Permit Information
Permit NumberBLD17-02185
StatusFinaled
Name EKC INC
Site Address 222 N 8TH ST
Project NameDiablo & Sons Mezcaleria
Customer Number 
ePlanReviewYes
Description
(DIABLO & SONS MEZCALERIA RESTAURANT AND BAR – FORMERLY POLLO REY MEXICAN ROTISSERIE – SOUTHWEST CORNER OF THE FIRST STORY AND BASEMENT FOOD PREPARATION ROOMS) (DRH16-00358) (2-20-19 PLAN MODIFICATION TO INSTALL VENEER STONE MASONRY COLUMN BASES SIMILAR TO THE ORIGINAL HISTORIC DESIGN AND TO REVISE THE EXTERIOR LANDING AND RAMP AT THE 8TH STREET ENTRANCE.) (2-13-18 PLAN MODIFICATION TO STRENGTHEN THE FLOOR TO SUPPORT AN OPEN-FIRE GRILLWORKS WOOD FUEL CHARBROILER LOCATED ON THE 1ST STORY ABOVE. THE STRUCTURAL CAPACITY OF THE FLOOR WAS EVALUATED WITH C4 x 4.5 CHANELS SISTERED TO EXISTING WOOD JOISTS. SPECIAL INSPECTION IS REQUIRED FOR WELDING) (1-11-18 PLAN MODIFICATION TO MAKE STRUCTURAL CHANGES TO THE EXISTING ROOF SYSTEM AND TO THE 2ND STORY FLOOR SYSTEM TO ACCOMMODATE THE GREASE DUCTS AND THE MAKE-UP AIR DUCT DESIGN THAT WAS APPROVED EARLIER AS PART OF THIS TENANT IMPROVEMENT PERMIT. THIS STRUCTURAL DESIGN WAS POSTPONED UNTIL AFTER THE ACTUAL EXISTING STRUCTURAL CONDITIONS OF THE ROOF COULD BE DETERMINED. THE WORK IS REQUIRED TO COMPLY WITH THE STRUCTURAL DESIGN AND DETAILS.) (12-13-17 PLAN MODIFICATION TO REMOVE 6 COLUMNS IN THE BASEMENT AND TO REDIRECT THE LOAD PATH TO EXISTING AND MODIFIED JOISTS AND HEADERS.) (11-20-17 PLAN MODIFICATION TO SHIFT SOME BASEMENT WALLS DUE TO CONSTRUCTION CONDITIONS AND TO UPDATE MECHANICAL DRAWINGS AND ELECTRICAL DRAWINGS.) The fire sprinkler system is used to substitute for 1-hr fire-resistance-rated construction of the building. To remodel a 2,289 square foot restaurant tenant space located on the 1st story and to expand the sidewalk seating to about 952 total square feet. The entry to the adjacent East tenant space will also be remodeled to include an entry vestibule at the exterior door. In addition, the windows of the East tenant space will be replaced with glazed vertical sliding overhead exterior doors. Work is to include interior nonbearing walls, suspended ceilings, gypsum board ceilings, sound attenuation insulation and plywood ceiling, three entry vestibules at exterior doors, maintaining an existing Type I grease hood and duct system with a listed 1-hr duct wrap system installed from the hood all the way to the exhaust fan on the roof, a modified hood make-up air system, a new Type I grease hood and duct system for solid fuel burning cooking equipment with a listed 1-hr duct wrap system installed from the hood all the way to the exhaust fan on the roof and served by the modified make-up air system, kitchen equipment, glazed vertical sliding overhead exterior doors, exterior doors, millwork, and finishes. To remodel food preparation areas in the basement (total area of about 3,000 square feet). Work is to include interior nonbearing walls, a bearing wall with a concrete footing, a new concrete floor on steel decking to replace a section of wood floor above the new grease hoods, two Type I grease hoods each served by a grease duct that becomes a common grease duct system with make-up air, a listed 1-hr grease duct wrap system continuous from the grease hoods all the way to the exhaust fan on the roof, walk-in coolers, food preparation equipment, and finishes. The changes to the roof structure required to support the added roof top equipment, improved roof access to serve new and existing roof top equipment, the chase wall through the 2nd story to accommodate ducts, and the increased exit access headroom height in the basement were all done under separate permits. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 8/22/20198/22/2019 DONE
This permit finaled on the web by Charlene Meadows
First Notice 7/27/20198/12/2019 DONE
mailed 8-13
Permanent Occupancy  7/17/2019 DONE
Telephone call  7/10/2019 DONE
emailed brandon@ekcconstruction.com that the temp c of o expires today and if not ready for final to email Jason blais
BLD-Final6/29/20197/2/20197/2/2019APASS
