Print Statement | | | 6/20/2018 | | DONE |
|
|
|
|
First Notice | | 5/20/2018 | 6/11/2018 | | DONE |
|
|
|
mailed 6-12
|
Permanent Occupancy | | | 5/10/2018 | | DONE |
|
|
|
|
Zoning Approval | 5/9/2018 | 5/9/2018 | 5/9/2018 | | PASS |
Katelyn Menuge
|
|
|
|
Temporary Occupancy | 5/2/2018 | 7/31/2018 | 5/2/2018 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd 30 day extension on temp c of o
|
Telephone call | | | 5/2/2018 | | DONE |
|
|
|
emailed MJ about the temp c of o-he is going to email Jason Blais
|
BLD-Aging Inspection | 4/2/2018 | 4/2/2018 | 4/2/2018 | | PASS |
Mike Jordan
|
|
|
|
PubWorks Occupancy Approval | 2/5/2018 | 2/5/2018 | 2/5/2018 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 1/31/2018 | 2/1/2018 | 2/1/2018 | A | PASS |
Mike Jordan
|
|
|
Rod Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once zoning signs perm.
|
Temporary Occupancy | 2/1/2018 | 5/2/2018 | 2/1/2018 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 1/30/2018 | 1/31/2018 | 1/31/2018 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
Rod Phone #: ###-####
|
FIRE-Final Inspection | 1/26/2018 | 1/29/2018 | 1/29/2018 | A | FAIL |
Troy Cobbley
|
|
|
Need small documents, need four emergency lights repaired, need address, need fire dept signage, need Grading permit inspected/signed off.
Rod Phone #: ###-####
|
FIRE-Final Inspection | 1/26/2018 | 1/26/2018 | 1/26/2018 | P | CANC |
Troy Cobbley
|
|
|
Canceled due to time constraints
Rod Phone #: ###-####
|
Zoning Approval Temp | 1/25/2018 | 1/25/2018 | 1/25/2018 | | DONE |
Katelyn Menuge
|
|
|
Bond for Landscape and Exterior Paint- BND18-00016
|
Print Occupancy Form | | | 1/25/2018 | | |
|
|
|
|
BLD-Ceiling Grid Inspection | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | PASS |
Mike Jordan
|
|
|
Rod Phone #: ###-####
|
BLD-Framing/Rough-in | 12/1/2017 | 12/1/2017 | 12/1/2017 | P | PASS |
Mike Jordan
|
|
|
Rod Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 12/1/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/1/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 11/2/2017 | | |
|
|
|
|
Plan assigned to (JAR) | 11/1/2017 | 11/1/2017 | 11/2/2017 | | DONE |
Julie Romig
|
|
|
11/02 - Plan Mod Boise Skin Clinic
|
Routing - Design Review | 11/2/2017 | | 11/2/2017 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - PLAN CHECK | 11/2/2017 | | 11/2/2017 | | PASS |
Julie Romig
|
|
|
|
Permit Ready to Issue | | | 11/2/2017 | | DONE |
|
|
|
PLEASE DO NOT RE ISSUE
|
Plan Modification Accepted | | | 11/1/2017 | | DONE |
|
|
|
plan mod resubmitted-sheet A2.3-during construction the roofing eave overhang was modified at the north eastern eave of building (along ? line A). It was originally a approx 7'-0"overhang and was constructed as a 4'-0" overhang-no valuations changed-assigned to Julie R
|
BLD-Other | 10/26/2017 | 10/27/2017 | 10/27/2017 | A | PASS |
Brandon Shaw
|
|
|
Draft stopping
|
BLD-Energy code compliance | 10/25/2017 | 10/26/2017 | 10/26/2017 | A | PASS |
Mike Jordan
|
|
|
Rod Phone #: ###-####
|
BLD-Framing/Rough-in | 10/26/2017 | 10/26/2017 | 10/26/2017 | P | PASS |
Mike Jordan
|
|
|
Rod Phone #: ###-####. previous framing issues resolved. Exterior walls, and roof system ok to cover.
