BLD-Framing/Rough-in | 9/18/2017 | 9/19/2017 | 9/19/2017 | A | PASS |
Dave Hannah
|
|
|
please call eric murphy for access 30 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by Eric Murphy
|
CHANGE STATUS TO (ISS) | | | 9/18/2017 | | DONE |
|
|
|
|
Plan assigned to (JAB) Josh | 9/11/2017 | 9/11/2017 | 9/14/2017 | | PASS |
Josh Bogle
|
|
|
Plan Mod
|
Routing - PLAN CHECK | 9/11/2017 | | 9/14/2017 | | PASS |
Carl D Madsen
|
|
|
|
Permit Ready to Issue | | | 9/14/2017 | | DONE |
|
|
|
DO NOT REISSUE, plan mod. Fee due. All requirements met
|
Routing PW Grading-Hillside | 9/11/2017 | | 9/12/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Plan Modification Accepted | | | 9/11/2017 | | DONE |
Christina Prado
|
|
|
Additional structural elements
|
BLD-Footing | 8/17/2017 | 8/18/2017 | 8/18/2017 | A | PASS |
Dave Hannah
|
|
|
Please call Eric Murphy @ ###-#### 30 minutes ahead for access Phone #: ###-#### Inspection requested via web by Eric Murphy
|
Issue PAID IN FULL permit | | | 8/8/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/8/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/7/2017 | | 7/12/2017 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 7/12/2017 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2017 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 7/12/2017 | | DONE |
|
|
|
Need GC Form and Revised Cert of Value
|
Application received | | | 7/7/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 7 2017 10:27AM
|
Intake Approval | | | 7/7/2017 | | PASS |
|
|
|
|