BLD-Aging Inspection | 6/21/2019 | 6/21/2019 | 6/21/2019 | | DONE |
Tell Riley
|
|
|
Expires: 08/06/19
|
BLD-Framing/Rough-in | 2/6/2019 | 2/7/2019 | 2/7/2019 | A | PASS |
Jim Sly
|
|
|
Brett Phone #: ###-####
|
BLD-Framing/Rough-in | 1/10/2019 | 1/11/2019 | 1/11/2019 | A | PART |
Jim Sly
|
|
|
Brett Phone #: ###-#### Shear only........OK.
|
BLD-Foundation | 9/10/2018 | 9/10/2018 | 9/10/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Wall Bracing | 9/7/2018 | 9/7/2018 | 9/10/2018 | P | NR |
Jim Sly
|
|
|
steam // Rusty Phone #: ###-####
|
BLD-Footing | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | PASS |
Jim Sly
|
|
|
Rusty Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/28/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 8/24/2018 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 6/26/2018 | 6/26/2018 | 8/24/2018 | | PASS |
Josh Bogle
|
|
|
1st done - waiting on Limited Geotech
|
Routing - PLAN CHECK | 6/26/2018 | | 8/24/2018 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 8/24/2018 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 8/24/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/24/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 8/24/2018 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 6/26/2018 | | 8/9/2018 | | CANC |
Melissa Jannusch
|
|
|
Removed from hillside layer. Limited geotechnical report no longer required --MMJ & JCT
|
Routing Walk-In (PW Hillside) | 6/26/2018 | 6/26/2018 | 6/26/2018 | | FAIL |
Melissa Jannusch
|
|
|
Will need a limited geotechncial report before intake. No grading or drainage plan required. Will require a subgrade inspection.
|
Routing Walk-In (BLD) | 6/26/2018 | 6/26/2018 | 6/26/2018 | P | PASS |
Josh Bogle
|
|
|
took in as a level 2 Hillside - waitng on a limited geotech report
|
Routing Walk-In (BLD) | 6/15/2018 | 6/15/2018 | 6/15/2018 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/15/2018 | | 6/15/2018 | | FAIL |
Josh Bogle
|
|
|
plans lacked needed structural details
|
1st review completed | | | 6/15/2018 | | FAIL |
Josh Bogle
|
|
|
|
Routing Walk-In (Zoning) | 7/11/2017 | 7/11/2017 | 7/11/2017 | A | PASS |
Jeff Lowe
|
|
|
hillside touches rear of Lot where no work is being performed. front setback to be measured from property line, not curb.
|
Meeting | | | 7/11/2017 | | DONE |
Josh Bogle
|
|
|
needs to be seen by JCT but Josh will look at it to see if there is anything else is needed
|
Application received | | 7/11/2017 | | | |
|
|
|
|