Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD17-02141
StatusFinaled
Name MARK GUHO CONSTRUCTION COMPANY
Site Address 1636 S HADLEY AVE
Project NameBoise Skin Clinic
Customer Number 
ePlanReviewYes
Description
(BOISE SKIN CLINIC) (GRD17-00049) (BLD17-02820 FOUNDATION) (DRH17-00293) **(11/02/17 PLAN MODIFICATION TO REDUCE ROOF OVERHANG AT NORTH ELEVATION) Permit for the construction of a new 3,318 sq. ft., 1-story wood framed Type VB construction building with concrete slab for a new medical office. Grading and Foundation completed under previously issued permits. Special inspections required for Wood Construction, Soils, and EIFS per Form 310. Construction to be per the approved plans and the attached engineering. This building is not fire sprinklered. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  6/20/2018 DONE
First Notice 5/20/20186/11/2018 DONE
mailed 6-12
Permanent Occupancy  5/10/2018 DONE
Zoning Approval5/9/20185/9/20185/9/2018 PASS
DetailsKatelyn Menuge
Temporary Occupancy5/2/20187/31/20185/2/2018 DONE
DetailsCandy A. Nichols
Jason Blais ok'd 30 day extension on temp c of o
Telephone call  5/2/2018 DONE
emailed MJ about the temp c of o-he is going to email Jason Blais
BLD-Aging Inspection4/2/20184/2/20184/2/2018 PASS
DetailsMike Jordan
PubWorks Occupancy Approval2/5/20182/5/20182/5/2018 DONE
DetailsTiffany Lowery
BLD-Final1/31/20182/1/20182/1/2018APASS
DetailsMike Jordan
Rod Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once zoning signs perm.
Temporary Occupancy2/1/20185/2/20182/1/2018 DONE
DetailsChristina Prado
FIRE-Final Inspection1/30/20181/31/20181/31/2018APASS
DetailsTroy Cobbley
life safety passed

Rod Phone #: ###-####
FIRE-Final Inspection1/26/20181/29/20181/29/2018AFAIL
DetailsTroy Cobbley
Need small documents, need four emergency lights repaired, need address, need fire dept signage, need Grading permit inspected/signed off.

Rod Phone #: ###-####
FIRE-Final Inspection1/26/20181/26/20181/26/2018PCANC
DetailsTroy Cobbley
Canceled due to time constraints

