BLD-Final | 4/5/2018 | 4/6/2018 | 4/6/2018 | A | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
DOC - Permit Finaled | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Other | 2/8/2018 | 2/9/2018 | 2/9/2018 | A | PASS |
Brandon Shaw
|
|
|
sofit- Rollo Phone #: ###-####
|
OVERRIDE | | | 2/5/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 1/19/2018 | 1/19/2018 | 2/5/2018 | | DONE |
Brian McGowan
|
|
|
retaining wall resubmittal
|
Routing - PLAN CHECK | 2/5/2018 | | 2/5/2018 | | PASS |
Brian McGowan
|
|
|
No charge for resubmittal. Minimal time.
|
Permit Ready to Issue | | | 2/5/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE
|
CHANGE STATUS TO (ISS) | | | 2/5/2018 | | DONE |
|
|
|
PLAN MOD
|
(F) Reprint permit | | | 2/5/2018 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 1/26/2018 | 1/26/2018 | 1/26/2018 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
Routing PW Grading-Hillside | 1/25/2018 | | 1/25/2018 | | PASS |
Melissa Jannusch
|
|
|
Resubmittal approved
|
Plan Modification Accepted | | | 1/19/2018 | | DONE |
|
|
|
plan mod started in e plan-new retaining wall-assigned to Brian McGowan
|
BLD-Energy code compliance | 12/13/2017 | 12/13/2017 | 12/13/2017 | P | PASS |
Brandon Shaw
|
|
|
OK to cover
|
BLD-Framing/Rough-in | 12/8/2017 | 12/11/2017 | 12/11/2017 | A | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Framing/Rough-in | 12/6/2017 | 12/6/2017 | 12/6/2017 | P | NR |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Wall cover | 11/13/2017 | 11/14/2017 | 11/14/2017 | A | PART |
Brandon Shaw
|
|
|
Need revised engineering for tall wall
OK to cover exterior
|
BLD-Foundation | 9/12/2017 | 9/12/2017 | 9/12/2017 | P | PASS |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 9/8/2017 | 9/8/2017 | 9/8/2017 | P | PASS |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
PubWorks Subgrade Approval | 9/6/2017 | 9/6/2017 | 9/6/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 8/23/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/23/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 8/14/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 7/5/2017 | 7/5/2017 | 8/14/2017 | | DONE |
Brian McGowan
|
|
|
1ST REVIEW COMPLETE - FAIL - 7/24 sfd Level 2 ePlan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/14/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/14/2017 | | DONE |
|
|
|
MET
|
Routing PW Grading-Hillside | 8/11/2017 | | 8/11/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PLAN CHECK | 8/1/2017 | | 8/1/2017 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 7/31/2017 | | FAIL |
Brian McGowan
|
|
|
Engineering for footings need to match from plan to calculations
|
Routing - PLAN CHECK | 7/5/2017 | | 7/31/2017 | | FAIL |
Brian McGowan
|
|
|
|
Routing - Addressing | 7/5/2017 | | 7/11/2017 | | PASS |
Laura Hunter
|
|
|
|
Route to Impact Fee Review | 7/5/2017 | 7/8/2017 | 7/7/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing PW Grading-Hillside | 7/5/2017 | | 7/7/2017 | | FAIL |
Jason C. Taylor
|
|
|
see changemarks in eplan. JCT
|
Routing - MECHANICAL | 7/5/2017 | | 7/6/2017 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 7/5/2017 | 7/5/2017 | 7/5/2017 | | PASS |
Scott Arellano
|
|
|
Plans were reviewed for FD Access, hydrant availability and defensible space. No comments required.
|
Routing - PUBLIC WORKS | 7/5/2017 | | 7/5/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 7/5/2017 | | 7/5/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Valid RP and PD. Site preparation inspection required.
|
Plans ACCEPTED BY PLAN TECH | | | 7/5/2017 | | DONE |
|
|
|
|
Intake Approval | | | 7/5/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/5/2017 | | DONE |
|
|
|
|
Application received | | | 6/28/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 28 2017 4:43PM
|
Routing - PLANNING | 7/5/2017 | | | | PASS |
|
|
|
Please make sure the driveway does not exceed 33 ft. in the front 20 ft. setback.
|