CHANGE STATUS TO (FNL) | | | 4/3/2018 | | DONE |
Christina Prado
|
|
|
per all passing inspections
|
Letter of compliance/Occupancy | | | 4/3/2018 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 4/2/2018 | 4/2/2018 | 4/2/2018 | | DONE |
Tiffany Lowery
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/26/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/26/2018 | | DONE |
|
|
|
|
Zoning Approval | 3/20/2018 | 3/20/2018 | 3/20/2018 | | DONE |
Andrea Tuning
|
|
|
|
OVERRIDE | | | 2/28/2018 | | |
|
|
|
|
Plan assigned to (CJW) | 2/20/2018 | 2/20/2018 | 2/28/2018 | | PASS |
Carl Westfall
|
|
|
x plan mod
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/28/2018 | | |
|
|
|
PLEASE DO NOT RE ISSUE
|
Routing Off Site - STRUCTURAL | 2/26/2018 | | 2/27/2018 | | PASS |
Carl Westfall
|
|
|
Ashley Thompson (KPFF)
|
Routing - Design Review | 2/26/2018 | | 2/27/2018 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLUMBING | 2/26/2018 | | 2/27/2018 | | PASS |
Bill VanDegrift
|
|
|
|
BLD-Final | 2/26/2018 | 2/27/2018 | 2/26/2018 | A | PASS |
Jim Sly
|
|
|
Tim Phone #: ###-#### Shell/core Final OK.
|
Zoning Approval Temp | 2/26/2018 | 2/26/2018 | 2/26/2018 | | DONE |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 2/20/2018 | | 2/26/2018 | | PASS |
Carl Westfall
|
|
|
Pending structural
|
BLD-Conference | 2/22/2018 | 2/22/2018 | 2/23/2018 | P | DONE |
Jim Sly
|
|
|
Tim Phone #: ###-####
|
FIRE-Final Inspection | 2/21/2018 | 2/22/2018 | 2/22/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Tim Phone #: ###-####
|
Plan Modification Accepted | | | 2/20/2018 | | DONE |
Christina Prado
|
|
|
Plan Mod for misc updates - east wall framing, drive thru pergola, mechanical equipment clarification, roof penetration, remove floor sink and update electrical panel
|
BLD-Footing | 2/15/2018 | 2/16/2018 | 2/16/2018 | A | PART |
Jim Sly
|
|
|
Tim Phone #: ###-#### Pergola footings......Terracon special inspection.
|
BLD-Conference | 1/18/2018 | 1/19/2018 | 1/19/2018 | A | DONE |
Jim Sly
|
|
|
Tim Phone #: ###-####
|
BLD-Energy code compliance | 12/28/2017 | 12/29/2017 | 12/29/2017 | A | PASS |
Jim Sly
|
|
|
Tim Phone #: ###-####
|
BLD-Framing/Rough-in | 12/27/2017 | 12/27/2017 | 12/27/2017 | P | PASS |
Jim Sly
|
|
|
Tim Phone #: ###-####
|
BLD-Framing/Rough-in | 12/12/2017 | 12/13/2017 | 12/13/2017 | P | PART |
Jim Sly
|
|
|
Tim Phone #: ###-#### Exterior Shear nailing only....OK.
|
BLD-Footing | 11/8/2017 | 11/9/2017 | 11/9/2017 | A | PEND |
Jim Sly
|
|
|
Tim Phone #: ###-#### Many clearance issues......Terricon on site. OK pending Terricon special inspection, tests and approvals.
|
BLD-Footing | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | PART |
Jim Storey
|
|
|
Tim Phone #: ###-#### ufer ground in place/ si taracon need min bar clearance.
|
Issue PAID IN FULL permit | | | 11/6/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/6/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 10/26/2017 | | |
|
|
|
|
Plan assigned to (CJW) | 8/9/2017 | 8/9/2017 | 10/26/2017 | | PASS |
Carl Westfall
|
|
|
(3rd done) (Sept 11 - 25 days) (35 sheets) Starbucks Shell
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/26/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/26/2017 | | DONE |
|
|
|
Need
RP- Met
|
Routing Off Site - STRUCTURAL | 10/19/2017 | | 10/25/2017 | | PASS |
Carl Westfall
|
|
|
Ashley Thompson (KPFF)
|
Routing - Design Review | 10/19/2017 | | 10/19/2017 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 10/18/2017 | | 10/19/2017 | | PASS |
Carl Westfall
|
|
|
Pending structural
|
Plan resubmittals received | | | 10/18/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 10/9/2017 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/2/2017 | | 10/9/2017 | | FAIL |
Carl Westfall
|
|
|
Ashley Thompson (KPFF)
|
Routing - Design Review | 10/2/2017 | | 10/5/2017 | | FAIL |
Andrea Tuning
|
|
|
|
Routing PW Sewer Design | 10/2/2017 | | 10/5/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Approved under GRD17-00040.
