Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD17-02224
StatusIssued
Name OKLAND CONSTRUCTION CO INC
Site Address 1050 E PARK BLVD
Project NameSt Lukes - slab/underslab work
Customer Number 
ePlanReviewYes
Description
(ST. LUKE’S FAMILY MEDICINE – UNDER-SLAB PLUMBING AND CONCRETE SLAB ON GRADE PHASE – NORTH END OF BUILDING) (DRH16-04337) The fire sprinkler system is used for building area increase and for code trade-offs. The building shell was constructed under permit BLD16-04337. The 2012 IBC was in effect at the time. To complete the under-slab waste piping plumbing phase with rough-in stub-ups and trap primers within an 18,074 square foot shell tenant space for 10 single-user toilet rooms, multiple exam room sinks and other sinks, floor sinks, drinking fountains, and floor drains within a future medical office tenant space (i.e. an Outpatient Clinic). A separate plumbing permit is required. All toilet rooms are required to be accessible to the disabled. Under-slab conduit and floor boxes will also be installed. A separate electrical permit is required. Work includes a concrete slab on grade with a vapor barrier and stem wall and slab edge insulation. The rest of the tenant improvement work will be done under a future tenant improvement permit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. This permit does not establish a Certificate of Occupancy for any tenant or for any portion of this building. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Ceiling Grid Inspection4/20/20184/23/20184/23/2018APASS
DetailsDave Hannah
Area A and Exam rooms ceilings Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Energy code compliance2/16/20182/20/20182/20/2018APASS
DetailsDave Hannah
Jim Phone #: ###-#### ok to cover ext walls
BLD-Framing/Rough-in2/16/20182/20/20182/20/2018APART
DetailsDave Hannah
Jim Phone #: ###-#### areas A and B ok to cover ext walls ok
BLD-Final12/27/201712/28/201712/28/2017ANR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Ceiling Grid Inspection12/4/201712/4/201712/4/2017PPASS
DetailsDave Hannah
Mechanical re-inspection scheduled for this afternoon as well. More seismic wires were needed on diffusers. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Ceiling Grid Inspection11/29/201711/29/201711/29/2017ANR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Ceiling Grid Inspection11/10/201711/13/201711/13/2017APASS
DetailsDave Hannah
suspended gypsum board ceiling framing. IVF LaB Phone #: ###-#### Inspection requested via web by Jim Williams hard lid in ivs lab
BLD-Energy code compliance9/14/20179/15/20179/15/2017APASS
DetailsDave Hannah
Inspect insulation and vapor barrier for wall cover.
Thanks Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Framing/Rough-in9/12/20179/12/20179/13/2017PPASS
DetailsDave Hannah
Framing prior to exterior wall insulation. Phone #: ###-#### Inspection requested via web by Jim Williams ok to insulate
Issue PAID IN FULL permit  8/31/2017 DONE
Inspection Record Card- Bld  8/31/2017 DONE
Plan assigned to (CJW)7/12/20177/12/20178/15/2017 PASS
DetailsCarl Westfall
(8a) (Aug 1 - 15 days) under slab plumbing
Routing - PLAN CHECK7/12/2017 8/15/2017 PASS
DetailsCarl Westfall
Approved
1st review completed  8/15/2017 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/15/2017 DONE
Permit Ready to Issue  8/15/2017 DONE
All requirements met 8/24/17 C_P /// Need GC Form and Revised Cert of Value
Routing - PLUMBING7/12/2017 7/14/2017 PASS
DetailsBill VanDegrift
water distribution system plan will be required for the next phase of this project
Routing - FIRE7/12/20177/12/20177/13/2017 PASS
DetailsKatie Marron
Building shell reviewed under BLD16-04337. No comments required.
Routing PW Environmental7/13/2017 7/13/2017 PASS
DetailsTerry Alber
Routing - Addressing7/12/2017 7/13/2017 PASS
DetailsLaura Hunter
Added new address 1050 E Park Blvd
Routing - PUBLIC WORKS7/12/2017 7/13/2017 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment7/12/2017 7/13/2017 PASS
DetailsAndy J. Long
No new ESC permit. Reference existing ESC permit for project, see ESC16-01612
Plan Reviewer's activity  7/12/2017 PASS
DetailsCarl Westfall
Plan intake review approved
Intake Approval  7/12/2017 PASS
DetailsAdele J Schaffeld-Griffin
Carl W signed off on pre screen
Application received  7/3/2017 DONE
Application submitted via PDS Online on Jul 3 2017 5:15PM