Permit Information
Permit NumberBLD17-02040
StatusUnder Review
Name SILVER CREEK HOMES
Site Address 2332 N CLIFFVIEW WAY
Project NameMiller Residence - Addition
Customer Number 
ePlanReviewYes
Description
### Actual scope of work as of 5/12/20 = enclosing rear covered patio and converting 600sq' of garage to add +/- 1,000sq' of living space that includes a gym and a hallway. Scope includes reconfiguring the upstairs bedrooms (removing a full bath), reconfiguring the Mother-in-law suite, adding a covered entry, and landscape retaining walls. JAB### Hillside/WUI *WUI ZONE A- Class "A" Roof Required. Special Inspections are required. MODIFICATION - REAR HALLWAY CHANGING FROM SLAB-ON-GRADE TO FRAMED FLOOR 11/8/19 **jab** **MODIFICATION 12/7/17 TO INCLUDE CONCRETE RETAINING WALLS jab** This structure is to be fully fire sprinklered in accordance with NFPA 13D. A separate fire sprinkler permit will be required. ***RDP***
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor 208-608-7171.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Jason Taylor 208-608-7171.
* Permit for a 4,064sq' addtion, to include: new workout space, game room and basket ball gym; new 2nd story area with 3 bedrooms, 2 bathrooms, an office & a movie room, and 1,125sq of 2nd level outdoor patio. Additionally there will be work to the existing Master Bathroom, Whiskey Room & Porte Cochere. All work per plans, notes, engineering, & local code. Separate electrical, plumbing, mechanical, & sprinkler permits required. **RDP**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Routing - PLANNING8/13/2020 8/13/2020 PASS
DetailsSue Cummings
Wall can not be over 6' in the rear setback
BLD-Footing8/11/20208/11/20208/11/2020PPEND
DetailsDave Hannah
screened - all outside work // Monica Phone #: ###-#### ok after gro tech sign off and spec inspection sign off
Plan Modification Accepted  8/11/2020 DONE
less of a porte cochere and more of a pergola now with a much more simplified design
PubWorks Subgrade Approval5/21/20205/21/20205/21/2020 DONE
DetailsMelissa Jannusch
Footing for garage addition, footing extension at line 1 from 9-10, retaining wall, and pool vault.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
BLD-Framing/Rough-in5/15/20205/18/20205/18/2020APART
DetailsTony Young
Monica Phone #: ###-####/ new headers in garage,, ok pending welding and structure approval from engineer// strap plates
BLD-Footing5/15/20205/18/20205/18/2020APART
DetailsTony Young
Monica Phone #: ###-####// foundation from a prior pour// work in progress
Telephone call  5/15/2020 DONE
spoke with contractor that fee was missed
CHANGE STATUS TO (ISS)  5/15/2020 DONE
OVERRIDE  5/12/2020  
Plan assigned to (JAB) Josh1/15/20201/15/20205/12/2020 PASS
DetailsJosh Bogle
01/21 modification, paper - 1st done
Routing PW Grading-Hillside5/4/2020 5/12/2020 PASS
DetailsMelissa Jannusch
Plan mod approved.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
Routing - PLAN CHECK5/4/2020 5/12/2020 PASS
DetailsJosh Bogle
5hrs Plan Review
Permit Ready to Issue  5/12/2020 DONE

PLAN MOD
Routing - PLANNING5/4/2020 5/11/2020 PASS
DetailsNicolette Womack
Plan Reviewer's activity  5/4/2020 DONE
DetailsJosh Bogle
accpeted and routed resubmittal
Routing - PLAN CHECK4/14/2020 4/24/2020 FAIL
DetailsJosh Bogle
see e-mail to Steven
Routing - PLANNING4/14/2020 4/21/2020 FAIL
DetailsNicolette Womack
As per PW Grading Requirements
Routing PW Grading-Hillside4/14/2020 4/21/2020 FAIL
DetailsMelissa Jannusch
See changemarks in ePlan. Additional documents needed.
Routing - FIRE4/14/20204/14/20204/20/2020 PASS
DetailsLee G Meredith
Plan Mod LGM

Current configuration does not require a fire sprinkler system.
