BLD-Final | 9/29/2017 | 9/29/2017 | 9/29/2017 | P | PASS |
Brandon Shaw
|
|
|
Final for the deck we added. Please call when you are headed that way. Know one is home so I will let you in Thank you Phone #: ###-#### Inspection requested via web by Jeff Ware
|
DOC - Permit Finaled | 9/29/2017 | 9/29/2017 | 9/29/2017 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 9/26/2017 | 9/26/2017 | 9/26/2017 | | DONE |
Melissa Jannusch
|
|
|
No public works inspection needed. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 9/25/2017 | 9/25/2017 | 9/25/2017 | P | NR |
Tony Young
|
|
|
Please call before you head over this is the final for a deck on a private residence and there is no one home I will have to meet you to provide access thank you Phone #: ###-#### Inspection requested via web by Jeff Ware/// needs hillside passed 1st
|
BLD-Framing/Rough-in | 8/17/2017 | 8/17/2017 | 8/17/2017 | P | PART |
Brandon Shaw
|
|
|
Ledger anchorage and flashing OK, call for final after completion
|
BLD-Footing | 7/28/2017 | 7/31/2017 | 8/1/2017 | A | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Jeff Ware
|
BLD-Footing | 7/31/2017 | 8/1/2017 | 8/1/2017 | A | PASS |
Dave Hannah
|
|
|
Inspection requested via web by Jeff Ware
|
PubWorks Subgrade Approval | 8/1/2017 | 8/1/2017 | 8/1/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Plan assigned to (JAB) Josh | 6/21/2017 | 6/21/2017 | 7/24/2017 | | PASS |
Josh Bogle
|
|
|
1st. done - needs Hillside engineering
|
Routing - PLAN CHECK | 7/20/2017 | | 7/24/2017 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 7/24/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/24/2017 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/24/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 7/24/2017 | | DONE |
|
|
|
All Met
|
Telephone call | | | 7/24/2017 | | DONE |
|
|
|
Spoke with Jeff informing him that this permit is ready and the fee amount due for issuance
|
Issue PAID IN FULL permit | | | 7/24/2017 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 7/20/2017 | | 7/21/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing Walk-In (Zoning) | 6/21/2017 | 6/21/2017 | 6/21/2017 | A | DONE |
Sue Cummings
|
|
|
|
Routing Walk-In (BLD) | 6/21/2017 | 6/21/2017 | 6/21/2017 | A | FAIL |
Josh Bogle
|
|
|
moved to level 2 for Hillside review JAB
|
Routing PW Grading-Hillside | 6/21/2017 | | 6/21/2017 | | FAIL |
Jason C. Taylor
|
|
|
Jason not reviewing, pending recieving engineering JAB
|
1st review completed | | | 6/21/2017 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 6/21/2017 | | | |
|
|
|
|