|
BLD-Wall Bracing | 10/23/2017 | 10/24/2017 | 10/24/2017 | A | CANC |
Mike Jordan
|
|
|
Rod Phone #: ###-####
|
BLD-Framing/Rough-in | 10/24/2017 | 10/24/2017 | 10/24/2017 | A | PART |
Mike Jordan
|
|
|
Rod Phone #: ###-####. Complete lateral bracing and complete truss repairs. Also discussed installation of draft stop.
|
BLD-Wall Bracing | 10/6/2017 | 10/6/2017 | 10/6/2017 | P | PASS |
Mike Jordan
|
|
|
shear - rod Phone #: ###-####. Exterior shear walls ok.
|
Issue PAID IN FULL permit | | | 9/7/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/7/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 9/6/2017 | | |
|
|
|
|
Plan assigned to (JAR) | 7/5/2017 | 7/5/2017 | 9/6/2017 | | DONE |
Julie Romig
|
|
|
08/15 (08/29) - 502 Boise Skin Clinic
|
Routing - PLAN CHECK | 7/5/2017 | | 9/6/2017 | | PASS |
Julie Romig
|
|
|
|
1st review completed | | | 9/6/2017 | | DONE |
Julie Romig
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2017 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/6/2017 | | DONE |
Julie Romig
|
|
|
Architect and contractor notified that plan review is complete. Plan Review report with redlined items for field verification emailed to them as well.
|
Permit Ready to Issue | | | 9/6/2017 | | DONE |
|
|
|
need
rev cert of val-MET
|
Routing - PLUMBING | 8/29/2017 | | 8/29/2017 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Plan resubmittals received | | | 8/25/2017 | | DONE |
Christina Prado
|
|
|
Received original manual j, taken directly to Brian Murphy
|
Routing Off Site - STRUCTURAL | 8/11/2017 | | 8/14/2017 | | PASS |
Julie Romig
|
|
|
Approved per ePlanReview
|
Route to Impact Fee Review | 8/1/2017 | 8/4/2017 | 8/1/2017 | | PASS |
Marissa Taylor
|
|
|
|
Routing PW Drainage | 7/6/2017 | | 7/31/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing Off Site - STRUCTURAL | 7/5/2017 | | 7/12/2017 | | FAIL |
Julie Romig
|
|
|
Corrections required per ePlanReview
|
Routing - Addressing | 7/5/2017 | | 7/11/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PLANNING Land Div | 7/5/2017 | | 7/10/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - FIRE | 7/5/2017 | 7/5/2017 | 7/7/2017 | | PASS |
Scott Arellano
|
|
|
Comments attached to case.
|
Routing PW Environmental | 7/6/2017 | | 7/7/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - MECHANICAL | 7/5/2017 | | 7/7/2017 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 7/5/2017 | | 7/6/2017 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - PLANNING | 7/5/2017 | | 7/6/2017 | | PASS |
Cody Riddle
|
|
|
Approved by DR.
|
Routing - Design Review | 7/5/2017 | | 7/6/2017 | | PASS |
Katelyn Menuge
|
|
|
|
Routing PW Solid Waste | 7/6/2017 | | 7/6/2017 | | PASS |
Evan Carpenter
|
|
|
Solid waste is OK as planned.
|
Routing PW Sewer Design | 7/6/2017 | | 7/6/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing PW Street Lights | 7/6/2017 | | 7/6/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing - PUBLIC WORKS | 7/5/2017 | | 7/6/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 7/5/2017 | | 7/5/2017 | | PASS |
Melissa Jannusch
|
|
|
Plan approved
|
Intake Approval | | | 7/5/2017 | | PASS |
|
|
|
|
Intake Approval | | | 7/1/2017 | | FAIL |
Julie Romig
|
|
|
Need:
1. Verification of Legal Lot or Parcel
2. Site Drainage Report - indicated on Checklist but not uploaded.
3. Planning and Zoning letters of approval - indicated on checklist, but not uploaded.
|
Application received | | | 6/28/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 28 2017 3:12PM
|