BLD-Ceiling Grid Inspection | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | PASS |
Jim Sly
|
|
|
Call half before // Dan Phone #: ###-#### Should have been a Final FINAL PASS
|
DOC - Permit Finaled | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PEND |
Mike Jordan
|
|
|
Please call contractor when on way, if possible. Phone #: ###-#### Inspection requested via web by Dan Beck. Needs blowwer door test, and plumbing final(trim piece for tub on order). Everything else ok.
|
BLD-Final | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 6/18/2018 | 6/20/2018 | 6/20/2018 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Dan Beck
|
BLD-Energy code compliance | 3/7/2018 | 3/8/2018 | 3/8/2018 | A | PASS |
Brandon Shaw
|
|
|
30 mins ahead- Dan Phone #: ###-####
|
BLD-Framing/Rough-in | 2/16/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Jim Sly
|
|
|
call when on way to meet// Dan Phone #: ###-#### Frame and Shear........OK.
|
Plan Modification Accepted | | | 1/29/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 1/29/2018 | | 1/29/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
OVERRIDE | | | 11/20/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 11/17/2017 | 11/17/2017 | 11/20/2017 | | DONE |
Brian McGowan
|
|
|
Plan Mod- ASAP
|
Routing - PLAN CHECK | 11/20/2017 | | 11/20/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 11/20/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/20/2017 | | DONE |
|
|
|
met but please DO NOT RE-ISSUE
|
Inspection Record Card- Bld | | | 11/20/2017 | | DONE |
|
|
|
|
Telephone call | | | 11/20/2017 | | DONE |
|
|
|
called Dan to let know plan mod is ready and that there are fees due
|
CHANGE STATUS TO (ISS) | | | 11/20/2017 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 11/17/2017 | | DONE |
|
|
|
modification for heigten/lower roof in multiple areas. Received two copies of revised plan sheet and engineering for tall walls on garage.
|
OVERRIDE | | | 10/13/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 10/10/2017 | 10/10/2017 | 10/13/2017 | | DONE |
Brian McGowan
|
|
|
resubmittal 10-16 paper
|
Telephone call | | | 10/13/2017 | | DONE |
|
|
|
called Dan to let him know the plan mod fee is ready and how much is owed-he will come in and talk to Rita about the fees
|
CHANGE STATUS TO (ISS) | | | 10/13/2017 | | DONE |
|
|
|
Plan mod
|
(F) Reprint permit | | | 10/13/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/13/2017 | | DONE |
|
|
|
do not re issue
|
Routing - PLAN CHECK | 10/11/2017 | | 10/12/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/12/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLANNING | 10/10/2017 | | 10/11/2017 | | PASS |
Sue Cummings
|
|
|
Didn't change redlines. Driveway needs 3' side setback and cannot exceed 33' in width
|
Plan Modification Accepted | | | 10/10/2017 | | DONE |
|
|
|
Plan modification accepted. Moved garage bay to accommodate irrigation easement. Received (2) copies full set of full sized plans. Routed to planning & plan check
|
BLD-Foundation | 8/13/2017 | 8/14/2017 | 8/14/2017 | A | PART |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 8/10/2017 | 8/11/2017 | 8/11/2017 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Conference | 8/10/2017 | 8/11/2017 | 8/10/2017 | P | CANC |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo Inspection cancelled via mobile web on Thursday, August 10, 2017.
|
BLD-Footing | 8/6/2017 | 8/7/2017 | 8/7/2017 | A | NR |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo . No one on site. footings not yet excavated.
|
Issue PAID IN FULL permit | | | 8/1/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 6/26/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 6/12/2017 | 6/12/2017 | 6/26/2017 | | DONE |
Brian McGowan
|
|
|
6/22 sfd L1 paper
|
Routing - PLAN CHECK | 6/14/2017 | | 6/26/2017 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLANNING | 6/12/2017 | | 6/26/2017 | | PASS |
|
|
|
See redlines. Maximum drieway width is 33 ft. in front setback and a 3 ft. wide landscape buffer along the south side of the driveway is also required.
|
Telephone call | | | 6/26/2017 | | DONE |
|
|
|
called Dan to let know permit is ready and how much is owed-left message on his phone
|
Case Summary (BLD) | | | 6/26/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 6/26/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/26/2017 | | DONE |
|
|
|
all met
|
1st review completed | | | 6/23/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 6/12/2017 | | 6/14/2017 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 6/12/2017 | 6/15/2017 | 6/13/2017 | | PASS |
Marissa Taylor
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 6/12/2017 | | 6/12/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/12/2017 | | 6/12/2017 | | PASS |
Rachael Beierle
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/12/2017 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/9/2017 | | DONE |
|
|
|
|
Intake Approval | | | 6/9/2017 | | PASS |
|
|
|
|
BLD-Footing | 11/20/2017 | 11/20/2017 | | P | |
|
|
|
###-#### - Heron
|
Application received | | 6/9/2017 | | | |
|
|
|
|