Permit Information
Permit NumberBLD17-01950
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMicron B39 CUP
Customer NumberC29420
ePlanReviewYes
Description
(MICRON)(C29420 B39 Central Utility Plant 3 (CUP) PLAN MODIFICATION 1 FOR ALL RELATED MECHANICAL, PLUMBING, ELECTRICAL AND INTERIOR IMPROVEMENTS TO FINISH OUT THE BUILDING. The CUP 3 building (B39) will be located south of the new B51 R&D Expansion Project. This permit is for STRUCTURAL ONLY FOR BUILDING AND UTILITY TRESTLE FOOTINGS, FOUNDATIONS AND STRUCTURAL STEEL COMPONENTS OF THE TOTAL DESIGN. The proposed new CUP B39 is 68,000 square feet with a 9,319 sq. ft. equipment platform and is type IIB construction. Building occupancy groups consist of F1, H3, and H4. All work per the approved plans and attached engineering. Special inspections are required. This building is fully fire sprinklered for area increase. CDM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection10/10/201910/11/201910/11/2019PCANC
DetailsJim Page
Cancelled per conversation with poiunt of contact.

Dillon Phone #: ###-####
BLD-Final10/11/201910/11/201910/11/2019PPASS
DetailsJim Storey
no card on site
Print Occupancy Form  10/11/2019 DONE
Permanent Occupancy  10/11/2019 DONE
BLD-Final10/7/201910/9/201910/9/2019PPART
DetailsJim Storey
Dillion Phone #: ###-#### si and engineer signoff records on thumb drive with planreview// all c/n idems complet/ pending panic hardware at ion-chromatograph rm h4 occ.
BLD-Final9/19/20199/23/20199/23/2019APART
DetailsJim Storey
Dillon Phone #: ###-#### pipe smoke seal at link/ remove exit sign at stair/ gaurdrailling required on stair/ engineerring to aprove tank bolting to meet siezmic
BLD-Final8/16/20198/19/20198/21/2019PFAIL
DetailsJim Storey
Dillon Phone #: ###-#### 1 cn on building 39 and 1 c/n on tressel.
FIRE-Final Inspection8/14/20198/15/20198/15/2019APASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection complete.

dillon Phone #: ###-####
FIRE-Final Inspection8/1/20198/5/20198/5/2019AFAIL
DetailsJim Page
Provide city approved drawings as well as small documents from building permit fire code review.

Dillon Phone #: ###-####
BLD-Aging Inspection6/5/20196/5/20196/5/2019 PASS
DetailsJim Storey
wip
BLD-Other2/28/20193/1/20193/1/2019PPASS
DetailsJim Storey
For Ken Johnson, Firewall inspection. Phone #: ###-#### Inspection requested via web by Joel Hartman north membrane ok.
BLD-Wall cover1/22/20191/22/20191/22/2019PFAIL
DetailsJim Storey
Inspect beams and columns for drywall and screw patterns before taping, for Forte. Requested by Ken Johnson Phone #: ###-#### Inspection requested via web by Joel Hartman// provide ul listing for col and beam wrap framing and screw requirments. beam over 24 inches deep/ col screw over 12 oc.
BLD-Aging Inspection11/16/201811/16/201811/16/2018 PASS
DetailsJim Storey
work in progress
BLD-Other11/5/201811/6/201811/6/2018PPASS
DetailsJim Storey
Brian Smith with YMC is requesting a fire caulking inspection tomorrow at 1:00 PM. For contact please see attached cell number. Phone #: ###-#### Inspection requested via web
by Joel Hartman// chilled h2o and gycole fire stopping west end of fire wall ok.
BLD-Other9/17/20189/18/20189/18/2018APASS
DetailsJim Storey
Fire caulking around 32" pipes GL-9. Contact will be Mike Glasgow, phone number above. Phone #: ###-#### Inspection requested via web by Joel Hartmanpipes fire backing ok pending 1/4 chalking.

BLD-Conference8/8/20188/8/20188/8/2018PPART
DetailsJim Storey
Jim, I set this up for Greg, he asked if you would give him a call when you got here. ###-#### Phone #: ###-#### Inspection requested via web by Joel Hartman hillti to revise listing for clearity of applacation.
