BLD-Final | 6/19/2017 | 6/20/2017 | 6/20/2017 | A | PASS |
Jim Storey
|
|
|
Aaron Phone #: ###-####
|
DOC - Permit Finaled | 6/20/2017 | 6/20/2017 | 6/20/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Footing | 6/14/2017 | 6/15/2017 | 6/15/2017 | P | PASS |
Jim Storey
|
|
|
This footing inspection can be done early in the PM tomorrow. Aaron will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
Issue PAID IN FULL permit | | | 6/14/2017 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 6/13/2017 | 6/13/2017 | 6/13/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing Walk-In (BLD) | 6/12/2017 | 6/12/2017 | 6/13/2017 | A | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 6/13/2017 | | 6/13/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 6/13/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 6/13/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 6/13/2017 | | DONE |
|
|
|
|
Telephone call | | | 6/13/2017 | | DONE |
|
|
|
called Rich and left vm permit is ready and fee due
|
Routing Walk-In (Zoning) | 6/12/2017 | 6/12/2017 | 6/12/2017 | A | DONE |
Sue Cummings
|
|
|
|
1st review completed | | | 6/12/2017 | | FAIL |
Brian McGowan
|
|
|
Need engineering detail showing beam into existing wall
|
Routing - PLAN CHECK | 6/12/2017 | | 6/12/2017 | | FAIL |
Brian McGowan
|
|
|
Need engineering detail showing beam into existing wall
|
Application received | | 6/12/2017 | | | |
|
|
|
|