BLD-Final | 8/17/2017 | 8/18/2017 | 8/18/2017 | A | PASS |
Brandon Shaw
|
|
|
PLEASE call ahead for access, Ryan needs to open the house up for inspection - Ryan Phone #: ###-####
|
DOC - Permit Finaled | 8/18/2017 | 8/18/2017 | 8/18/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 8/14/2017 | 8/15/2017 | 8/15/2017 | A | NR |
Jim Storey
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 7/3/2017 | 7/3/2017 | 7/5/2017 | P | PASS |
Brandon Shaw
|
|
|
Ryan Phone #: ###-####
|
Routing Walk-In (BLD) | 7/3/2017 | 7/3/2017 | 7/3/2017 | A | DONE |
Josh Bogle
|
|
|
|
1st review completed | | | 7/3/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - FRONT DESK | 7/3/2017 | | 7/3/2017 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/3/2017 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/3/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 7/3/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/3/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 6/30/2017 | 6/30/2017 | 6/30/2017 | P | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 6/30/2017 | | 6/30/2017 | | FAIL |
Brian McGowan
|
|
|
Welds for steel post to base and cap must be engineered (Form 310 is required). Minimum 2/12 slope for asphalt shingles required.
|
Routing Walk-In (Zoning) | 6/29/2017 | 6/29/2017 | 6/29/2017 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 6/29/2017 | 6/29/2017 | 6/29/2017 | A | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 6/29/2017 | | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/29/2017 | | 6/29/2017 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 6/29/2017 | | | |
|
|
|
|