BLD-Other8/3/20188/3/20188/3/2018AFAIL
DetailsJim Storey
added to previous c/n membrane penatration at struc colums/continuity of fire wall not complet end to end//duct and piping thur pentrations unprotected.
BLD-Ceiling Grid Inspection8/2/20188/2/20188/2/2018PFAIL
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Joel Hartman need access to vreify thru penatrations above ceilling grid//missing primitor clips at ele rm hall side.
BLD-Aging Inspection6/29/20186/29/20187/5/2018 PASS
DetailsJim Storey
wip no insp
BLD-Framing/Rough-in2/15/20182/15/20182/15/2018PPART
DetailsJim Storey
Ken Phone #: ###-#### rated wall center of building wip gyp screw pick up base plate/butts/ ele back to back need fire stopping
BLD-Framing/Rough-in1/26/20181/29/20181/29/2018APASS
DetailsJim Storey
Ken Phone #: ###-#### exterior framing ok/ interior framing wip
BLD-Framing/Rough-in1/26/20181/26/20181/26/2018PDEFR
DetailsJim Storey
Ken Phone #: ###-#### out of time
BLD-Framing/Rough-in1/22/20181/22/20181/22/2018PPART
DetailsJim Storey
Ken Phone #: ###-#### west and north exterior walls ok //center 2hr framing wip
BLD-Framing/Rough-in1/2/20181/3/20181/3/2018APART
DetailsJim Storey
Ken Phone #: ###-#### neast end interior stud to track missig
BLD-Other1/2/20181/2/20181/2/2018PCANC
DetailsDave Hannah
Ken Phone #: ###-####
BLD-Framing/Rough-in1/2/20181/2/20181/2/2018PDEFR
DetailsDave Hannah
Ken Phone #: ###-####
BLD-Framing/Rough-in12/26/201712/27/201712/27/2017APASS
DetailsJim Storey
Ken Phone #: ###-#### exterior wall east side/ south half ok clips and stud framing
Fees Due Hold12/5/2017 12/15/2017 DONE
DetailsChristina Prado
CHANGE STATUS TO (ISS)  12/4/2017 DONE
DetailsChristina Prado
Status changed to ISS, fee payment to be made within 2 week timeline set up for Micron projects
Plan assigned to (CDM)9/19/20179/19/201711/29/2017 PASS
DetailsCarl D Madsen
Micron B39 CUP
Routing - PLAN CHECK11/27/2017 11/29/2017 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  11/29/2017 DONE
Permit Ready to Issue  11/29/2017 DONE
DO NO REISSUE PLAN MOD
NEED NEW C OF O SIGN OFF CARD, MUST PAY PRK FEES
BLD-Framing/Rough-in11/13/201711/14/201711/14/2017APASS
DetailsJim Storey
Ken Phone #: ###-#### west wall ok center to the south
Routing - PLAN CHECK9/25/2017 11/6/2017 FAIL
DetailsCarl D Madsen
BLD-Framing/Rough-in10/31/201710/31/201710/31/2017PPART
DetailsJim Storey
###-#### Ken all screws and clips ok to cover// missing base track stud screws thruout.
BLD-Foundation10/23/201710/24/201710/24/2017APART
DetailsJim Storey
north wall joel rebar nor instaled corect being fixed to be verified by si
BLD-Framing/Rough-in10/23/201710/24/201710/24/2017APASS
DetailsJim Storey
Ken Phone #: ###-#### east wall framing ok to cover.
Routing - PLUMBING10/23/2017 10/23/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
BLD-Framing/Rough-in10/13/201710/16/201710/16/2017APART
DetailsJim Storey
Ken Phone #: ###-#### reviewed clips and screws missing some noted and being pick up at this time south wall ok to cover
BLD-Framing/Rough-in10/5/201710/6/201710/6/2017APART
DetailsJim Storey
Ken Phone #: ###-#### area a west wall stud framing/ need info of knock out height from bearing at bottom/ all clips ans screws ok to cover
Routing - PLUMBING9/25/2017 10/2/2017 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - PLANNING Land Div9/25/2017 9/28/2017 PASS
DetailsTodd Tucker
Routing - MECHANICAL9/25/2017 9/27/2017 FAIL
DetailsTroy James
Routing - FIRE9/25/20179/25/20179/26/2017 PASS
DetailsScott Arellano
No change from previous approval.