|
Routing - PLUMBING | 10/2/2017 | | 10/3/2017 | | PASS |
Daryl Spivey
|
|
|
per plans and ISPC
|
Routing - MECHANICAL | 10/2/2017 | | 10/2/2017 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLAN CHECK | 9/29/2017 | | 10/2/2017 | | PASS |
Carl Westfall
|
|
|
pending structural
|
Plan resubmittals received | | | 9/29/2017 | | DONE |
|
|
|
|
Route to Impact Fee Review | 9/20/2017 | 9/23/2017 | 9/22/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 9/20/2017 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 9/20/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/9/2017 | | 9/20/2017 | | FAIL |
Carl Westfall
|
|
|
|
Routing PW Environmental | 8/10/2017 | | 9/15/2017 | | PASS |
Rick Christenson
|
|
|
Per 1500 Gallon Exterior Grease Interceptor
|
Routing - FIRE | 8/9/2017 | 8/9/2017 | 8/23/2017 | | PASS |
Scott Arellano
|
|
|
Attached comments to plans.
|
Routing Off Site - STRUCTURAL | 8/9/2017 | | 8/23/2017 | | FAIL |
Carl Westfall
|
|
|
Ashley Thompson (KPFF)
|
Routing - Addressing | 8/9/2017 | | 8/21/2017 | | PASS |
Doug Chausow
|
|
|
Corrected address to 13681 W Chinden Blvd
|
Routing PW Solid Waste | 8/10/2017 | | 8/21/2017 | | PASS |
Evan Carpenter
|
|
|
Solid waste enclosure must be built according to the site plan (C3) and not the architectural site plan (A1.0). The enclosure on A1.0 does not allow for adequate collection vehicle access.
|
Routing PW Street Lights | 8/10/2017 | | 8/16/2017 | | PASS |
Tom Marshall
|
|
|
|
Routing - Erosion and Sediment | 8/14/2017 | | 8/14/2017 | | PASS |
Andy J. Long
|
|
|
ESC project narrative approved. Vertical Construction will need to provide valid RP.
|
Routing PW Sewer Design | 8/10/2017 | | 8/10/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Show connection to public sewer.
|
Routing - PUBLIC WORKS | 8/9/2017 | | 8/10/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Drainage | 8/10/2017 | | 8/10/2017 | | PASS |
Brian Murphy
|
|
|
PAD ENGINEER LETTER
|
Routing - MECHANICAL | 8/9/2017 | | 8/10/2017 | | FAIL |
Troy James
|
|
|
Need to provide mechanical com check
|
Routing - PLUMBING | 8/9/2017 | | 8/10/2017 | | PASS |
Bill VanDegrift
|
|
|
See redline notes
Per plan and ISPC.
|
Routing - PLANNING | 8/9/2017 | | 8/10/2017 | | PASS |
Brent Moore
|
|
|
|
Routing - PLANNING Land Div | 8/9/2017 | | 8/10/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Design Review | 8/9/2017 | | 8/9/2017 | | FAIL |
Andrea Tuning
|
|
|
The site plan and landscape plan will be required to match one another.
Install a landscape planter island in the western row of parking that is a minimum of 8-feet in width (interior dimensions) and includes the required Class II or Class III tree with low shrubs or other vegetative groundcover.
c. Provide a minimum of 17 parking spaces on the site.
d. Provide a total of 2 bicycle parking spaces. The spaces shall be conveniently located, a minimum of 6 feet long and 2.5 feet wide, have an overhead clearance of 7 feet, provide a 4 foot wide aisle is required between rows of bicycle parking spaces and installed on a non-permeable surfaces and anchored to the ground.
Comply with the requirements of the Public Works Division in regard to the size and location of the trash enclosure.
Install weather protection that is a minimum of 3-feet in depth on the south and east elevations.
Install a dense landscaping to screen the entire north facing façade.
|
Intake Approval | | | 8/9/2017 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 8/8/2017 | | PASS |
|
|
|
The applicant finished his task on August 3 (Thursday). Carl J. Westfall was on vacation on August 2, 3, and 4 but worked on August 5 (Saturday). ePlanReview was unavailable to route drawings because of an upgraded. The plan intake review was approved on Tuesday, August 8.
|
Intake Approval | | | 7/28/2017 | | FAIL |
|
|
|
(7-28-17) Please upload the heating and cooling load calculations and the ESC narrative. CJW
|
Intake Approval | | | 7/26/2017 | | FAIL |
|
|
|
(7-26-17) Please upload those documents into GRD17-00040 that are noted as being provided under that permit. Please provide the other items circled in the plan intake checklist that are not part of GRD17-00040. If you have questions, call me. CJW
|
Intake Approval | | | 7/12/2017 | | FAIL |
|
|
|
Please complete and sign the Plan Intake Checklist Form 502. Please provide the items that have been circled in that checklist. Note that the file names for the drawings uploaded in ePlanReview were changed to reflect the ePlanReview standards adopted by the City of Boise. CJW
|
Application received | | | 7/10/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 10 2017 8:03AM
|