DetailsDave Hannah
Please call me prior to inspection. I''ll bring the ADA accessible directional signs with me and place where they need to be during inspection. Thanks! Phone #: ###-#### Inspection requested via web by Brandon McCurdy
Zoning Approval6/26/20196/26/20196/26/2019 PASS
DetailsJosh Wilson
Temporary Occupancy6/10/20199/8/20196/10/2019 DONE
DetailsCandy A. Nichols
Jason Blais ok'd 30 day extenion on temp c of o
Telephone call  6/10/2019 DONE
called Brandon ###-#### to let know the temp c of o is expired-he said they were almost done but will email Jason B today to extend temp
Temporary Occupancy5/2/20197/31/20195/2/2019 DONE
DetailsCandy A. Nichols
Jason Blais ok'd 30 day extension from 5-6-19
BLD-Final4/18/20194/19/20194/19/2019AFAIL
DetailsJim Storey
Exterior complete. Phone #: ###-#### Inspection requested via web by Brandon McCurdy mail box full// not on site// singage not in place// zoning not signed off
Temporary Occupancy4/19/20197/18/20194/19/2019 DONE
DetailsCandy A. Nichols
Jason Blaid ok'd 15 day temp c of o good through May 6th (17 days since 15 was on a Sat)
BLD-Final4/16/20194/17/20194/17/2019ANR
DetailsJim Storey
Entry ramp at 8th street complete and ready for inspection. Phone #: ###-#### Inspection requested via web by Brandon McCurdy
Telephone call  3/20/2019 DONE
emailed brandon@ekcconstruction.com to let know the temp c of o expires today and he needs to email Jason Blais as well as call Andrea because the bond expired
BLD-Aging Inspection3/4/20193/4/20193/7/2019 PEND
DetailsDave Hannah
should be in temp c of o status but had a plan mod
OVERRIDE  2/20/2019  
OVERRIDE  2/20/2019  
OVERRIDE  2/20/2019  
Plan assigned to (CJW)2/12/20192/12/20192/20/2019 PASS
DetailsCarl Westfall
Plan mod (routed to Design Review)
Routing - Design Review2/15/2019 2/20/2019 PASS
DetailsAndrea Tuning
Plan Reviewer's activity  2/20/2019 PASS
The most recent plan mod was approved
Permit Ready to Issue  2/20/2019 DONE
plan mod please do not re issue-in temp c of o status
CHANGE STATUS TO (ISS)  2/20/2019 DONE
plan mod
Routing - PLAN CHECK2/13/2019 2/15/2019 PASS
DetailsCarl Westfall
6th plan mod approved
Plan Modification Accepted  2/12/2019 DONE
remove the existing EIFS substrate exterior column bases of the entire building, replace with stone masonry, like the original, historic disgin of the building. the diablo restaurant has a new painted wood panel wainscot that will remian. the exterior ramp at 8th st entrance will be modified to comply with the code and design review requirements
Temporary Occupancy1/18/20194/18/20191/18/2019 DONE
DetailsCandy A. Nichols
Jason Blais accepted the Req for ext good through 4/17/19
BLD-Conference1/11/20191/14/20191/14/2019APEND
DetailsDave Hannah
If possible, please give me at lease a 30 min. heads up and I''ll meet you at the site. I''ve got a couple of other folks that would like to review the 8th street entry pavers that need to be corrected. Phone #: ###-#### Inspection requested via web by Brandon McCurdy needs to see aproved plans
Telephone call  1/14/2019 DONE
emailed brandon@ekcconstruction.com to let know bond and Temp C of O will expire 1-17-19-email came back undeliverable so just called him-he's going to email Jason B. and get with Christina for the bond that will expire on 1-17-19
BLD-Conference11/16/201811/16/201811/16/2018APEND
DetailsDave Hannah
needs to fix landing at door on 8th street
Temporary Occupancy10/18/20181/16/201910/18/2018 DONE
DetailsTisha Gallop
Pending planning & Zoning and final Building
Zoning Approval Temp10/18/201810/18/201810/18/2018 DONE
DetailsAndrea Tuning
Bond has been posted for exterior building materials.
BLD-Final10/11/201810/12/201810/12/2018PPART
DetailsMike Jordan
Pending on ADA (8th st) per Dave H 11/16/18 Dale Phone #: ###-####
FIRE-Final Inspection10/11/201810/12/201810/12/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, hood suppression system inspection complete, fire extinguishers will be mounted in discussed locations. Final life fire safety inspection for area of work complete.

