Print Statement | | | 6/20/2018 | | DONE |
|
|
|
|
First Notice | | 5/28/2018 | 6/11/2018 | | DONE |
|
|
|
mailed 6-12
|
BLD-Final | 5/18/2018 | 5/18/2018 | 5/18/2018 | P | PASS |
Jim Storey
|
|
|
Nate Phone #: ###-####
|
Permanent Occupancy | | | 5/18/2018 | | DONE |
|
|
|
|
BLD-Final | 4/24/2018 | 4/25/2018 | 4/25/2018 | A | PART |
Jim Storey
|
|
|
Nate Phone #: ###-####
|
FIRE-Final Inspection | 4/24/2018 | 4/24/2018 | 4/24/2018 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for area of work complete.
|
BLD-Framing/Rough-in | 1/19/2018 | 1/22/2018 | 1/22/2018 | A | PASS |
Jim Storey
|
|
|
Nate Phone #: ###-####
|
BLD-Framing/Rough-in | 1/2/2018 | 1/3/2018 | 1/3/2018 | P | PASS |
Jim Storey
|
|
|
Nate Phone #: ###-#### hold downs and nailling ok to cover in and out .
|
FIRE-Conference | 12/18/2017 | 12/18/2017 | 12/18/2017 | P | DONE |
Jim Page
|
|
|
Fire conference complete.
|
Print Occupancy Form | | | 10/10/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/10/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 9/27/2017 | | |
|
|
|
|
Plan assigned to (JAR) | 7/11/2017 | 7/11/2017 | 9/27/2017 | | DONE |
Julie Romig
|
|
|
**1st Rev Comp - 3rd Rec'd 09/26 - 502 Ace Co. Additions
|
Routing - PLAN CHECK | 9/26/2017 | | 9/27/2017 | | PASS |
Julie Romig
|
|
|
3rd Review
|
Routing Off Site - STRUCTURAL | 9/26/2017 | | 9/27/2017 | | PASS |
Julie Romig
|
|
|
3rd Review - Pass per ePlanReview
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/27/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/27/2017 | | DONE |
|
|
|
all met-need
GC-MET
rev cert of val-MET
RP-MET
|
Routing Off Site - STRUCTURAL | 9/21/2017 | | 9/25/2017 | | FAIL |
Julie Romig
|
|
|
Corrections required per ePlanReview.
|
Routing - PLAN CHECK | 9/19/2017 | | 9/21/2017 | | FAIL |
Julie Romig
|
|
|
Corrections required per structural review.
|
Route to Impact Fee Review | 9/1/2017 | 9/4/2017 | 9/6/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 7/11/2017 | | 9/1/2017 | | FAIL |
Julie Romig
|
|
|
Corrections required. Plan review report emailed to applicant.
|
1st review completed | | | 9/1/2017 | | FAIL |
Julie Romig
|
|
|
|
Routing Off Site - STRUCTURAL | 7/11/2017 | | 7/24/2017 | | FAIL |
Julie Romig
|
|
|
Corrections required per ePlanReview
|
Routing - Erosion and Sediment | 7/11/2017 | | 7/13/2017 | | PASS |
Melissa Jannusch
|
|
|
Waiver approved. RP TBD
|
Routing - FIRE | 7/11/2017 | 7/11/2017 | 7/11/2017 | | PASS |
Katie Marron
|
|
|
Modifications to the fire sprinkler and alarm systems are required and indicated. No comments required.
|
Routing - Design Review | 7/11/2017 | | 7/11/2017 | | PASS |
Katelyn Menuge
|
|
|
Per DRH17-00221
|
Routing PW Solid Waste | 7/11/2017 | | 7/11/2017 | | PASS |
|
|
|
No changes are proposed to solid waste.
|
Routing PW Drainage | 7/11/2017 | | 7/11/2017 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING | 7/11/2017 | | 7/11/2017 | | PASS |
Cody Riddle
|
|
|
Approved by DR.
|
Routing - PLANNING Land Div | 7/11/2017 | | 7/11/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 7/11/2017 | | 7/11/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 7/11/2017 | | 7/11/2017 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 7/11/2017 | | PASS |
|
|
|
|
Intake Approval | | | 7/7/2017 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following:
1. Please provide a verification of Legal Lot or Parcel form signed and approved by PDS Subdivision Staff as stated in checklist but was not uploaded.
2. Please completely fill out the cover sheet of the special inspection form #310
3. Please provide an Erosion & Sediment Control (ESC) Plan Waiver Request Letter in lieu of an Erosion & Sediment Control plan or provide an Erosion & Sediment Control plan
|
Application received | | | 7/5/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 5 2017 4:42PM
|