Routing - PUBLIC WORKS4/14/2020 4/14/2020 PASS
DetailsCandy A. Nichols
PLAN MOD-NO NEW PLUMBING
Routing PW Grading-Hillside2/18/2020 2/18/2020 FAIL
DetailsMelissa Jannusch
1. Provide top and bottom of wall elevations for the basketball court walls (walls will need to be less than 6’ total exposed height within the setbacks. If the walls are closer than 5’ horizontal distance the exposed heights together need to be less than 6’)
2. Show setback lines on grading and drainage plans
3. Provide block wall engineering. Please account for both walls as the walls are close enough to create a surcharge. Also provide a statement from the structural engineer on the state of the existing boulder wall and that it will not be impacted by the new walls. If sections of existing boulder wall are to be rebuilt boulder wall engineering will be needed.
4. Show height of existing retaining wall
BLD-Energy code compliance2/12/20202/13/20202/13/2020APART
DetailsTony Young
monica Phone #: ###-####,, back hall area
BLD-Framing/Rough-in2/12/20202/12/20202/12/2020PPART
DetailsTony Young
Monica- inspection is for back hall way per GC plan mod has nothing to do with this inspection Phone #: ###-####,, ok to insulate back wall area,, east side
Routing - PLAN CHECK1/15/2020 2/12/2020 FAIL
DetailsJosh Bogle
see e-mail to Monica & Steven
Routing Walk-In (BLD)2/11/20202/11/20202/11/2020PFAIL
DetailsJosh Bogle
talked about stuff
Routing - FIRE1/15/20201/15/20202/6/2020 FAIL
DetailsLee G Meredith
Plan mod SFH paper

No changes have been submitted that affect the most most recent review. Partial sprinklers are still required, as previously noted.
Routing - PLANNING1/15/2020 1/27/2020 FAIL
DetailsNicolette Womack
Need grading and drainage plans
Routing PW Grading-Hillside1/21/2020 1/21/2020 FAIL
DetailsMelissa Jannusch
PLAN MOD. Provide updated grading and drainage sheets. MMJ
Plan Modification Accepted  1/15/2020 DONE
Plan mod. 2 sets of the following: a0.01, a1.11, a1.21, a2.01, a2.02, a2.03, a2.09, a2.10, a2.11, a2,12, a2.31, a2.32, a2.40, a2.41, a2.51, a2.52, a2.53, a3.11, a3.12, a3.21, a3.22, a4.11, a5.11, a5.12, a5.13, a6.11, a6.12, a6.13, s0.01, s1.01, s1.02, s2.09, s2.11, s2.52, s3.00, s4.01, s5.01, s6.01,
BLD-Foundation1/8/20201/8/20201/8/2020PPART
DetailsTony Young
monica - rebar inspection Phone #: ###-####,, double furr out wall ok per engineering,, ok after cleaning out debris
BLD-Foundation11/18/201911/18/201911/18/2019PPART
DetailsTony Young
mONICA- FOUNDATION WALL INSP Phone #: ###-####,, porch close in wall,, ok
BLD-Footing11/13/201911/13/201911/15/2019PDONE
DetailsTony Young
Monica Phone #: ###-####,, ok now
BLD-Footing11/15/201911/15/201911/15/2019APASS
DetailsTony Young
Monica Phone #: ###-####
PubWorks Subgrade Approval11/15/201911/15/201911/15/2019 DONE
DetailsMelissa Jannusch
PATIO COVER: A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Footing11/12/201911/13/201911/13/2019APEND
DetailsTony Young
Monica Phone #: ###-####,, needs soils approval 1st
BLD-Footing11/12/201911/12/201911/12/2019PPEND
DetailsTony Young
Monica Phone #: ###-####,, needs soils approval 1st
OVERRIDE  11/8/2019  
CHANGE STATUS TO (ISS)  11/8/2019 DONE
plan mod approved
Routing - PLAN CHECK11/8/2019 11/8/2019 PASS
DetailsJosh Bogle
Mod - slab-on-grade to framed floor - rear hall
Case Summary (BLD)  11/8/2019 DONE
DetailsJosh Bogle
min. 1hr Plan Mod fee
Permit Ready to Issue  11/8/2019 DONE
plan mod
BLD-Aging Inspection10/23/201910/23/201910/29/2019 PEND
DetailsTony Young
BLD-Aging Inspection10/22/201910/22/201910/29/2019 PEND