Rod Phone #: ###-####
Zoning Approval Temp1/25/20181/25/20181/25/2018 DONE
DetailsKatelyn Menuge
Bond for Landscape and Exterior Paint- BND18-00016
Print Occupancy Form  1/25/2018  
BLD-Ceiling Grid Inspection1/16/20181/17/20181/17/2018APASS
DetailsMike Jordan
Rod Phone #: ###-####
BLD-Framing/Rough-in12/1/201712/1/201712/1/2017PPASS
DetailsMike Jordan
Rod Phone #: ###-####
CHANGE STATUS TO (ISS)  12/1/2017 DONE
(F) Reprint permit  12/1/2017 DONE
OVERRIDE  11/2/2017  
Plan assigned to (JAR)11/1/201711/1/201711/2/2017 DONE
DetailsJulie Romig
11/02 - Plan Mod Boise Skin Clinic
Routing - Design Review11/2/2017 11/2/2017 PASS
DetailsKatelyn Menuge
Routing - PLAN CHECK11/2/2017 11/2/2017 PASS
DetailsJulie Romig
Permit Ready to Issue  11/2/2017 DONE
PLEASE DO NOT RE ISSUE
Plan Modification Accepted  11/1/2017 DONE
plan mod resubmitted-sheet A2.3-during construction the roofing eave overhang was modified at the north eastern eave of building (along ? line A). It was originally a approx 7'-0"overhang and was constructed as a 4'-0" overhang-no valuations changed-assigned to Julie R
BLD-Other10/26/201710/27/201710/27/2017APASS
DetailsBrandon Shaw
Draft stopping
BLD-Energy code compliance10/25/201710/26/201710/26/2017APASS
DetailsMike Jordan
Rod Phone #: ###-####
BLD-Framing/Rough-in10/26/201710/26/201710/26/2017PPASS
DetailsMike Jordan
Rod Phone #: ###-####. previous framing issues resolved. Exterior walls, and roof system ok to cover.
BLD-Wall Bracing10/23/201710/24/201710/24/2017ACANC
DetailsMike Jordan
Rod Phone #: ###-####
BLD-Framing/Rough-in10/24/201710/24/201710/24/2017APART
DetailsMike Jordan
Rod Phone #: ###-####. Complete lateral bracing and complete truss repairs. Also discussed installation of draft stop.
BLD-Wall Bracing10/6/201710/6/201710/6/2017PPASS
DetailsMike Jordan
shear - rod Phone #: ###-####. Exterior shear walls ok.
Issue PAID IN FULL permit  9/7/2017 DONE
Print Occupancy Form  9/7/2017 DONE
OVERRIDE  9/6/2017  
Plan assigned to (JAR)7/5/20177/5/20179/6/2017 DONE
DetailsJulie Romig
08/15 (08/29) - 502 Boise Skin Clinic
Routing - PLAN CHECK7/5/2017 9/6/2017 PASS
DetailsJulie Romig
1st review completed  9/6/2017 DONE
DetailsJulie Romig
PLANS/APPL TAKEN TO FRONT DESK  9/6/2017 DONE
Plan Reviewer's activity  9/6/2017 DONE
DetailsJulie Romig
Architect and contractor notified that plan review is complete. Plan Review report with redlined items for field verification emailed to them as well.
Permit Ready to Issue  9/6/2017 DONE
need
rev cert of val-MET
Routing - PLUMBING8/29/2017 8/29/2017 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Plan resubmittals received  8/25/2017 DONE
DetailsChristina Prado
Received original manual j, taken directly to Brian Murphy
Routing Off Site - STRUCTURAL8/11/2017 8/14/2017 PASS
DetailsJulie Romig
Approved per ePlanReview
Route to Impact Fee Review8/1/20178/4/20178/1/2017 PASS
DetailsMarissa Taylor
Routing PW Drainage7/6/2017 7/31/2017 PASS
DetailsBrian Murphy
Routing Off Site - STRUCTURAL7/5/2017 7/12/2017 FAIL
DetailsJulie Romig
Corrections required per ePlanReview
Routing - Addressing7/5/2017 7/11/2017 PASS
DetailsLaura Hunter
Routing - PLANNING Land Div7/5/2017 7/10/2017 PASS
DetailsTodd Tucker
Routing - FIRE7/5/20177/5/20177/7/2017 PASS
DetailsScott Arellano
Comments attached to case.
Routing PW Environmental7/6/2017 7/7/2017 PASS
DetailsRick Christenson
Routing - MECHANICAL7/5/2017 7/7/2017 PASS
DetailsTroy James
Routing - PLUMBING7/5/2017 7/6/2017 PASS
DetailsBill VanDegrift
Per plan and ISPC.
Routing - PLANNING7/5/2017 7/6/2017 PASS
DetailsCody Riddle
Approved by DR.
Routing - Design Review7/5/2017 7/6/2017 PASS
DetailsKatelyn Menuge
Routing PW Solid Waste7/6/2017 7/6/2017 PASS
DetailsEvan Carpenter
Solid waste is OK as planned.
Routing PW Sewer Design7/6/2017 7/6/2017 PASS
DetailsKyle S. Rosenmeyer
Routing PW Street Lights7/6/2017 7/6/2017 PASS
DetailsTom Marshall
Routing - PUBLIC WORKS7/5/2017 7/6/2017 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment7/5/2017 7/5/2017 PASS
DetailsMelissa Jannusch
Plan approved
Intake Approval  7/5/2017 PASS
Intake Approval  7/1/2017 FAIL
DetailsJulie Romig
Need:
1. Verification of Legal Lot or Parcel
2. Site Drainage Report - indicated on Checklist but not uploaded.
3. Planning and Zoning letters of approval - indicated on checklist, but not uploaded.
Application received  6/28/2017 DONE
Application submitted via PDS Online on Jun 28 2017 3:12PM