BLD-Final | 1/25/2018 | 1/26/2018 | 1/26/2018 | A | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
DOC - Permit Finaled | 1/26/2018 | 1/26/2018 | 1/26/2018 | P | PASS |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 1/26/2018 | 1/26/2018 | 1/26/2018 | | DONE |
Melissa Jannusch
|
|
|
Bond placed BND18-00006
|
Case Summary (BLD) | | | 1/26/2018 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 1/26/2018 | | DONE |
|
|
|
|
BLD-Other | 12/13/2017 | 12/14/2017 | 12/13/2017 | A | PASS |
Brandon Shaw
|
|
|
Soffit inspection
|
BLD-Other | 12/13/2017 | 12/14/2017 | 12/13/2017 | P | CANC |
Brandon Shaw
|
|
|
Soffit inspection Phone #: ###-#### Inspection requested via web by Brad McJunkin
|
BLD-Energy code compliance | 11/3/2017 | 11/3/2017 | 11/3/2017 | P | PASS |
Brandon Shaw
|
|
|
Rollo Phone #: ###-####
|
BLD-Framing/Rough-in | 10/31/2017 | 11/1/2017 | 11/1/2017 | A | PASS |
Brandon Shaw
|
|
|
Rolo Phone #: ###-####
|
BLD-Wall Bracing | 10/13/2017 | 10/16/2017 | 10/16/2017 | A | PASS |
Brandon Shaw
|
|
|
Shear // Rolo Phone #: ###-####
|
BLD-Foundation | 9/11/2017 | 9/11/2017 | 9/11/2017 | P | CANC |
Brandon Shaw
|
|
|
|
PubWorks Subgrade Approval | 9/6/2017 | 9/6/2017 | 9/6/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Inspection Record Card- Bld | | | 8/23/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/23/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 8/22/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 6/30/2017 | 6/30/2017 | 8/22/2017 | | DONE |
Brian McGowan
|
|
|
1st review complete- FAIL -7/24 sfd Level 2 ePlan
|
Routing - PLAN CHECK | 8/22/2017 | | 8/22/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/22/2017 | | DONE |
Christina Prado
|
|
|
All requirements met for issuance
|
Routing PW Grading-Hillside | 8/18/2017 | | 8/18/2017 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Melissa Jannusch at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
|
Routing - PLAN CHECK | 8/17/2017 | | 8/17/2017 | | FAIL |
Brian McGowan
|
|
|
Several plan sheets uploaed were the same sheets that required corrections.
|
1st review completed | | | 8/8/2017 | | FAIL |
Brian McGowan
|
|
|
Plans did not match sheet to sheet
|
Routing - PLAN CHECK | 6/30/2017 | | 8/8/2017 | | FAIL |
Brian McGowan
|
|
|
Plans did not match sheet to sheet
|
Routing PW Grading-Hillside | 6/30/2017 | | 7/7/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - MECHANICAL | 6/30/2017 | | 7/5/2017 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 6/30/2017 | 7/3/2017 | 7/4/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 6/30/2017 | 6/30/2017 | 7/3/2017 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for FD access, hydrant availability and defensible space.
|
Routing - Erosion and Sediment | 6/30/2017 | | 7/3/2017 | | PASS |
Melissa Jannusch
|
|
|
Plan approved
|
Plans ACCEPTED BY PLAN TECH | | | 6/30/2017 | | DONE |
|
|
|
|
Intake Approval | | | 6/30/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/30/2017 | | DONE |
|
|
|
|
Routing - PLANNING | 6/30/2017 | | 6/30/2017 | | PASS |
Sue Cummings
|
|
|
See redlines. Mas driveway width in front setback is 33 ft.
|
Routing - Addressing | 6/30/2017 | | 6/30/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 6/30/2017 | | 6/30/2017 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 6/29/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 29 2017 4:15PM
|