Elevation Cert Rec'd-Final | | | 1/8/2020 | | DONE |
|
|
|
|
BLD-Final | 1/29/2019 | 1/30/2019 | 1/30/2019 | A | PASS |
Tony Young
|
|
|
Please call ahead for access - Jeffrey Phone #: ###-####// c of o issued,, blower door is 3.9
|
DOC - Permit Finaled | 1/30/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Other | 1/29/2019 | 1/29/2019 | 1/29/2019 | P | DONE |
Bob Archibald
|
|
|
Received recorded easment
|
Elevation Cert Rec'd-Final | | | 1/10/2019 | | |
|
|
|
|
BLD-Final | 1/9/2019 | 1/9/2019 | 1/9/2019 | P | NR |
Tony Young
|
|
|
Doug Phone #: ###-####,, needs trades passed,, sewer line issues,, c/n posted to resolve sewer line easment or reroute adjacent property owners sewer line with approvals from under this home. will also need a blower door test result
|
BLD-Energy code compliance | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Dave Hannah
|
|
|
Rob Phone #: ###-####
|
BLD-Framing/Rough-in | 6/4/2018 | 6/5/2018 | 6/5/2018 | A | PASS |
Tony Young
|
|
|
Rob Phone #: ###-####,, front house meets plans now,, ok to insulate
|
BLD-Conference | 6/4/2018 | 6/4/2018 | 6/4/2018 | P | FAIL |
Tony Young
|
|
|
Rob Phone #: ###-####,, met with contractor,, he had reviewed plans,, needs to get approval from olan review and get ok as built.. remove or get approval as built or remove 220 in kitchen upstairs
|
BLD-Framing/Rough-in | 6/1/2018 | 6/4/2018 | 6/4/2018 | A | FAIL |
Tony Young
|
|
|
Rob Phone #: ###-####,, no plans,, needs to remove 220 v circuit all the way out unless approved by the plan review
|
Routing Walk-In (BLD) | 6/4/2018 | 6/4/2018 | 6/4/2018 | P | PASS |
Josh Bogle
|
|
|
PLAN MOD - EASY/QUICK - NO FEE
|
Override - Parcel Holds | 6/4/2018 | 1/1/1900 | 6/4/2018 | | |
|
|
|
not adu
|
Elevation Cert Rec'd-Midconst | | | 5/23/2018 | | DONE |
|
|
|
|
BLD-Conference | 5/16/2018 | 5/17/2018 | 5/17/2018 | A | FAIL |
Tony Young
|
|
|
Rob Phone #: ###-####,, walk through only,, need plans,, elevation cert,, take out added ADU components
|
BLD-Framing/Rough-in | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | FAIL |
Tony Young
|
|
|
- Rob Phone #: ###-####,, need city set of plans
|
Override - Parcel Holds | 5/9/2018 | 1/1/1900 | 5/9/2018 | | |
|
|
|
not for adu
|
BLD-Conference | 5/4/2018 | 5/4/2018 | 5/7/2018 | P | FAIL |
Brandon Shaw
|
|
|
Need to provide city approved set of plans
|
BLD-Framing/Rough-in | 4/27/2018 | 4/30/2018 | 4/30/2018 | A | FAIL |
Tony Young
|
|
|
Rob Phone #: ###-####,, need the reviewed plans on site
|
BLD-Framing/Rough-in | 4/24/2018 | 4/24/2018 | 4/24/2018 | P | FAIL |
Tony Young
|
|
|
Rob Phone #: ###-####,, need plans and truss engineering,, need to verify how many dwelling units are under one roof
|
BLD-Framing/Rough-in | 4/17/2018 | 4/18/2018 | 4/18/2018 | A | FAIL |
Tony Young
|
|
|
Rob Phone #: ###-####,, need plans
|
Plan Modification Accepted | | | 4/11/2018 | | DONE |
|
|
|
revised acca report
|
Routing - MECHANICAL | 4/11/2018 | | 4/11/2018 | | PASS |
Chad Schwendiman
|
|
|
revised acca report
|
BLD-Wall Bracing | 3/19/2018 | 3/20/2018 | 3/20/2018 | P | PEND |
Brandon Shaw
|
|
|
Work in progress Walked through with framer- Hold down, edge, and field nailing to be fixed by framing inspection
|
BLD-Wall Bracing | 3/19/2018 | 3/19/2018 | 3/19/2018 | P | NR |
Tony Young
|
|
|
Rob Phone #: ###-####,, see paint marks
|
BLD-Foundation | 12/6/2017 | 12/6/2017 | 12/6/2017 | P | FAIL |
Jim Storey
|
|
|
James Phone #: ###-#### placed with out insp.
|
BLD-Footing | 12/5/2017 | 12/5/2017 | 12/5/2017 | P | PASS |
Tony Young
|
|
|
James Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/12/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 9/7/2017 | | |
|
|
|
|
Routing Walk-In (BLD) | 9/7/2017 | 9/7/2017 | 9/7/2017 | A | DONE |
Josh Bogle
|
|
|
|
Plan assigned to (JAB) Josh | 7/26/2017 | 7/26/2017 | 9/7/2017 | | PASS |
Josh Bogle
|
|
|
1st done - corrections required, floor joists, foundation/floor details to match flood elevations
|
Routing - Addressing | 6/21/2017 | | 9/7/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLAN CHECK | 9/7/2017 | | 9/7/2017 | | PASS |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2017 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 9/7/2017 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Routing - PLAN CHECK | 8/17/2017 | | 8/17/2017 | | FAIL |
Josh Bogle
|
|
|
|
Elevation Cert Rec'd-Prelim | | | 8/15/2017 | | DONE |
|
|
|
|
Routing PW Flood Plain | 8/15/2017 | | 8/15/2017 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLANNING | 8/10/2017 | | 8/10/2017 | | PASS |
Nicolette Womack
|
|
|
ROS17-00049 Finalized
|
Plan resubmittals received | | | 7/31/2017 | | DONE |
|
|
|
received the floor plain cert-scanned it in and emailed to to BJM & JAB-customer said she also gave a copy to JCT
|
Plan assigned to (BJM) | 6/21/2017 | 6/21/2017 | 7/26/2017 | | DEFR |
Brian McGowan
|
|
|
7/04 sfd L2 ePlan
|
Routing - PLAN CHECK | 6/21/2017 | | 7/26/2017 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 7/26/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing PW Flood Plain | 6/21/2017 | | 6/28/2017 | | FAIL |
Jason C. Taylor
|
|
|
see changemarks in eplan. JCT
|
Route to Impact Fee Review | 6/21/2017 | 6/24/2017 | 6/22/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 6/21/2017 | | 6/22/2017 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 6/21/2017 | | 6/22/2017 | | FAIL |
Sue Cummings
|
|
|
Need proof this is a legal lot, created prior to 1965
|
Routing - PUBLIC WORKS | 6/21/2017 | | 6/21/2017 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 6/21/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/21/2017 | | DONE |
|
|
|
|
Application received | | | 6/20/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 20 2017 4:06PM
|