BLD-Final | 7/18/2018 | 7/19/2018 | 7/19/2018 | P | PASS |
Jim Sly
|
|
|
Brock Phone #: ###-####
|
DOC - Permit Finaled | 7/19/2018 | 7/19/2018 | 7/19/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | FAIL |
Jim Sly
|
|
|
Brock Phone #: ###-#### CN posted
|
Zoning Approval | 6/20/2018 | 6/20/2018 | 6/20/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Inspection Record Card- Bld | | | 6/20/2018 | | DONE |
|
|
|
|
BLD-Final | 6/15/2018 | 6/18/2018 | 6/18/2018 | A | NR |
Mike Jordan
|
|
|
Brock Phone #: ###-####. Needs zoning final.
|
BLD-Framing/Rough-in | 5/15/2018 | 5/15/2018 | 5/15/2018 | P | PASS |
Jim Sly
|
|
|
Front porch
|
BLD-Framing/Rough-in | 2/9/2018 | 2/12/2018 | 2/12/2018 | A | PEND |
Jim Sly
|
|
|
Russel Phone #: ###-#### Stop work and parcel hold....Erosion.
|
BLD-Other | 11/30/2017 | 12/1/2017 | 12/1/2017 | A | PASS |
Jim Sly
|
|
|
structural connections // Scott Phone #: ###-#### Foundation and 1st story to 2nd story connections.
|
BLD-Foundation | 10/26/2017 | 10/26/2017 | 10/26/2017 | P | PASS |
Brandon Shaw
|
|
|
Garage stem wall
|
BLD-Footing | 10/20/2017 | 10/23/2017 | 10/23/2017 | A | PART |
Jim Sly
|
|
|
Travis Phone #: ###-#### Pour at own risk......Provide full sized plan.
|
BLD-Foundation | 9/21/2017 | 9/21/2017 | 9/22/2017 | P | PASS |
Jim Sly
|
|
|
Travis Phone #: ###-####
|
BLD-Footing | 9/14/2017 | 9/18/2017 | 9/18/2017 | A | PART |
Jim Sly
|
|
|
Tavis-pour time is 3:00 Phone #: ###-#### House only.....OK.
|
Place hold on job | 9/7/2017 | | 9/8/2017 | | DONE |
Brittany Hill
|
|
|
DO NOT ISSUE WITHOUT BLD17-02124, 02201 TO 02203
|
Issue PAID IN FULL permit | | | 9/8/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 9/7/2017 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 7/19/2017 | 7/19/2017 | 9/7/2017 | | PASS |
Josh Bogle
|
|
|
1st done - corrections required to porch bearing & foundations
|
Routing - PLAN CHECK | 9/7/2017 | | 9/7/2017 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/7/2017 | | DONE |
|
|
|
ALL MET
Need
GC Form - met
RP
|
Routing - PLAN CHECK | 8/16/2017 | | 8/16/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/16/2017 | | 8/16/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 8/11/2017 | | 8/11/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - Design Review | 8/4/2017 | | 8/4/2017 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00150
|
1st review completed | | | 7/25/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/19/2017 | | 7/25/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - Addressing | 7/19/2017 | | 7/20/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/19/2017 | | 7/19/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Design Review | 7/19/2017 | | 7/19/2017 | | FAIL |
Katelyn Menuge
|
|
|
Drawings okay-Need written approval from Idaho Power.
|
Intake Approval | | | 7/19/2017 | | PASS |
|
|
|
|
Route to Impact Fee Review | 7/3/2017 | 7/6/2017 | 7/4/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Intake Approval | | | 7/3/2017 | | FAIL |
|
|
|
need to record new parcel numbers for lots 31 & 32, with Ada County and and provide to Boise City before submitting for building permit; see Katelyn Menuge
|
Telephone call | | | 6/28/2017 | | DONE |
|
|
|
called Brock and left vm to call me back regarding submission of 4 buildings and missing items on plans.
|
Intake Approval | | | 6/28/2017 | | FAIL |
|
|
|
see changemarks in ePlan
|
Application received | | | 6/27/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 27 2017 3:46PM
|