Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD17-02307
StatusFinaled
Name BRIGHTON STUDIO INC
Site Address 3234 E FRONT RUNNER LN
Project NamePP-03-8801
Customer NumberBLD17-02351 & BLD17-02352
ePlanReviewYes
Description
(3 PERMITS FILED UNDER BLD17-02307 IN EPLANREVIEW) FLOODPLAIN. Permit for the construction of a new 1765 sq. ft., three story (first story 385 sq. ft., second story 955 sq. ft., third story 125 sq ft) single family dwelling with 3 bedrooms, 3 bathrooms, approximately 47 sq. ft. of covered patio/porch and a 505 sq. ft. attached garage per the approved plans. SP-02 zoning and setbacks per planning. ***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/2/20185/2/20185/2/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Braxton Hansen
DOC - Permit Finaled5/2/20185/2/20185/2/2018PPASS
DetailsBrandon Shaw
BLD-Energy code compliance1/23/20181/23/20181/23/2018APASS
DetailsBrandon Shaw
Corrections sat
BLD-Energy code compliance1/19/20181/22/20181/22/2018PPEND
DetailsBrandon Shaw
Soffits to be fire protected and man holes at firewall/area seperation walls patched
BLD-Framing/Rough-in1/17/20181/18/20181/18/2018APASS
DetailsBrandon Shaw
OK to insulate
BLD-Wall cover12/1/201712/1/201712/1/2017APART
DetailsBrandon Shaw
First floor

Work in Progress
BLD-Conference11/30/201711/30/201711/30/2017APEND
DetailsBrandon Shaw
Fire/area seperation walls

Work in Progress
BLD-Foundation10/6/201710/6/201710/6/2017PPASS
DetailsBrandon Shaw
Doug Phone #: ###-####
BLD-Foundation10/4/201710/5/201710/5/2017PCANC
DetailsBrandon Shaw
Doug Phone #: ###-####
BLD-Footing10/3/201710/4/201710/4/2017APASS
DetailsBrandon Shaw
Doug Phone #: ###-####
Issue PAID IN FULL permit  9/18/2017 DONE
Inspection Record Card- Bld  9/18/2017 DONE
OVERRIDE  9/14/2017  
Plan assigned to (BJM)7/25/20177/25/20179/14/2017 DONE
DetailsBrian McGowan
7/21 sfd ePlan
Routing - PLAN CHECK7/25/2017 9/14/2017 PASS
DetailsBrian McGowan
1st review completed  9/14/2017 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  9/14/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  9/14/2017 DONE
Need RP
Routing - MECHANICAL9/5/2017 9/5/2017 PASS
DetailsTroy James
Routing PW Flood Plain7/25/2017 8/1/2017 PASS
DetailsJason C. Taylor
No review required LOMR in place. JCT
Route to Impact Fee Review7/25/20177/28/20177/26/2017 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL7/25/2017 7/26/2017 FAIL
DetailsTroy James
emailed corrections to legends mech
Routing - PLANNING7/25/2017 7/25/2017 PASS
DetailsKatelyn Menuge
DRH17-00173
Routing - Addressing7/25/2017 7/25/2017 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS7/25/2017 7/25/2017 PASS
DetailsRachael Beierle
Routing - Design Review7/25/2017 7/25/2017 PASS
DetailsKatelyn Menuge
DRH17-00173
Plans ACCEPTED BY PLAN TECH  7/25/2017 DONE
Intake Approval  7/25/2017 PASS
Recd Pcfee & Taken To Pln CK  7/25/2017 DONE
Application received  7/10/2017 DONE
Application submitted via PDS Online on Jul 10 2017 3:02PM