Letter of compliance/Occupancy | | | 9/5/2018 | | DONE |
|
|
|
emailed to rattlerconst5@yahoo.com per request
|
BLD-Final | 7/11/2018 | 7/11/2018 | 7/11/2018 | P | PASS |
Jim Storey
|
|
|
Trevor Phone #: ###-#### built per mod aproved plans by planreview
|
DOC - Permit Finaled | 7/11/2018 | 7/11/2018 | 7/11/2018 | P | PASS |
Jim Storey
|
|
|
built per mod aproved plans by planreview
|
CHANGE STATUS TO (ISS) | | | 7/11/2018 | | DONE |
|
|
|
Plan Mod
|
OVERRIDE | | | 4/16/2018 | | |
|
|
|
|
BLD-Framing/Rough-in | 4/16/2018 | 4/16/2018 | 4/16/2018 | A | PASS |
Jim Storey
|
|
|
ok per plan review and si report
|
Plan assigned to (RDP) | 4/13/2018 | 4/13/2018 | 4/16/2018 | | DONE |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 4/13/2018 | | 4/16/2018 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 4/16/2018 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 4/16/2018 | | DONE |
|
|
|
PLAN MOD. DO NOT RE ISSUE
|
BLD-Energy code compliance | 4/12/2018 | 4/13/2018 | 4/13/2018 | A | PART |
Jim Storey
|
|
|
Jeff Phone #: ###-####
|
Plan Modification Accepted | | | 4/13/2018 | | DONE |
|
|
|
alt request for townhouse separation
|
BLD-Framing/Rough-in | 4/10/2018 | 4/10/2018 | 4/10/2018 | P | PART |
Jim Storey
|
|
|
Jeff Phone #: ###-#### extend prop. line fire septration through building to faicia frount and back 1st and 2nd floors// north i joist top chord repair plm// ok to insulate.
|
BLD-Wall Bracing | 2/21/2018 | 2/22/2018 | 2/22/2018 | A | PASS |
Jim Storey
|
|
|
Shear // Jeff Phone #: ###-####
|
Plan Modification Accepted | | | 2/8/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 2/8/2018 | | 2/8/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
Issue PAID IN FULL permit | | | 9/29/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 9/28/2017 | | |
|
|
|
|
Plan assigned to (BJM) | | 7/7/2017 | 9/28/2017 | | DONE |
Brian McGowan
|
|
|
9-21 - FAIL - 1st review complete FAIL 7/26 Townhome Level 2
|
Routing - PLAN CHECK | 9/28/2017 | | 9/28/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/28/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/28/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/28/2017 | | DONE |
|
|
|
Need
RP- Met, Parcel Owner will act as RP
GC Form (no number listed on app.)
|
Inspection Record Card- Bld | | | 9/28/2017 | | DONE |
|
|
|
|
Telephone call | | | 9/28/2017 | | DONE |
Christina Prado
|
|
|
Called Jeff to advise permit is ready pending RP and gave fees due
DO NOT ISSUE WITHOUT BLD17-02263
|
Plan resubmittals received | | | 9/25/2017 | | DONE |
|
|
|
Received two copies full set of plans and one copy structural calculations; taken to Brian McGowan
|
Routing - PLAN CHECK | 9/21/2017 | | 9/21/2017 | | FAIL |
Brian McGowan
|
|
|
Wall bracing, structure and fire rated wall issues.
|
Plan resubmittals received | | | 9/14/2017 | | DONE |
|
|
|
received two copies of plan sheets 1, 5, 9, 12, 13, 15, and 16; taken to Brian McGowan
|
1st review completed | | | 9/6/2017 | | FAIL |
Brian McGowan
|
|
|
Structural and design issues
|
Routing - PLAN CHECK | 7/13/2017 | | 9/6/2017 | | FAIL |
Brian McGowan
|
|
|
Structural and design issues
|
Routing - MECHANICAL | 8/2/2017 | | 8/2/2017 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 7/7/2017 | 7/10/2017 | 7/18/2017 | | PASS |
Eric Bilimoria
|
|
|
Can not find the parcel in the GIS system, the building permit may have been assigned a temporary parcel number
|
Routing - MECHANICAL | 7/11/2017 | | 7/13/2017 | | FAIL |
Troy James
|
|
|
emailed corrections to building energy
|
Routing - PLANNING | 7/11/2017 | | 7/11/2017 | | PASS |
Brent Moore
|
|
|
|
Routing - Addressing | 7/7/2017 | | 7/11/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | | | 7/11/2017 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/7/2017 | | DONE |
|
|
|
|
Intake Approval | | | 7/7/2017 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/7/2017 | | DONE |
|
|
|
|
Telephone call | | | 7/6/2017 | | DONE |
|
|
|
called Trever to let know the plan review fee needs paid-left message on his phone
|
Application received | | 7/6/2017 | | | |
|
|
|
|