Third Notice | | 8/12/2018 | 10/11/2018 | | DONE |
|
|
|
mailed 10-12-18
|
Second Notice | | 7/21/2018 | 8/7/2018 | | DONE |
|
|
|
mailed 8-10-18
|
First Notice | | 7/2/2018 | 7/11/2018 | | DONE |
|
|
|
mailed 7-12-18
|
Permanent Occupancy | | | 6/22/2018 | | DONE |
|
|
|
|
BLD-Final | 6/20/2018 | 6/21/2018 | 6/21/2018 | P | PASS |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
BLD-Final | 6/5/2018 | 6/7/2018 | 6/7/2018 | A | PART |
Jim Sly
|
|
|
Steve Phone #: ###-#### Temp OK.
|
FIRE-Final Inspection | 6/5/2018 | 6/6/2018 | 6/6/2018 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given until the permanant building designations have been mounted (A, B, C...ect.). The west most fire hydrant is being rotated per the fie captain.
Steve Phone #: ###-####
|
PubWorks Occupancy Approval | 6/6/2018 | 6/6/2018 | 6/6/2018 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 6/1/2018 | 6/4/2018 | 6/4/2018 | P | FAIL |
Troy Cobbley
|
|
|
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)
Steve Phone #: ###-####
|
Zoning Approval | 5/30/2018 | 5/30/2018 | 5/30/2018 | | PASS |
Sarah Schafer
|
|
|
|
Meeting | | | 4/27/2018 | | DONE |
|
|
|
Per attached email from K Reed - name updated to add DBA
|
BLD-Foundation | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | PASS |
Jim Sly
|
|
|
requ 2:30 // frost wall insp // Steve Phone #: ###-#### OK pending STRATA special inspection, tests and approvals.
|
Issue PAID IN FULL permit | | | 9/22/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/22/2017 | | DONE |
|
|
|
|
Plan assigned to (JG) | 6/21/2017 | 6/21/2017 | 9/20/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 7/12 Cole Storage BLDG M
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/20/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/20/2017 | | DONE |
Christina Prado
|
|
|
Need:
GC Form
Revised Certificate of Value
DO NOT ISSUE WITH BLD17-01937, BLD17-02006 through 02018
|
Routing - FIRE | 9/16/2017 | 9/16/2017 | 9/19/2017 | | PASS |
Scott Arellano
|
|
|
IFC Review comments attached to BLD17-01937
|
Routing Off Site - STRUCTURAL | 9/16/2017 | | 9/16/2017 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers Chris Holladay
|
Routing PW Drainage | 9/16/2017 | | 9/16/2017 | | PASS |
Brian Murphy
|
|
|
signed off in ePlan by PW Drainage Brian Murphy
|
Route to Impact Fee Review | 7/19/2017 | 7/22/2017 | 7/21/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing Off Site - STRUCTURAL | 6/21/2017 | | 7/19/2017 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Chris Holladay
|
Routing PW Drainage | 6/21/2017 | | 7/19/2017 | | FAIL |
Brian Murphy
|
|
|
failed in ePlan by BGM
|
1st review completed | | | 7/19/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - Erosion and Sediment | 6/21/2017 | | 7/19/2017 | | PASS |
Andy J. Long
|
|
|
signed of in ePlan by MMJ
|
Routing - PLAN CHECK | 6/21/2017 | | 7/19/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 6/21/2017 | | 7/19/2017 | | PASS |
Troy James
|
|
|
no mech in bldg M
|
Routing - PLANNING | 6/21/2017 | | 7/13/2017 | | PASS |
Leon Letson
|
|
|
|
Routing - PLANNING Land Div | 6/21/2017 | | 7/13/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Design Review | 6/21/2017 | | 7/10/2017 | | PASS |
Sarah Schafer
|
|
|
|
Routing - PLUMBING | 6/21/2017 | | 6/26/2017 | | PASS |
Bill VanDegrift
|
|
|
|
Routing - FIRE | 6/21/2017 | 6/21/2017 | 6/21/2017 | | FAIL |
Scott Arellano
|
|
|
Report attached to BLD17-01937 and emailed to architect
|
Routing - PUBLIC WORKS | 6/21/2017 | | 6/21/2017 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 6/21/2017 | | |
|
|
|
|
Routing - Addressing | 6/21/2017 | | 6/21/2017 | | PASS |
Laura Hunter
|
|
|
Address corrected to 7455 W Swift Ln per change of address on 5/26/17
|
Application received | | 6/20/2017 | | | |
|
|
|
|
Application received | | 6/20/2017 | | | |
|
|
|
|