Routing - PUBLIC WORKS9/25/2017 9/26/2017 PASS
DetailsRachael Beierle
Routing - PLANNING9/25/2017 9/26/2017 PASS
DetailsCody Riddle
Routing - Addressing9/25/2017 9/25/2017 PASS
DetailsDoug Chausow
Plan Modification Accepted  9/19/2017 DONE
plan mod in e plan accepted-to add the MEP scope the the permit-app is from Ron Hill and does not show new sheets that will be submitted-assoigned it to Carl M
BLD-Footing9/15/20179/18/20179/18/2017PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Joel Hartman rebar in progress si pending s 11 to sf
BLD-Other9/13/20179/14/20179/14/2017PCANC
DetailsJim Storey
rebar // Shane Brandon Phone #: ###-####
Issue PAID IN FULL permit  8/22/2017 DONE
DetailsChristina Prado
Inspection Record Card- Bld  8/22/2017 DONE
DetailsChristina Prado
Permit Ready to Issue  8/21/2017 DONE
DetailsChristina Prado
All requirements met
Plan assigned to (CDM)6/29/20176/29/20178/19/2017 PASS
DetailsCarl D Madsen
1st comp Micron CUP
Routing - PLAN CHECK8/16/2017 8/19/2017 PASS
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL8/16/2017 8/19/2017 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  8/19/2017 DONE
Routing Off Site - STRUCTURAL8/8/2017 8/12/2017 FAIL
DetailsCarl D Madsen
Routing - PLAN CHECK8/12/2017 8/12/2017 FAIL
DetailsCarl D Madsen
Failed pending structural
Routing Off Site - STRUCTURAL7/22/2017 8/2/2017 FAIL
DetailsCarl D Madsen
Route to Impact Fee Review7/18/20177/21/20178/1/2017 PASS
DetailsMarissa Taylor
Review requested for Commercial Permit
Routing - FIRE7/22/20177/22/20177/25/2017 PASS
DetailsScott Arellano
Attached Fire Code comments to plans. This review is only for structural and exterior Fire Access provisions.
Routing - Erosion and Sediment7/22/2017 7/25/2017 PASS
DetailsAndy J. Long
see ESC16-00242 for ESC coverage for all Micron activity around Fab 51 & CUP.
1st review completed  7/18/2017 FAIL
Routing - PLAN CHECK6/29/2017 7/18/2017 FAIL
DetailsCarl D Madsen
Routing Off Site - STRUCTURAL6/29/2017 7/18/2017 FAIL
DetailsCarl D Madsen
Routing - FIRE6/29/20176/29/20177/13/2017 FAIL
DetailsScott Arellano
Existing hydrant locations and any new hydrants need to be shown. Additionally building modifies existing roads/revised FD access needs to be shown.
Intake Approval  6/29/2017 PASS
Routing PW Drainage6/29/2017 6/29/2017 PASS
DetailsBrian Murphy
Routing PW Sewer Design6/29/2017 6/29/2017 PASS
DetailsKyle S. Rosenmeyer
Routing PW Environmental6/29/2017 6/29/2017 PASS
DetailsTerry Alber
Routing - PLANNING6/29/2017 6/29/2017 PASS
DetailsSue Cummings
O.K. as per Sarah S.
Routing - PLANNING Land Div6/29/2017 6/29/2017 PASS
DetailsTodd Tucker
Routing - Addressing6/29/2017 6/29/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS6/29/2017 6/29/2017 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment6/29/2017 6/29/2017 FAIL
DetailsAndy J. Long
Application received  6/14/2017 DONE
Application submitted via PDS Online on Jun 14 2017 4:18PM
Routing - PLAN CHECK7/22/2017   FAIL
DetailsCarl D Madsen
Failed pending structural