DetailsTony Young
BLD-Aging Inspection6/7/20196/7/20196/10/2019 PASS
DetailsTony Young
BLD-Footing1/22/20191/24/20191/24/2019PPASS
DetailsBrandon Shaw
Work in progress
BLD-Foundation1/15/20191/16/20191/16/2019PPART
DetailsTony Young
rebar // Monica Phone #: ###-####,, retaining walls,, work in progress,,
BLD-Footing12/17/201812/19/201812/20/2018PPART
DetailsBrandon Shaw
Partial footings- steps to be poured at a later date
BLD-Foundation11/20/201811/26/201811/26/2018APART
DetailsTony Young
Monica-retaining wall and pool vault wall Phone #: ###-####,, work in progress,, ok
PubWorks Subgrade Approval11/23/201811/23/201811/23/2018 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

BLD-Other11/20/201811/20/201811/20/2018PNR
DetailsTony Young
Monica-retaining wall and pool vault wall Phone #: ###-####,, still needs soils approval
CHANGE STATUS TO (ISS)  11/20/2018 DONE
OVERRIDE  11/15/2018  
Routing Walk-In (BLD)11/15/201811/15/201811/15/2018ADONE
DetailsJosh Bogle
customer in office to talk to Josh
Routing - PLAN CHECK11/15/2018 11/15/2018 PASS
DetailsJosh Bogle
Applicant changed their mind about the Modification submitted 6/12/18 and is returning to the scopef of work previously permitted. Plan review fees still due, project valuation reverts to previous value.
PLANS/APPL TAKEN TO FRONT DESK  11/15/2018 DONE
DetailsJosh Bogle
Plan Review fees due
Permit Ready to Issue  11/15/2018 DONE
PLAN MOD change status to ISS. Plan mod submitted 6/11/18 was cancelled but still owe plan check and fire plan check fees since reviews were completed for the plan modification and the plan mod was in ready status.
BLD-Footing11/6/201811/6/201811/6/2018PPART
DetailsTony Young
Monica-partial footing-would like as late as possible Phone #: ###-####,, east footing for pool vault and retaining wall ok,, pending soils approval
OVERRIDE  7/12/2018  
Plan assigned to (RDP)6/12/20186/12/20187/12/2018 DONE
DetailsRob Patrick
Paper: Transferred from Josh.
Routing - FIRE6/11/20186/11/20187/12/2018 PASS
DetailsTim Frost
Plan Mod SFH paper
Routing - PLAN CHECK6/11/2018 7/12/2018 PASS
DetailsRob Patrick
Telephone call  7/12/2018 DONE
called Monica to let know plan mod is done and how much is owed
Case Summary (BLD)  7/12/2018 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  7/12/2018 DONE
DetailsRob Patrick
Permit Ready to Issue  7/12/2018 DONE
plan mod please do not re issue-plans are on top of the counter because they are too big to fit in drawer for res
Routing PW Grading-Hillside7/11/2018 7/11/2018 PASS
DetailsJason C. Taylor

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Jason Taylor ###-####.
Plan Reviewer's activity  7/5/2018  
DetailsRob Patrick
Delivered to Morgan in PW Grading for re-review of Civil package.
Routing - Addressing7/5/2018 7/5/2018 PASS
DetailsDoug Chausow
Plan resubmittals received  7/3/2018 DONE
resubmittals on plan mod received. Received two copies of architect response, civil eng. resopnse, structural response, plan sheets a0.01, a1.11, a1.21, a3.13, a3.14, S2.51, C1, C2, L1.00, L1.01 thru L1.14; taken to Rob Patrick
Routing - MECHANICAL6/29/2018 6/29/2018 PASS
DetailsTroy James
Routing - MECHANICAL6/11/2018 6/29/2018 FAIL
DetailsTroy James
Need revised acca approved report. Left message with adam brown
Plan Reviewer's activity  6/21/2018  
Delivered plan set to Troy for review.
Routing - PUBLIC WORKS6/15/2018 6/18/2018 PASS
DetailsMorgan Webb
Routing PW Grading-Hillside6/11/2018 6/15/2018 PASS
DetailsMelissa Jannusch
Plan Modification approved.

