BLD-Footing | 8/2/2017 | 8/3/2017 | 8/3/2017 | A | PASS |
Jim Storey
|
|
|
Leonard Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/2/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/2/2017 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 7/5/2017 | 7/5/2017 | 8/1/2017 | | PASS |
Carl D Madsen
|
|
|
1st comp 7/15 Trailwind Elementary Picnic Shelter
|
Routing - PLAN CHECK | 7/19/2017 | | 8/1/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 7/19/2017 | | 8/1/2017 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/1/2017 | | DONE |
|
|
|
ALL MET Need GC Form and Revised Cert of Value
|
Route to Impact Fee Review | 7/15/2017 | 7/18/2017 | 7/17/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 7/15/2017 | | FAIL |
|
|
|
Failed structural
|
Routing Off Site - STRUCTURAL | 7/5/2017 | | 7/15/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/5/2017 | | 7/15/2017 | | FAIL |
Carl D Madsen
|
|
|
Failed pending other department approvals.
|
Routing - Addressing | 7/5/2017 | | 7/11/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PLANNING Land Div | 7/5/2017 | | 7/10/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - FIRE | 7/5/2017 | 7/5/2017 | 7/5/2017 | | PASS |
Scott Arellano
|
|
|
No comments required.
|
Routing - PUBLIC WORKS | 7/5/2017 | | 7/5/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 7/5/2017 | | 7/5/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. RP to be determined upon contract reward.
|
Routing - PLANNING | 7/5/2017 | | 7/5/2017 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Design Review | 7/5/2017 | | 7/5/2017 | | PASS |
Sarah Schafer
|
|
|
No Design Review required.
|
Plan Reviewer's activity | | | 7/5/2017 | | DONE |
Javier Guzman
|
|
|
Carl M said it was OK to approve prescreen for the missing 310 form and approval letter from p&z
|
Intake Approval | | | 7/5/2017 | | PASS |
|
|
|
|
Routing PW Drainage | 7/5/2017 | | 7/5/2017 | | PASS |
Brian Murphy
|
|
|
less than 1000sq
|
Intake Approval | | | 7/3/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following:
• Please provide a completed Form #310 – Statement of Special Inspections completed by the design engineer. the 310 form can be found on our website at http://pds.cityofboise.org/home/documents/apps/300/
• Please provide Planning & Zoning letter(s) of approval
• You have stated an attached letter of ESC waiver but none was uploaded, Please upload waiver letter
• The R&M shop drawings were uploaded as a packet on 11”x17” plan sheets, these plan sheets are required to be on a minimum 18” x 24” plan sheets, uploaded individually and file named per the ePlan submittal standards found at http://pds.cityofboise.org/media/105041/electronicstandards.pdf
|
Application received | | | 6/30/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 30 2017 2:01PM
|