BLD-Energy code compliance | 8/17/2017 | 8/21/2017 | 8/21/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Don Gerber
|
DOC - Permit Finaled | 8/21/2017 | 8/21/2017 | 8/21/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 8/16/2017 | 8/16/2017 | 8/16/2017 | P | PASS |
Tony Young
|
|
|
Don Phone #: ###-####,, ok to insulate,, verify seal package
|
BLD-Energy code compliance | 7/5/2017 | 7/6/2017 | 7/6/2017 | A | PART |
Jim Sly
|
|
|
Inspection for floor insulation so we can cover floor, thanks Phone #: ###-#### Inspection requested via web by Don Gerber Under floor.....OK
|
Routing Walk-In (BLD) | 7/5/2017 | 7/5/2017 | 7/5/2017 | A | PASS |
Josh Bogle
|
|
|
discussed the re-use of existing doors JAB
|
BLD-Footing | 6/27/2017 | 6/27/2017 | 6/27/2017 | P | PASS |
Tony Young
|
|
|
Colton Phone #: ###-####
|
OVERRIDE | | | 6/13/2017 | | |
|
|
|
|
Routing Walk-In (Zoning) | 6/13/2017 | 6/13/2017 | 6/13/2017 | P | PASS |
Katelyn Menuge
|
|
|
DRH17-00240
|
Routing Walk-In (BLD) | 6/13/2017 | 6/13/2017 | 6/13/2017 | P | DONE |
Josh Bogle
|
|
|
|
1st review completed | | | 6/13/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/13/2017 | | 6/13/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/13/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/13/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/13/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/13/2017 | | DONE |
|
|
|
|
Application received | | 6/13/2017 | | | |
|
|
|
|