Dale Phone #: ###-####
BLD-Ceiling Grid Inspection9/7/20189/7/20189/7/2018PPASS
DetailsMike Jordan
dale Phone #: ###-####
BLD-Conference5/18/20185/21/20185/21/2018ADONE
DetailsDave Hannah
We like to go over any items that may need to be addressed in preparation for our building final to avoid any surprises. Thanks. Phone #: ###-#### Inspection requested via web by Brandon McCurdy
BLD-Framing/Rough-in4/24/20184/24/20184/25/2018PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Brandon McCurdy ok after elec oks rough ins
BLD-Aging Inspection3/22/20183/22/20183/23/2018 PEND
DetailsDave Hannah
BLD-Aging Inspection3/21/20183/21/20183/23/2018 PEND
DetailsDave Hannah
CHANGE STATUS TO (ISS)  3/1/2018 DONE
Plan Mod
(F) Reprint permit  3/1/2018 DONE
OVERRIDE  2/13/2018  
Plan assigned to (CJW)2/7/20182/7/20182/13/2018 PASS
DetailsCarl Westfall
x Plan mod Diablos
Plan Reviewer's activity  2/13/2018 PASS
5th plan mod approved
Routing - PLAN CHECK2/7/2018 2/13/2018 PASS
DetailsCarl Westfall
Permit Ready to Issue  2/13/2018 DONE
DO NOT REISSUE - fees due for 4th & 5th plan mod
Plan Modification Accepted  2/7/2018  
started plan mod workflor for structural steel channels hwere basement hood displaces cut floor joists
OVERRIDE  1/11/2018  
Plan assigned to (CJW)1/5/20181/5/20181/11/2018 PASS
DetailsCarl Westfall
x Diablos plan mod
Routing - PLAN CHECK1/10/2018 1/11/2018 PASS
DetailsCarl Westfall
4th plan mod
Plan Reviewer's activity  1/11/2018 PASS
4th plan mod approved
Permit Ready to Issue  1/11/2018 DONE
DO NOT RE ISSUE
4th Plan mod approved
Plan Modification Accepted  1/10/2018 DONE
Workflow in ePlanReview received
Plan Modification Accepted  1/5/2018 DONE
Eplan workflow started
OVERRIDE  1/3/2018  
Plan assigned to (CJW)12/28/201712/28/20171/3/2018 PASS
DetailsCarl Westfall
x plan mod - Diablos
Routing - PLAN CHECK12/29/2017 1/3/2018 PASS
DetailsCarl Westfall
3rd plan mod approved
Plan Reviewer's activity  1/3/2018 PASS
3rd plan mod approved
Permit Ready to Issue  1/3/2018 DONE
PLAN MOD # APPROVED
DO NO RE ISSUE
Plan Modification Accepted  12/29/2017 DONE
Workflow in ePlanReview received
Plan Modification Accepted  12/28/2017 DONE
CHANGE STATUS TO (ISS)  12/14/2017 DONE
OVERRIDE  12/13/2017  
Plan assigned to (CJW)12/1/201712/1/201712/13/2017 PASS
DetailsCarl Westfall
xxxxx plan mod "Diablos"
Routing - PLAN CHECK11/29/2017 12/13/2017 PASS
DetailsCarl Westfall
(11-29-17) Need a framing plan from the Architect.
(12-13-17) Plan mod approved after receiving the framing plan.
Plan Reviewer's activity  12/13/2017 DONE
The Architect Emailed a framing plan and the Plans Examiner uploaded it.
Plan Reviewer's activity  12/13/2017 PASS
2nd plan mod approved
Permit Ready to Issue  12/13/2017 DONE
DO NOT REISSUE, PLAN MOD
Plan Modification Accepted  12/1/2017 DONE
DetailsChristina Prado
Plan Mod - remove misc columns
Telephone call  11/29/2017 DONE
sent Phillip an email asking him to give me the sheet names so i can start the plan mod-they were not in the plan mod application
Plan Modification Accepted  11/29/2017 DONE
DetailsCarl Westfall
ePlanReview workflow received. There was some confussion at the permits desk so the Plans Examiner was not aware of application until 12-1-17.