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
BLD-Framing/Rough-in6/13/20186/14/20186/14/2018APART
DetailsTony Young
master bathroom ok to cover now,, fireplace will come out
BLD-Framing/Rough-in6/13/20186/13/20186/13/2018PNR
DetailsTony Young
Monica Phone #: ###-####, master bath,, needs mech approval,, needs clearance on fireplace flue
Plan assigned to (JAB) Josh6/11/20186/11/20186/12/2018 DEFR
DetailsJosh Bogle
Routing - PLANNING6/12/2018 6/12/2018 PASS
DetailsNicolette Womack
Routing Walk-In (BLD)6/11/20186/11/20186/11/2018PPASS
DetailsJosh Bogle
taken in - routed - assigned to RDP
Plan Modification Accepted  6/11/2018 DONE
3 copies each of structural calculations, index and complete plans set
Issue PAID IN FULL permit  6/7/2018 DONE
Inspection Record Card- Bld  6/7/2018 DONE
Telephone call  6/6/2018 DONE
Left message for Monica informing her that this permit is going to expire in 10 days and what they need to do to request an extension
Expiration Notice5/18/20186/8/20185/18/2018 DONE
DetailsBrittany Hill
OVERRIDE  4/12/2018  
Override - Parcel Holds  4/12/2018  
Telephone call  12/14/2017 DONE
Spoke with Monica informing her that this permit is going to expire in 4 days and that she is welcom to send in a request for a 180 day extension. She stated she thought the permit was good for a year. Informed her it's good for 6 months and when it's issued it's good for a year. Gave her the info to send in a request
Override - Parcel Holds  12/14/2017  
Extend Review Timeline  12/14/2017 DONE
1st Approved 180 day extension per Adele. see documents
Plan assigned to (JAB) Josh11/29/201711/29/201712/7/2017 PASS
DetailsJosh Bogle
Plan resubmittals received  12/7/2017 DONE
One copy of Structural Cals, one copy of sheets C1, C2, L1.00, L1.01, L1.02, L1.03, L1.04, L1.05, L1.06, L1.07, L1.08, L1.09, L1.10, L1.11, L1.12, L1.14, S7.01 site structure details, S7.01 site structure general notes and S7.02. TAKEN TO JOSH B
Routing - PLAN CHECK12/7/2017 12/7/2017 PASS
DetailsJosh Bogle
Case Summary (BLD)  12/7/2017 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  12/7/2017 DONE
DetailsJosh Bogle
Permit Ready to Issue  12/7/2017 DONE
DetailsChristina Prado
Per Modification approval
Routing - Erosion and Sediment12/1/2017 12/6/2017 PASS
DetailsMichael Zawacki
Changes didn't require anything additional in the ESCP.
Routing PW Grading-Hillside12/1/2017 12/4/2017 PASS
DetailsJason C. Taylor
Plan resubmittals received  11/29/2017 DONE
One copy of structural Calcs and one copy of sheets a0.01, C1,C2, L1.00, L1.01, L1.02, L1.03, L1.04, L1.05, L1.06, L1.07, L1.08, L1.09, L1.10, L1.11, L1.12, L1.14, S7.01 (2 COPIES) and S7.02 taken to Josh
Expiration Notice11/27/201712/18/201711/27/2017 DONE
DetailsBrittany Hill
OVERRIDE  10/16/2017  
Plan assigned to (JAB) Josh10/11/201710/11/201710/16/2017 PASS
DetailsJosh Bogle
Routing - PLAN CHECK10/16/2017 10/16/2017 PASS
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  10/16/2017 DONE
DetailsJosh Bogle
Modification - pool vault & gym roof JAB
Permit Ready to Issue  10/16/2017 DONE
plans on counter above drawer
Routing - PLANNING10/12/2017 10/12/2017 PASS
DetailsColleen T Carroll
Wasll can not be over 6' in the rear setback
Plan resubmittals received  10/12/2017 DONE
Three sheets of C2 taken to Josh B
Plan Modification Accepted  10/11/2017 DONE
DetailsChristina Prado
Received three sets of plan sheets marked a1.11, a1.21, a2.09, a2.11, a2.12, a2.41, a3.11, a3.12, a3.13, a3.21, a4.11, a4.21, a4.22, a4.25, a6.11, s2.12 & s2.51, as well as three sets revised structural calcs. Plans stamped and taken to JAB for review
OVERRIDE  9/7/2017  
Routing - FIRE9/6/20179/6/20179/7/2017 PASS
DetailsScott Arellano
Attached updated plan review report to case and plans.
