BLD-Final | 8/31/2017 | 9/1/2017 | 9/1/2017 | A | PASS |
Brandon Shaw
|
|
|
Aaron Phone #: ###-####
|
DOC - Permit Finaled | 9/1/2017 | 9/1/2017 | 9/1/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Footing | 8/29/2017 | 8/30/2017 | 8/30/2017 | P | PASS |
Brandon Shaw
|
|
|
This footing inspection can be done early in the PM. Aaron will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD-Footing | 8/25/2017 | 8/28/2017 | 8/28/2017 | P | CANC |
Brandon Shaw
|
|
|
This inspection can be done either late in the AM or early in the PM. Jimmy will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### >> Inspection requested via web by rich prasch Inspection cancelled from web by: rich prasch
|
Issue PAID IN FULL permit | | | 8/25/2017 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/17/2017 | | DONE |
|
|
|
met
|
Routing - PLANNING | 8/16/2017 | | 8/16/2017 | | PASS |
Jeff Lowe
|
|
|
|
Plan assigned to (JAB) Josh | 7/5/2017 | 7/5/2017 | 7/11/2017 | | PASS |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 7/5/2017 | | 7/11/2017 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 7/11/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/11/2017 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Routing - PLANNING | 7/5/2017 | | 7/5/2017 | | FAIL |
|
|
|
need to submit HOA letter
|
Plans ACCEPTED BY PLAN TECH | | | 7/5/2017 | | DONE |
|
|
|
|
Intake Approval | | | 7/5/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/5/2017 | | DONE |
|
|
|
|
Application received | | | 7/4/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 4 2017 1:30PM
|