CHANGE STATUS TO (ISS)  11/28/2017 DONE
OVERRIDE  11/21/2017  
Plan assigned to (CJW)11/17/201711/17/201711/21/2017 PASS
DetailsCarl Westfall
xx plan mod - Diablo
Routing - PLAN CHECK11/17/2017 11/21/2017 PASS
DetailsCarl Westfall
Plan mod approved
Plan Reviewer's activity  11/21/2017 PASS
1st plan mod approved
Permit Ready to Issue  11/21/2017 DONE
PLAN MOD. DO NOT ISSUE AGAIN
Plan Modification Accepted  11/17/2017 DONE
plan mod accepted in e plan-scope of new work-some basement walls had to move up to 6" due to construction conditions -also updated mechanical drawings and electrical plans-plan mod sheets are A1.6, 6.1, E2.1, E2.2, M1.1, M2.1, M2.2, M4.1, M5.11-assigned to Carl W
BLD-Footing11/3/201711/6/201711/7/2017PPASS
DetailsDave Hannah
Call prior to going Phone #: 2089496755 >> Inspection requested via mobile web by Tony Dondero
Print Occupancy Form  11/3/2017 DONE
Issue PAID IN FULL permit  11/3/2017 DONE
OVERRIDE  11/2/2017  
Plan assigned to (CJW)7/5/20177/5/201711/2/2017 PASS
DetailsCarl Westfall
(2nd done) (July 25 - 15 days) (54 sheets) Diablo & Sons Mezcaleria
Routing Off Site - C.D.H11/1/2017 11/2/2017 PASS
DetailsCarl Westfall
Brent Copes
Routing PW Environmental11/1/2017 11/2/2017 PASS
DetailsRick Christenson
Endura XL 100 gpm grease interceptor is approved.
PLANS/APPL TAKEN TO FRONT DESK  11/2/2017 DONE
Permit Ready to Issue  11/2/2017 DONE
ALL MET
Need
ACHD

MET
RP
GC Form
Revised Cert of Value
Routing - Design Review11/1/2017 11/1/2017 PASS
DetailsAndrea Tuning
Site Plan has been redlined. The outdoor dining area is not approved with this application.
Routing - PLAN CHECK10/31/2017 11/1/2017 PASS
DetailsCarl Westfall
Approved with redlines
Routing - PLUMBING11/1/2017 11/1/2017 PASS
DetailsBill VanDegrift
Basement kitchen has changed
Routing PW Sewer Rating11/1/2017 11/1/2017 PASS
DetailsBeverly Mountain
Basement kitchen has changed
Plan resubmittals received  10/31/2017 DONE
Plan resubmittals requested  10/30/2017 DONE
Routing - MECHANICAL10/23/2017 10/30/2017 PASS
DetailsTroy James
Field inspector shall verify installation per code and manufacturer installation requiements.
Routing - PLAN CHECK10/23/2017 10/25/2017 FAIL
DetailsCarl Westfall
Accessible route to the restrooms and structural calcs for the new floor
Routing - PLUMBING10/23/2017 10/23/2017 FAIL
DetailsBill VanDegrift
1) plumbing plans do not match architectural plans.
2) address waste system venting.
Plan resubmittals received  10/23/2017 DONE
Route to Impact Fee Review8/13/20178/16/20178/14/2017 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  8/12/2017 DONE
Plan resubmittals requested  8/12/2017 DONE
Routing - PLAN CHECK7/5/2017 8/12/2017 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - MECHANICAL7/5/2017 7/11/2017 FAIL
DetailsTroy James
Talked to mechanical engineer about corrections
Routing - Addressing7/5/2017 7/11/2017 PASS
DetailsLaura Hunter
Routing PW Sewer Rating7/6/2017 7/10/2017 PASS
DetailsBeverly Mountain
Routing PW Environmental7/6/2017 7/7/2017 PASS
DetailsRick Christenson
Shares grease interceptor with BitterCreek.
Routing - PUBLIC WORKS7/5/2017 7/6/2017 PASS
DetailsRachael Beierle
Routing - PLUMBING7/5/2017 7/6/2017 FAIL
DetailsDaryl Spivey
Plumbing plan does not show venting as required by ISPC.
Routing - FIRE7/5/20177/5/20177/5/2017 PASS
DetailsKatie Marron
Comments attached to case.
Intake Approval  7/5/2017 PASS
DetailsAdele J Schaffeld-Griffin
Javier completed pre screen, CDH approval uploaded in documents
Routing - Erosion and Sediment7/5/2017 7/5/2017 PASS
DetailsAndy J. Long
ESC plan waiver approved. Need to designate RP
Routing - Design Review7/5/2017 7/5/2017 PASS
DetailsAndrea Tuning
Intake Approval  7/3/2017 FAIL
DetailsJavier Guzman
Please provide and upload the following:
• Please provide a completed Central District Health Food Establishment License application found at this website https://www.cdhd.idaho.gov/eh-food-forms.php
Application received  6/30/2017 DONE
Application submitted via PDS Online on Jun 30 2017 12:05PM