Plan assigned to (JAB) Josh7/13/20177/13/20179/7/2017 PASS
DetailsJosh Bogle
1st done - need more info, see e-mail 8-10
Routing - PLAN CHECK7/13/2017 9/7/2017 PASS
DetailsJosh Bogle
Case Summary (BLD)  9/7/2017 DONE
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  9/7/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/7/2017 DONE
DetailsJosh Bogle
ESC yes - Energy yes
Permit Ready to Issue  9/7/2017 DONE
Inspection Record Card- Bld  9/7/2017 DONE
Telephone call  9/7/2017 DONE
called Monica to lt know prmit is ready and how much is owed-left message on her hone
Plan resubmittals received  8/28/2017 DONE
Two copies of Structural Calculations, three copies of sheets a0.01, a1.10, a1.11, a2.01, a2.02, a2.03, a2.09, a2.11, a2.12, a2.13, a2.14, a2.15, a2.31, a2.32, a2.41, a2.42, a3.11, a3.12, a3.13, a3.14, a3.21, a4.11, a4.12, a4.13, a4.14, a4.21, a4.22, a4.23, a4.24, a4.25, a5.11, a5.12, a6.11, a6.13, a9.10, a9.11, a9.12, a9.13, s0.01, s1.01, s1.02, s2.09, s2.11, s2.12, s2.13, s2.15, s2.16, s2.51, s2.52, s2.53, s3.01, s4.01, s4.02, s5.01, s5.02, s6.01, s6.02,s6.03, s6.04, s6.05, m2.11, m2.12, e1.00, e2.03.1, e2.05 and e2.11 Taken to Josh B
Routing - PLAN CHECK8/10/2017 8/10/2017 FAIL
DetailsJosh Bogle
Routing - PLAN CHECK8/1/2017 8/9/2017 FAIL
DetailsJosh Bogle
preliminary look at plans to see what info might be missing JAB
Plan resubmittals received  8/8/2017 DONE
One copy of Statement of Special Inspections, three copies of ICC-ES Report and three copies of sheets a0.01, a2.01, a2.02, a2.11, a2.12, a2.13,a2.42, a4.12, a4.13 and a6.11. Taken to Josh G
Routing - PUBLIC WORKS7/31/2017 8/1/2017 PASS
DetailsRachael Beierle
Routing PW Grading-Hillside7/26/2017 7/31/2017 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Routing - Erosion and Sediment7/25/2017 7/27/2017 PASS
DetailsAndy J. Long
ESC plan approved. Designated RP provided. Site preparation inspection required.
Routing - MECHANICAL7/13/2017 7/25/2017 PASS
DetailsTroy James
See plans for duct and equipment. Elite software design with plans.
Routing PW Grading-Hillside7/13/2017 7/19/2017 FAIL
DetailsJason C. Taylor
Need geotech reports submitted (3 copies of each) prior to approval of project. JCT
Routing - FIRE7/19/2017 7/19/2017 FAIL
DetailsScott Arellano
Emailed applicant correction items. Attached plan review report to case.
Plan resubmittals received  7/19/2017 DONE
Three copies of Geotechnical Engineering Report and three copies of Geotechnical general notes (with letter attached). Taken to Josh B
Routing Walk-In (Zoning)7/13/20177/13/20177/13/2017PDONE
DetailsColleen T Carroll
Routing Walk-In (BLD)7/13/20177/13/20177/13/2017PFAIL
DetailsDavid Moser
Appeal period ends on 7-17-17 for CFH17-00020
Routing Walk-In (Zoning)6/21/20176/21/20176/21/2017PFAIL
DetailsJosh Bogle
CFH not yet approved
1st review completed  6/21/2017 FAIL
DetailsJosh Bogle
Plan assigned to (JAB) Josh8/11/20208/11/2020   
DetailsJosh Bogle
08/17 mod
Application received 6/21/2017   
Routing - PLAN CHECK8/13/2020    
DetailsJosh Bogle
Routing - PUBLIC WORKS1/15/2020   FAIL
SEE HILLSIDE FOR FAIL