BLD-Final | 6/8/2018 | 6/11/2018 | 6/11/2018 | A | PASS |
Brandon Shaw
|
|
|
Ready to complete our Final for our Occupancy Permit. Will have our Hillside Approval letter from Public Works Monday morning. Please call with any issue''s. Thank you! Kim Phone #: ###-#### Inspection requested via web by Steve Hanson
|
DOC - Permit Finaled | 6/11/2018 | 6/11/2018 | 6/11/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 6/11/2018 | 6/11/2018 | 6/11/2018 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.5
|
PubWorks Occupancy Approval | 6/11/2018 | 6/11/2018 | 6/11/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Final | 5/31/2018 | 6/1/2018 | 6/1/2018 | P | PART |
Tony Young
|
|
|
Hi Tony, Per our conversation looking to have you inspect the house for completiin at 416 Sherman. Call with any questions. Thank you, Kim Phone #: ###-#### Inspection requested via web by Steve Hanson,, walk through,, needs hillside from public works, railing, window well ladder
|
BLD-Foundation | 4/16/2018 | 4/17/2018 | 4/17/2018 | P | PASS |
Jim Storey
|
|
|
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro would like late afternoon rebar ok for wall se lot
|
BLD-Footing | 4/12/2018 | 4/13/2018 | 4/13/2018 | A | PASS |
Brandon Shaw
|
|
|
Retaining wall- driveway, SE side
|
PubWorks Subgrade Approval | 4/13/2018 | 4/13/2018 | 4/13/2018 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD-Other | 2/22/2018 | 2/23/2018 | 2/23/2018 | A | PART |
Tony Young
|
|
|
soffit,, ok ,, work in progress
|
BLD-Wall cover | 2/21/2018 | 2/21/2018 | 2/21/2018 | P | PART |
Tony Young
|
|
|
Chris,, soffits; Phone #: ###-####,, wip on sheetrock layer,, ok
|
BLD-Energy code compliance | 2/14/2018 | 2/16/2018 | 2/16/2018 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Hanson
|
BLD-Framing/Rough-in | 2/14/2018 | 2/15/2018 | 2/15/2018 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Hanson,, still working on missed bearing on floor trusses,, ok to insulate
|
BLD-Wall Bracing | 2/14/2018 | 2/15/2018 | 2/15/2018 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Hanson
|
BLD-Framing/Rough-in | 2/13/2018 | 2/14/2018 | 2/14/2018 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Hanson,, work in proress
|
BLD-Wall Bracing | 2/13/2018 | 2/14/2018 | 2/14/2018 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Hanson,, work in progress
|
BLD-Framing/Rough-in | 2/9/2018 | 2/12/2018 | 2/12/2018 | A | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Hanson,, c/n posted,, do not insulate
|
BLD-Wall Bracing | 2/9/2018 | 2/12/2018 | 2/12/2018 | A | FAIL |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Hanson,, need to strap and nail portals
|
BLD-Wall Bracing | 2/1/2018 | 2/2/2018 | 2/2/2018 | A | FAIL |
Brandon Shaw
|
|
|
See correction notice-
|
BLD-Wall Bracing | 1/29/2018 | 1/30/2018 | 1/30/2018 | A | FAIL |
Tony Young
|
|
|
Thank you Phone #: ###-#### Inspection requested via web by Steve Hanson,, re-do shear,, need plans
|
BLD-Foundation | 11/16/2017 | 11/16/2017 | 11/17/2017 | P | DONE |
Dave Hannah
|
|
|
Anne Phone #: ###-####
|
BLD-Foundation | 11/17/2017 | 11/17/2017 | 11/17/2017 | A | PASS |
Dave Hannah
|
|
|
Anne Phone #: ###-####
|
BLD-Footing | 11/7/2017 | 11/7/2017 | 11/7/2017 | P | PART |
Tony Young
|
|
|
Annie Phone #: ###-####,, work in progress,, ok
|
PubWorks Subgrade Approval | 11/7/2017 | 11/7/2017 | 11/7/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 11/2/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 7/5/2017 | 7/5/2017 | 11/2/2017 | | DONE |
Brian McGowan
|
|
|
1st review complete - Fail - Structure issues 7/24 sfd Level 2 ePlan
|
Inspection Record Card- Bld | | | 11/2/2017 | | DONE |
|
|
|
|
Telephone call | | | 11/2/2017 | | DONE |
|
|
|
called Steve Hanson and told him permit is ready and fee due
|
Issue PAID IN FULL permit | | | 11/2/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/2/2017 | | 11/2/2017 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/2/2017 | | DONE |
|
|
|
Need
|
Plan resubmittals received | | | 10/27/2017 | | DONE |
|
|
|
resubmittal received 2 sets of sheets A-1.1, A-1.2, A-1.3, A-1.4, A-1.5, A-1.6, A-1.7, A-1.8, A-1-9, A-1.10, A-1.11, A-1.12, A-1.13, & A-1.14-too to Brian McGowan
|
Routing - PLAN CHECK | 10/26/2017 | | 10/26/2017 | | FAIL |
Brian McGowan
|
|
|
Foundation Plan must be stamped and signed.
|
Plan resubmittals received | | | 10/20/2017 | | DONE |
|
|
|
Resubmittlas received 2 sets of sheets A-1.1, A-1.2, A-1.3, A-1.4, A-1.5, A-1.6, A-1.7, A-1.8, A-1.9, A-1.10, A-1.11, A-1.12, A-1.13, A-1.17-took to Brian McGowan
|
Case Summary (BLD) | | | 10/13/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/13/2017 | | 10/13/2017 | | FAIL |
Brian McGowan
|
|
|
Need engineered wall at back patio or revised grading plan.
|
Plan resubmittals received | | | 10/10/2017 | | DONE |
|
|
|
Full new set of plans take to Brian Mc
|
Routing - PLAN CHECK | 9/25/2017 | | 10/6/2017 | | FAIL |
Brian McGowan
|
|
|
No engineering stamp and signature on Plan sheets
|
Plan resubmittals received | | | 10/4/2017 | | DONE |
|
|
|
Full new set of plans and documents taken to Brian Mc
|
Routing - FIRE | 9/21/2017 | 7/5/2017 | 9/25/2017 | | PASS |
Scott Arellano
|
|
|
Approved as shown. No separate comments attached.
|
Routing - Erosion and Sediment | 9/19/2017 | | 9/21/2017 | | PASS |
Andy J. Long
|
|
|
ESC site map with narrative notes provided. RP needs to renew, okay to issue; valid Plan Designer. Site preparation inspection is required.
|
Routing - PLAN CHECK | | | 9/19/2017 | | FAIL |
Brian McGowan
|
|
|
Structure issues
|
1st review completed | | | 9/19/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 7/7/2017 | | 7/13/2017 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 7/5/2017 | 7/8/2017 | 7/7/2017 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 7/7/2017 | | 7/7/2017 | | PASS |
Susan Riggs
|
|
|
|
Routing - Addressing | 7/5/2017 | | 7/7/2017 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PUBLIC WORKS | 7/5/2017 | | 7/7/2017 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Grading-Hillside | | | 7/7/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 7/5/2017 | | DONE |
|
|
|
|
Intake Approval | | | 7/5/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/5/2017 | | DONE |
|
|
|
|
Intake Approval | | | 7/3/2017 | | FAIL |
|
|
|
Missing Geo tech, key for electrical and where Carb.&smoke detectors
|
Application received | | 7/3/2017 | | | |
|
|
|
|