BLD-Final | 2/1/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Jim Sly
|
|
|
Aaron Phone #: ###-####
|
DOC - Permit Finaled | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 1/31/2018 | 1/31/2018 | 1/31/2018 | P | NR |
Jim Sly
|
|
|
AARON Phone #: ###-####. DON'T JUST GO TO BACK DOOR - KNOCK ON FRONT DOOR FIRST - MOTHER-IN-LAW IS THERE & WILL LET YOU IN Need all trade finals
|
BLD-Energy code compliance | 9/26/2017 | 9/27/2017 | 9/27/2017 | A | PASS |
Jim Sly
|
|
|
Aaron Phone #: ###-#### Owner added ductwork........OK to cover when Mech. rough in is approved.
|
BLD-Framing/Rough-in | 9/22/2017 | 9/25/2017 | 9/25/2017 | A | PASS |
Jim Sly
|
|
|
Aaron Phone #: ###-####
|
BLD-Wall Bracing | 9/14/2017 | 9/15/2017 | 9/15/2017 | A | PASS |
Jim Sly
|
|
|
Shear // Aaron Phone #: ###-####
|
Routing Walk-In (BLD) | 8/30/2017 | 8/30/2017 | 8/30/2017 | P | PASS |
Brian McGowan
|
|
|
Had question on how to stabalize deck construction. He will add a dbl redwd or p.t. trimmer under the 2x6 beams.
|
Routing - PLAN CHECK | 8/30/2017 | | 8/30/2017 | | PASS |
Brian McGowan
|
|
|
Had question on how to stabalize deck construction. He will add a dbl redwd or p.t. trimmer under the 2x6 beams lag bolted to post.
|
BLD-Foundation | 8/2/2017 | 8/3/2017 | 8/3/2017 | A | PASS |
Jim Sly
|
|
|
Aaron Phone #: ###-####
|
BLD-Footing | 7/27/2017 | 7/28/2017 | 7/28/2017 | A | PASS |
Jim Sly
|
|
|
Aaron Phone #: ###-####
|
BLD-Footing | 7/26/2017 | 7/26/2017 | 7/26/2017 | P | NR |
Dave Hannah
|
|
|
Aaron Phone #: ###-####
|
OVERRIDE | | | 7/3/2017 | | |
|
|
|
|
Routing Walk-In (Zoning) | 7/3/2017 | 7/3/2017 | 7/3/2017 | P | DONE |
Leon Letson
|
|
|
|
Routing Walk-In (BLD) | 7/3/2017 | 7/3/2017 | 7/3/2017 | P | DONE |
Josh Bogle
|
|
|
|
1st review completed | | | 7/3/2017 | | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/3/2017 | | 7/3/2017 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/3/2017 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/3/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2017 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 7/3/2017 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Issue PAID IN FULL permit | | | 7/3/2017 | | DONE |
|
|
|
|
Application received | | 7/3/2017 | | | |
|
|
|
|