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering required.
|
Routing - PLAN CHECK | 6/8/2017 | | 6/28/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering required.
|
Routing PW Flood Plain | 6/8/2017 | | 6/13/2017 | | FAIL |
Jason C. Taylor
|
|
|
Plan shows flood opening in garage door. Elevation Certificate says there are no flood openings? which one is correct? Based on Grading plan openings will be needed and shown correctly on plans and Elevation Certificate. Show type of opening, area of openings, manufactured specified type of opening, show opeing no taller than 12" from grade in door, etc. Jason Taylor ###-####
|
Routing - MECHANICAL | 6/8/2017 | | 6/12/2017 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 6/8/2017 | 6/11/2017 | 6/9/2017 | | PASS |
Marissa Taylor
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 6/8/2017 | | 6/9/2017 | | PASS |
Laura Hunter
|
|
|
|
Application received | | | 6/8/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 8 2017 9:32AM
|
Plans ACCEPTED BY PLAN TECH | | | 6/8/2017 | | DONE |
|
|
|
|
Intake Approval | | | 6/8/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/8/2017 | | DONE |
|
|
|
|
Routing - PLANNING | 6/8/2017 | | 6/8/2017 | | PASS |
Sue Cummings
|
|
|
|